German Energy Asset Change Intelligence — 2026-09-13

A curated, source-traceable view of registered MaStR asset updates.

1,988 registry changes detected → 45 groups selected

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

Top changes to watch (12)

Multiple changes
93Lead relevance · Very high

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Major asset update in Neukieritzsch, Sachsen

Operator: Gaskraftwerk Lippendorf GmbH

1 unit · 391.17 MW

Gasturbinen mit Abhitzekessel

Multiple material registration changes occurred in the same source transition and may warrant investigation.

Multiple material registration changes occurred in the same source transition and may warrant investigation.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Registered capacity
875 MW → 391.17 MW (-483.83 MW / -55%)
Registered operator
Lausitz Energie Kraftwerke AG → Gaskraftwerk Lippendorf GmbH
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE973821807274

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Multiple changes
93Lead relevance · Very high

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Major asset update in Spreetal, Sachsen

Operator: Gaskraftwerk Schwarze Pumpe GmbH

1 unit · 391.17 MW

Gasturbinen mit Abhitzekessel

Multiple material registration changes occurred in the same source transition and may warrant investigation.

Multiple material registration changes occurred in the same source transition and may warrant investigation.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Commissioning
Sept 2029 → Oct 2031 (+761 days)
Registered capacity
870 MW → 391.17 MW (-478.83 MW / -55%)
Registered operator
Lausitz Energie Kraftwerke AG → Gaskraftwerk Schwarze Pumpe GmbH
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE960894923635

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Capacity change
41Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Registered capacity changed for Horizontalläufer in Steinreich, Brandenburg

Operator: Alterric Deutschland GmbH

1 unit · 7.2 MW

Horizontalläufer

A material capacity increase indicates a larger registered asset capacity than in the previous snapshot.

A material capacity increase indicates a larger registered asset capacity than in the previous snapshot.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Steinreich, Brandenburg
Registered operator
Alterric Deutschland GmbH
Operating status
In Planung
Registered capacity
4.2 MW → 7.2 MW
Change
+3 MW
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE994076161874

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Multiple changes
41Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Major asset update in Großenwiehe, Schleswig-Holstein

Operator: Windpark Kieracker UG (haftungsbeschränkt) & Co. KG

1 unit · 7 MW

Horizontalläufer

Multiple material registration changes occurred in the same source transition and may warrant investigation.

Multiple material registration changes occurred in the same source transition and may warrant investigation.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Commissioning
Sept 2027 → Dec 2028 (+484 days)
Registered capacity
4.8 MW → 7 MW (+2.2 MW / 46%)
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE998320722927

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Schedule change
76Lead relevance · Very high

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Commissioning delay for 60 MW Gasturbinen mit Abhitzekessel in Frankfurt am Main, Hessen

Operator: Mainova AG

3 units · 124.04 MW

Gasturbinen mit Abhitzekessel

Planned commissioning: Sept 2026 → Nov 2026

A later registered planned commissioning date may indicate asset delay or rescheduling.

A later registered planned commissioning date may indicate asset delay or rescheduling.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Combined registered capacity across grouped units
124.04 MW
Registered units
3
Asset type
Gasturbinen mit Abhitzekessel
Energy carrier
Erdgas
Location
Frankfurt am Main, Hessen
Registered operator
Mainova AG
Operating status
In Planung
Planned commissioning
Sept 2026 → Nov 2026
Change
+64 days
Evidence and source lineage

Presentation group: 3 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE918810715130, SEE900931819460, SEE975123428881

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Schedule change
75Lead relevance · Very high

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Commissioning delay for 15 MW Horizontalläufer in Ausschließliche Wirtschaftszone

Operator: EnBW He Dreiht GmbH & Co. KG

12 units · 180 MW

Horizontalläufer

Planned commissioning: Jun 2026 → Oct 2026

A later registered planned commissioning date may indicate asset delay or rescheduling.

