New planned asset
57Lead relevance · Moderate

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance57

  • Project scale (MW)6
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • External verification3

Signal materiality25

  • Event type20
  • MW affected5

New planned wind unit — 3.6 MW

Schwedt/Oder, Brandenburg · Operator: TEUT Energieprojekte GmbH

1 planned unit · 3.6 MW · First observed 04 Nov 2026

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorTEUT Energieprojekte GmbH

A new planned wind unit of 3.6 MW was first observed in this MaStR snapshot.

Why this ranks here. Freshly registered planned asset and the registered operator is known. It affects only one 3.6 MW unit; external corroboration is only partial.

External verification: Partially corroborated

Some external sources mention a wind development in Schwedt/Oder associated with TEUT Energieprojekte GmbH, but the match to the registered project is incomplete. Public project evidence found as early as 16 Sept 2026; GridGraph first observed the MaStR registration on 4 Nov 2026. Related commercial activity (for example a supplier order or tender) was found for this company or place, but it cannot yet be tied to this exact registered project.

Project company
TEUT Energieprojekte GmbH
Developer
Not identified
Project evidence
Partial
Commercial evidence
Related activity, not pinned to this project

Related commercial activity (for example a supplier order or tender) was found for this company or place, but it cannot yet be tied to this exact registered project.

6 independent external sources.

Registry lead relevance: 54 → After external verification: 57 (+3) +3: identity or project only partially corroborated; +1 related commercial activity that cannot yet be pinned to this exact group.

A newly registered planned asset may be an early sign of a development worth a quick look.
Developer servicesGrid & electricalEngineeringCivil / BOPMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Registered capacity
3.6 MW
First observed in MaStR snapshot
04 Nov 2026
Planned commissioning
30 Oct 2029

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisSingle unit
A single MaStR registration.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: partially corroborated; 6 independent external sources at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

First tracked snapshot → 4 Nov 2026

← Back to the latest brief