Schedule change
63Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance63

  • Project scale (MW)14
  • Event type12
  • Lifecycle stage10
  • Recency6
  • Operator identified10
  • Multi-unit evidence6
  • Size of change5

Signal materiality55

  • Event type16
  • Size of change19
  • MW affected10
  • Units affected10

Commissioning moved forward by up to 220 days — 4 units / 16.8 MW

Niederer Fläming, Brandenburg · Operator: Windpark Hohenseefeld 3 GmbH & Co. KG

4 units · 16.8 MW

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorWindpark Hohenseefeld 3 GmbH & Co. KG

4 wind units registered an earlier planned commissioning date (-220 days to -199 days).

Why this ranks high. Mid-sized 16.8 MW signal, 4 registrations moving together, unusually large schedule shift (220 days) and the registered operator is known. It may still reflect a registry correction rather than a new commercial need.

An earlier registered commissioning date may indicate a compressed delivery window and could bring supplier or service requirements forward. It may also be a registry correction.
Developer servicesEngineeringMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Units with a new planned date
4
Planned commissioning before
31 Aug 2028
Planned commissioning now
24 Jan – 14 Feb 2028
Shift per unit
-220 to -199 days

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Planned/commissioning dates within 21 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

15 Oct 2026 → 17 Oct 2026