A later registered planned commissioning date may indicate asset delay or rescheduling.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Combined registered capacity across grouped units
180 MW
Registered units
12
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Ausschließliche Wirtschaftszone
Registered operator
EnBW He Dreiht GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Jun 2026 → Oct 2026
Change
+93 days
Evidence and source lineage

Presentation group: 12 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE959171440316, SEE983599520046, SEE923954894696, SEE998812552131, SEE980282368237, SEE926317316675, SEE918479491512, SEE980292520984, SEE951024907250, SEE977091784846, SEE956282536914, SEE908981182558

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Schedule change
68Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Commissioning delay for 6.8 MW Horizontalläufer in Namborn, Saarland

Operator: KS Energiesysteme GmbH & Co. KG

1 unit · 6.8 MW

Horizontalläufer

Planned commissioning: Jan 2026 → Sept 2029

A later registered planned commissioning date may indicate asset delay or rescheduling.

A later registered planned commissioning date may indicate asset delay or rescheduling.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Namborn, Saarland
Registered operator
KS Energiesysteme GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Jan 2026 → Sept 2029
Change
+1368 days
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE961749418528

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Operator change
35Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Registered operator changed for Horizontalläufer in Alsheim, Rheinland-Pfalz

Operator: Vattenfall Wind Mettenheim GmbH

1 unit · 7.2 MW

Horizontalläufer

A registered operator change may warrant investigation of the registered asset's current commercial context.

A registered operator change may warrant investigation of the registered asset's current commercial context.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Alsheim, Rheinland-Pfalz
Operating status
In Planung
Registered operator
ABO Energy Windpark 23 GmbH & Co. KG → Vattenfall Wind Mettenheim GmbH
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE969716045593

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Operator change
35Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Registered operator changed for Horizontalläufer in Balve, Nordrhein-Westfalen

Operator: Windpark Balver Wald Betriebs GmbH & Co. KG

1 unit · 7.2 MW

Horizontalläufer

A registered operator change may warrant investigation of the registered asset's current commercial context.

A registered operator change may warrant investigation of the registered asset's current commercial context.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Balve, Nordrhein-Westfalen
Operating status
In Planung
Registered operator
PNE AG → Windpark Balver Wald Betriebs GmbH & Co. KG
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE986579804563

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
100Lead relevance · Very high

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

New planned 880.4 MW Gasturbinen mit nachgeschalteter Dampfturbine in Voerde (Niederrhein), Nordrhein-Westfalen

Operator: RWE Generation SE

1 unit · 880.4 MW

Gasturbinen mit nachgeschalteter Dampfturbine

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
First observed
2026-09-11
Registered capacity
880.4 MW
Asset type
Gasturbinen mit nachgeschalteter Dampfturbine
Energy carrier
Erdgas
Location
Voerde (Niederrhein), Nordrhein-Westfalen
Registered operator
RWE Generation SE
Operating status
In Planung
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 11 Sept 2026
MaStR unit IDs: SEE952338852908

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
100Lead relevance · Very high

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

New planned 878.1 MW Gasturbinen mit nachgeschalteter Dampfturbine in Bergkamen, Nordrhein-Westfalen

Operator: Gaskraftwerk Bergkamen GmbH

1 unit · 878.1 MW

Gasturbinen mit nachgeschalteter Dampfturbine

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
First observed
2026-09-11
Registered capacity
878.1 MW
Asset type
Gasturbinen mit nachgeschalteter Dampfturbine
Energy carrier
Erdgas
Location
Bergkamen, Nordrhein-Westfalen
Registered operator
Gaskraftwerk Bergkamen GmbH
Operating status
In Planung
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 11 Sept 2026
MaStR unit IDs: SEE977698856878

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
100Lead relevance · Very high

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

New planned 850.8 MW Gasturbinen mit nachgeschalteter Dampfturbine in Gundremmingen, Bayern

Operator: RWE Generation SE

29 units · 979.85 MW

Gasturbinen mit nachgeschalteter Dampfturbine

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Combined registered capacity across grouped units
979.85 MW
Registered units
29
First observed
2026-09-11
Registered capacity
850.8 MW
Asset type
Gasturbinen mit nachgeschalteter Dampfturbine
Energy carrier
Erdgas
Location
Gundremmingen, Bayern
Registered operator
RWE Generation SE
Operating status
In Planung
Evidence and source lineage

