Schedule change
76Lead relevance · Very high
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
What this score is built from
- Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
- Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
- Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
- Recency (0-8 pts): how recent the registry snapshot is.
- Operator identified (0-10 pts): whether the registered operator name is known.
- Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
- Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).
Commissioning delay for 60 MW Gasturbinen mit Abhitzekessel in Frankfurt am Main, Hessen
Frankfurt am Main, Hessen · Operator: Mainova AG
3 units · 124.04 MW
- Registry only · external search not performed
Asset typeGasturbinen mit Abhitzekessel
Energy carrierErdgas
Registered operatorMainova AG
What changed
A later registered planned commissioning date may indicate asset delay or rescheduling.
Why it may matter
A later registered planned commissioning date may indicate asset delay or rescheduling.
Change summary
- Combined registered capacity across grouped units
- 124.04 MW
- Registered units
- 3
- Asset type
- Gasturbinen mit Abhitzekessel
- Energy carrier
- Erdgas
- Location
- Frankfurt am Main, Hessen
- Registered operator
- Mainova AG
- Operating status
- In Planung
- Planned commissioning
- Sept 2026 → Nov 2026
- Change
- +64 days
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (3)
SEE918810715130View official MaStR record ↗SEE900931819460View official MaStR record ↗SEE975123428881View official MaStR record ↗
Grouping basis
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Snapshot transition
1 Jul 2026 → 11 Sept 2026