New planned asset
64Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance64

  • Project scale (MW)14
  • Event type20
  • Lifecycle stage10
  • Recency5
  • Operator identified10
  • Multi-unit evidence5

Signal materiality38

  • Event type20
  • MW affected10
  • Units affected8

New planned wind development signal — 3 units / 16.68 MW

Sontra, Hessen · Operator: Trianel Wind und Solar GmbH & Co. KG

3 planned units · 16.68 MW · First observed 15 Oct 2026

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorTrianel Wind und Solar GmbH & Co. KG

3 new planned wind units totalling 16.68 MW were first observed in this MaStR snapshot.

Why this ranks high. Mid-sized 16.68 MW signal, 3 registrations moving together and the registered operator is known.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Developer servicesGrid & electricalEngineeringCivil / BOPMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Planned units first observed
3
Total registered capacity
16.68 MW
Capacity per unit
5.56 MW each
First observed in MaStR snapshot
15 Oct 2026
Planned commissioning
01 Jun 2028

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“sontra…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

First tracked snapshot → 15 Oct 2026