Presentation group: 29 registered MaStR units
Snapshot transition: First tracked snapshot → 11 Sept 2026
MaStR unit IDs: SEE968155469649, SEE965756082444, SEE977404654545, SEE922380340166, SEE971276194697, SEE900894444778, SEE921177994858, SEE914458821424, SEE983175903898, SEE965451885647, SEE966337374071, SEE976725563086, SEE916444687670, SEE945248948847, SEE996676429378, SEE947943737238, SEE929785881829, SEE906781049569, SEE939324670579, SEE926409412711, SEE983030959862, SEE905999571060, SEE996406323853, SEE979170976159, SEE988691126752, SEE935934259715, SEE907381622664, SEE905951934490, SEE966786659767

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

New large assets (8)

New planned asset
100Lead relevance · Very high

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

New planned 846 MW Gasturbinen mit nachgeschalteter Dampfturbine in Zolling, Bayern

Operator: Onyx Kraftwerk Zolling GmbH &Co. KGaA

1 unit · 846 MW

Gasturbinen mit nachgeschalteter Dampfturbine

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
First observed
2026-09-11
Registered capacity
846 MW
Asset type
Gasturbinen mit nachgeschalteter Dampfturbine
Energy carrier
Erdgas
Location
Zolling, Bayern
Registered operator
Onyx Kraftwerk Zolling GmbH &Co. KGaA
Operating status
In Planung
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 11 Sept 2026
MaStR unit IDs: SEE989789402819

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
100Lead relevance · Very high

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

New planned 817.6 MW gas-generation asset in Schkopau, Sachsen-Anhalt

Operator: GKS GmbH

1 unit · 817.6 MW

gas-generation asset

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
First observed
2026-09-11
Registered capacity
817.6 MW
Energy carrier
Erdgas
Location
Schkopau, Sachsen-Anhalt
Registered operator
GKS GmbH
Operating status
In Planung
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 11 Sept 2026
MaStR unit IDs: SEE943675181523

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
100Lead relevance · Very high

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Two new planned generation units in Gelsenkirchen, Nordrhein-Westfalen — 889.6 MW combined

Operator: Uniper Kraftwerke GmbH

2 units · 889.6 MW

Gasturbinen mit nachgeschalteter Dampfturbine

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Combined registered capacity across grouped units
889.6 MW
Registered units
2
First observed
2026-09-11
Registered capacity
593.6 MW
Asset type
Gasturbinen mit nachgeschalteter Dampfturbine
Energy carrier
Erdgas
Location
Gelsenkirchen, Nordrhein-Westfalen
Registered operator
Uniper Kraftwerke GmbH
Operating status
In Planung
Evidence and source lineage

Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 11 Sept 2026
MaStR unit IDs: SEE930896060355, SEE985837541271

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
100Lead relevance · Very high

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Two new planned generation units in Großkrotzenburg, Hessen — 887.2 MW combined

Operator: Uniper Kraftwerke GmbH

2 units · 887.2 MW

Gasturbinen mit nachgeschalteter Dampfturbine

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Combined registered capacity across grouped units
887.2 MW
Registered units
2
First observed
2026-09-11
Registered capacity
592 MW
Asset type
Gasturbinen mit nachgeschalteter Dampfturbine
Energy carrier
Erdgas
Location
Großkrotzenburg, Hessen
Registered operator
Uniper Kraftwerke GmbH
Operating status
In Planung
Evidence and source lineage

Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 11 Sept 2026
MaStR unit IDs: SEE942562077253, SEE952825206252

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
100Lead relevance · Very high

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Two new planned generation units in Karlsruhe, Baden-Württemberg — 875.8 MW combined

