Schedule change
40Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance40

  • Project scale (MW)7
  • Event type4
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change1

Signal materiality24

  • Event type16
  • Size of change2
  • MW affected6

Commissioning delayed by 6 days — 4.26 MW

Heidenheim, Bayern · Operator: JC Windkraft GmbH & Co. Vierte Hahnenkamm KG

1 unit · 4.26 MW

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorJC Windkraft GmbH & Co. Vierte Hahnenkamm KG

The registered planned commissioning date moved by +6 days (30 Oct 2026 → 05 Nov 2026).

Why this ranks here. The registered operator is known. It affects only one 4.26 MW unit; short date shifts are common registry maintenance; no external evidence yet.

A short date shift is common and may be routine registry maintenance. Worth attention mainly if it is part of a wider pattern.
Developer servicesEngineeringMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Planned commissioning
30 Oct 2026 → 05 Nov 2026 (+6 days)

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisSingle unit
A single MaStR registration.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

3 Nov 2026 → 4 Nov 2026