New planned asset
63Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance63

  • Project scale (MW)12
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3

Signal materiality33

  • Event type20
  • MW affected8
  • Units affected5

New planned wind development signal — 2 units / 11.12 MW

Hagen, Nordrhein-Westfalen · Operator: SL Windenergie GmbH

2 planned units · 11.12 MW · First observed 17 Oct 2026

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorSL Windenergie GmbH

2 new planned wind units totalling 11.12 MW were first observed in this MaStR snapshot.

Why this ranks high. Freshly registered planned asset and the registered operator is known. Small combined capacity (11.12 MW); a targeted external search found no reliable corroborating source yet, which is not proof that the project does not exist.

External verification: Searched, no reliable evidence found

A targeted search (5 queries) found no sufficiently reliable external source for this wind development in Hagen. This does not show that the project does not exist. No public procurement evidence was found in this verification run.

Project company
SL Windenergie GmbH (registered in MaStR; not confirmed externally)
Developer
Not identified
Project evidence
None
Commercial evidence
None found

We searched and found no reliable external evidence yet. This is not proof that the project does not exist.

  • Gemeinde Hagen im Bremischen: BauleitpläneMunicipal planning document · hagen-cux.de · Publication date unknown · low confidenceSupports: locationVerified from page text
  • G e n e h m i g u n g s b e s c h e i dPermit document · hagen.de · Published 12 Sept 2025 · low confidenceSupports: locationVerified from PDF text · page 1“… den dort genannten Standorten zu errichten und zu betreiben. (Repowering) Stadt Hagen Postfach 4249 58042 Hagen Per Postzustellungsurkunde Windpark Ellinghausen GmbH & Co. KG vertr. d. d. DEW21 Windkraftbeteiligungsgesellschaft mbH vertreten d. d. Geschäftsführer Herr Maik Löhr und Herr Rüdiger Tesch Günter-Samtlebe-Platz 1 44135 Dortmund …”
  • Hagen gestaltet die Zukunft: Projekte von Windkraft bis HundewieseNews / press report · nordsee-zeitung.de · Published 21 Mar 2026 · low confidenceSupports: locationVerified from page text

No public procurement evidence was found in this verification run.

No independent external sources.

Registry lead relevance: 63 (unchanged by external verification) Searched, but no reliable external evidence was found; registry score unchanged.

A newly registered planned asset may be an early sign of a development worth a quick look.
Developer servicesGrid & electricalEngineeringCivil / BOPMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Planned units first observed
2
Total registered capacity
11.12 MW
Capacity per unit
5.56 MW each
First observed in MaStR snapshot
17 Oct 2026
Planned commissioning
15 Oct 2027

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“hohlimerw…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: searched, no reliable evidence found; a targeted search found no sufficiently reliable external source, which is not proof that the project does not exist. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

First tracked snapshot → 17 Oct 2026

← Back to the brief · 2026-10-17