Operator: EnBW Energie Baden-Württemberg AG

2 units · 875.8 MW

Gasturbinen mit Abhitzekessel

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Combined registered capacity across grouped units
875.8 MW
Registered units
2
First observed
2026-09-11
Registered capacity
585.3 MW
Asset type
Gasturbinen mit Abhitzekessel
Energy carrier
Erdgas
Location
Karlsruhe, Baden-Württemberg
Registered operator
EnBW Energie Baden-Württemberg AG
Operating status
In Planung
Evidence and source lineage

Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 11 Sept 2026
MaStR unit IDs: SEE983841802050, SEE967019366087

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
100Lead relevance · Very high

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Two new planned 560 MW units in Boxberg/O.L., Sachsen — 1.12 GW combined

Operator: Lausitz Energie Kraftwerke AG

2 units · 1120 MW

Sonstige

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Combined registered capacity across grouped units
1.12 GW
Registered units
2
First observed
2026-09-11
Registered capacity
560 MW
Asset type
Sonstige
Energy carrier
Erdgas
Location
Boxberg/O.L., Sachsen
Registered operator
Lausitz Energie Kraftwerke AG
Operating status
In Planung
Evidence and source lineage

Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 11 Sept 2026
MaStR unit IDs: SEE913385327436, SEE998894554863

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
100Lead relevance · Very high

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Four new planned 560 MW units in Heinersbrück, Brandenburg — 2.24 GW combined

Operator: Lausitz Energie Kraftwerke AG

4 units · 2240 MW

Sonstige

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Combined registered capacity across grouped units
2.24 GW
Registered units
4
First observed
2026-09-11
Registered capacity
560 MW
Asset type
Sonstige
Energy carrier
Erdgas
Location
Heinersbrück, Brandenburg
Registered operator
Lausitz Energie Kraftwerke AG
Operating status
In Planung
Evidence and source lineage

Presentation group: 4 registered MaStR units
Snapshot transition: First tracked snapshot → 11 Sept 2026
MaStR unit IDs: SEE930140896327, SEE932992642459, SEE954455333353, SEE950406601014

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
100Lead relevance · Very high

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Two new planned generation units in Werne, Nordrhein-Westfalen — 837.9 MW combined

Operator: RWE Generation SE

2 units · 837.9 MW

Gasturbinen mit nachgeschalteter Dampfturbine

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Combined registered capacity across grouped units
837.9 MW
Registered units
2
First observed
2026-09-11
Registered capacity
559.04 MW
Asset type
Gasturbinen mit nachgeschalteter Dampfturbine
Energy carrier
Erdgas
Location
Werne, Nordrhein-Westfalen
Registered operator
RWE Generation SE
Operating status
In Planung
Evidence and source lineage

Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 11 Sept 2026
MaStR unit IDs: SEE998106364693, SEE914454617243

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
↑ Back to top

Timing changes (8)

Schedule change
68Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Commissioning delayed for 5 registered wind units in Wanderup, Schleswig-Holstein

Operator: Windpark Kieracker UG (haftungsbeschränkt) & Co. KG

5 units · 35 MW

Horizontalläufer

Planned commissioning: Sept 2027 → Dec 2028

A later registered planned commissioning date may indicate asset delay or rescheduling.

A later registered planned commissioning date may indicate asset delay or rescheduling.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Registered units
5
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Wanderup, Schleswig-Holstein
Registered operator
Windpark Kieracker UG (haftungsbeschränkt) & Co. KG
Operating status
In Planung
Planned commissioning
Sept 2027 → Dec 2028
Change
+484 days
Evidence and source lineage

Presentation group: 5 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE908700689801, SEE922923759974, SEE931873921669, SEE945040736536, SEE917466400421

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Schedule change
68Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Commissioning delayed for 4 registered wind units in Cottbus, Brandenburg

Operator: LEWP Cottbus Ost GmbH & Co. KG

4 units · 28.8 MW

Horizontalläufer

Planned commissioning: Nov 2027 → Aug 2028

A later registered planned commissioning date may indicate asset delay or rescheduling.

A later registered planned commissioning date may indicate asset delay or rescheduling.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Registered units
4
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Cottbus, Brandenburg
Registered operator
LEWP Cottbus Ost GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Nov 2027 → Aug 2028
Change
+262 days
Evidence and source lineage

Presentation group: 4 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE942948643645, SEE987542532940, SEE937613613726, SEE917103359570

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Schedule change
68Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Commissioning delayed for 2 registered wind units in Rabenau, Hessen

Operator: JUWI GmbH

2 units · 14 MW

Horizontalläufer

Planned commissioning: Jul 2027 → Sept 2028

A later registered planned commissioning date may indicate asset delay or rescheduling.

A later registered planned commissioning date may indicate asset delay or rescheduling.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Registered units
2
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Rabenau, Hessen
Registered operator
JUWI GmbH
Operating status
In Planung
Planned commissioning
Jul 2027 → Sept 2028
Change
+430 days
Evidence and source lineage

Presentation group: 2 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE907274528790, SEE920775722245

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Schedule change
65Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Commissioning delayed for 4 registered wind units in Erkelenz, Nordrhein-Westfalen

Operator: MLK Windpark Katzem Nr. 120 GmbH & Co. KG

4 units · 28 MW

Horizontalläufer

Planned commissioning: Dec 2027 → Mar 2028

A later registered planned commissioning date may indicate asset delay or rescheduling.

A later registered planned commissioning date may indicate asset delay or rescheduling.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Registered units
4
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Erkelenz, Nordrhein-Westfalen
Registered operator
MLK Windpark Katzem Nr. 120 GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Dec 2027 → Mar 2028
Change
+91 days
Evidence and source lineage

Presentation group: 4 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE909649762150, SEE968050289519, SEE945969793870, SEE902855053067

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Schedule change
68Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Commissioning delayed for 6.9 MW Horizontalläufer Ennigerloh, Nordrhein-Westfalen

Operator: BeBüWind GbR

1 unit · 6.9 MW

Horizontalläufer

Planned commissioning: Jun 2027 → Jan 2028

A later registered planned commissioning date may indicate asset delay or rescheduling.

A later registered planned commissioning date may indicate asset delay or rescheduling.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Ennigerloh, Nordrhein-Westfalen
Registered operator
BeBüWind GbR
Operating status
In Planung
Planned commissioning
Jun 2027 → Jan 2028
Change
+215 days
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE914845418510

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Schedule change
68Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Commissioning delayed for 5.56 MW Horizontalläufer Rheda-Wiedenbrück, Nordrhein-Westfalen

Operator: Windrad Lintel II E 160 GmbH & Co. KG

1 unit · 5.56 MW

Horizontalläufer

Planned commissioning: Dec 2027 → May 2028

A later registered planned commissioning date may indicate asset delay or rescheduling.

A later registered planned commissioning date may indicate asset delay or rescheduling.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Rheda-Wiedenbrück, Nordrhein-Westfalen
Registered operator
Windrad Lintel II E 160 GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Dec 2027 → May 2028
Change
+122 days
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE921675264750

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Schedule change
68Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Commissioning delayed for 2 registered wind units in Kruft, Rheinland-Pfalz

Operator: ABO Energy Windpark 18 GmbH & Co. KG

2 units · 12.4 MW

Horizontalläufer

Planned commissioning: Aug 2026 → Dec 2029

A later registered planned commissioning date may indicate asset delay or rescheduling.

A later registered planned commissioning date may indicate asset delay or rescheduling.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Registered units
2
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Kruft, Rheinland-Pfalz
Registered operator
ABO Energy Windpark 18 GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Aug 2026 → Dec 2029
Change
+1241 days
Evidence and source lineage

Presentation group: 2 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE905876661358, SEE959947585593

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Schedule change
68Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Commissioning delayed for 6.8 MW Horizontalläufer Drahnsdorf, Brandenburg

Operator: EE Schönerlinde GmbH & Co. KG

1 unit · 6.8 MW

Horizontalläufer

Planned commissioning: Aug 2026 → Nov 2029

A later registered planned commissioning date may indicate asset delay or rescheduling.

A later registered planned commissioning date may indicate asset delay or rescheduling.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Drahnsdorf, Brandenburg
Registered operator
EE Schönerlinde GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Aug 2026 → Nov 2029
Change
+1204 days
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE949294851786

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
↑ Back to top

Capacity changes (7)

Capacity change
46Lead relevance · Moderate

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Registered capacity reduced for 18.77 MW Kondensationsmaschine mit Entnahme Dinslaken, Nordrhein-Westfalen

Operator: DHE Dinslakener Holz-Energiezentrum GmbH & Co. KG

1 unit · 18.77 MW

Kondensationsmaschine mit Entnahme

A material capacity reduction indicates a smaller registered asset capacity than in the previous snapshot.

A material capacity reduction indicates a smaller registered asset capacity than in the previous snapshot.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Asset type
Kondensationsmaschine mit Entnahme
Energy carrier
Biomasse
Location
Dinslaken, Nordrhein-Westfalen
Registered operator
DHE Dinslakener Holz-Energiezentrum GmbH & Co. KG
Operating status
In Betrieb
Registered capacity
21.98 MW → 18.77 MW
Change
-3.2 MW
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE991539102320

Grouping basisStable MaStR location ID — SEL931383732892
Schedule change
68Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Commissioning delayed for 5 registered wind units in Wanderup, Schleswig-Holstein

Operator: Windpark Kieracker UG (haftungsbeschränkt) & Co. KG

5 units · 35 MW

Horizontalläufer

Planned commissioning: Sept 2027 → Dec 2028

A later registered planned commissioning date may indicate asset delay or rescheduling.

A later registered planned commissioning date may indicate asset delay or rescheduling.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Registered units
5
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Wanderup, Schleswig-Holstein
Registered operator
Windpark Kieracker UG (haftungsbeschränkt) & Co. KG
Operating status
In Planung
Planned commissioning
Sept 2027 → Dec 2028
Change
+484 days
Evidence and source lineage

Presentation group: 5 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE908700689801, SEE922923759974, SEE931873921669, SEE945040736536, SEE917466400421

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Capacity change
41Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Registered capacity increased across 6 registered wind units in Hilchenbach, Nordrhein-Westfalen — 36 MW combined

Operator: Alterric Deutschland GmbH

6 units · 36 MW

Horizontalläufer

A material capacity increase indicates a larger registered asset capacity than in the previous snapshot.

A material capacity increase indicates a larger registered asset capacity than in the previous snapshot.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Combined registered capacity across grouped units
36 MW
Registered units
6
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Hilchenbach, Nordrhein-Westfalen
Registered operator
Alterric Deutschland GmbH
Operating status
In Planung
Registered capacity
3.5 MW → 6 MW
Change
+2.5 MW
Evidence and source lineage

Presentation group: 6 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE924447498896, SEE987122644452, SEE938428285726, SEE947415655961, SEE912990489256, SEE981082008965

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Schedule change
68Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Commissioning delayed for 4 registered wind units in Cottbus, Brandenburg

Operator: LEWP Cottbus Ost GmbH & Co. KG

4 units · 28.8 MW

Horizontalläufer

Planned commissioning: Nov 2027 → Aug 2028

A later registered planned commissioning date may indicate asset delay or rescheduling.

A later registered planned commissioning date may indicate asset delay or rescheduling.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Registered units
4
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Cottbus, Brandenburg
Registered operator
LEWP Cottbus Ost GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Nov 2027 → Aug 2028
Change
+262 days
Evidence and source lineage

Presentation group: 4 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE942948643645, SEE987542532940, SEE937613613726, SEE917103359570

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Schedule change
68Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Commissioning delayed for 2 registered wind units in Rabenau, Hessen

Operator: JUWI GmbH

2 units · 14 MW

Horizontalläufer

Planned commissioning: Jul 2027 → Sept 2028

A later registered planned commissioning date may indicate asset delay or rescheduling.

A later registered planned commissioning date may indicate asset delay or rescheduling.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Registered units
2
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Rabenau, Hessen
Registered operator
JUWI GmbH
Operating status
In Planung
Planned commissioning
Jul 2027 → Sept 2028
Change
+430 days
Evidence and source lineage

Presentation group: 2 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE907274528790, SEE920775722245

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Capacity change
40Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Registered capacity increased across 8 registered wind units in Franzenheim, Rheinland-Pfalz — 56 MW combined

Operator: WPF Windpark Franzenheim GmbH

8 units · 56 MW

Horizontalläufer

A material capacity increase indicates a larger registered asset capacity than in the previous snapshot.

A material capacity increase indicates a larger registered asset capacity than in the previous snapshot.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Combined registered capacity across grouped units
56 MW
Registered units
8
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Franzenheim, Rheinland-Pfalz
Registered operator
WPF Windpark Franzenheim GmbH
Operating status
In Planung
Registered capacity
5.56 MW → 7 MW
Change
+1.44 MW
Evidence and source lineage

Presentation group: 8 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE987539984189, SEE987048648053, SEE940378993071, SEE914240720195, SEE995885995124, SEE969437719476, SEE947012849718, SEE984905462432

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Capacity change
40Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Registered capacity increased for 7 MW Horizontalläufer Angermünde, Brandenburg

Operator: Windkraft Neukünkendorf GmbH & Co. KG

1 unit · 7 MW

Horizontalläufer

A material capacity increase indicates a larger registered asset capacity than in the previous snapshot.

A material capacity increase indicates a larger registered asset capacity than in the previous snapshot.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Angermünde, Brandenburg
Registered operator
Windkraft Neukünkendorf GmbH & Co. KG
Operating status
In Planung
Registered capacity
5.7 MW → 7 MW
Change
+1.3 MW
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE951856471905

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
↑ Back to top

Operator changes (5)

Operator change
35Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Registered operator changed across 3 registered wind units in Möhnesee, Nordrhein-Westfalen

Operator: Berlingsen Wind GmbH & Co. KG

3 units · 21 MW

Horizontalläufer

A registered operator change may warrant investigation of the registered asset's current commercial context.

A registered operator change may warrant investigation of the registered asset's current commercial context.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Registered units
3
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Möhnesee, Nordrhein-Westfalen
Operating status
In Planung
Registered operator
Previous registered operator unavailable → Berlingsen Wind GmbH & Co. KG
Evidence and source lineage

Presentation group: 3 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE914531865147, SEE926760641706, SEE923152875817

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Operator change
35Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Registered operator changed across 2 registered wind units in Rehfelde, Brandenburg

Operator: UGE Werder Eins GmbH & Co. KG Umweltgerechte Energie

2 units · 13.6 MW

Horizontalläufer

A registered operator change may warrant investigation of the registered asset's current commercial context.

A registered operator change may warrant investigation of the registered asset's current commercial context.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Registered units
2
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Rehfelde, Brandenburg
Operating status
In Planung
Registered operator
UKA Umweltgerechte Kraftanlagen GmbH & Co. KG → UGE Werder Eins GmbH & Co. KG Umweltgerechte Energie
Evidence and source lineage

Presentation group: 2 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE970921485869, SEE930856107878

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Operator change
35Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Registered operator changed across 4 registered wind units in Werningshausen, Thüringen

Operator: UGE Werningshausen GmbH & Co. KG Umweltgerechte Energie

4 units · 27.2 MW

Horizontalläufer

A registered operator change may warrant investigation of the registered asset's current commercial context.

A registered operator change may warrant investigation of the registered asset's current commercial context.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Registered units
4
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Werningshausen, Thüringen
Operating status
In Planung
Registered operator
UKA Umweltgerechte Kraftanlagen GmbH & Co. KG → UGE Werningshausen GmbH & Co. KG Umweltgerechte Energie
Evidence and source lineage

Presentation group: 4 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE924559861731, SEE908127526208, SEE981415392723, SEE968703508400

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Operator change
35Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Registered operator changed across 13 registered wind units in Fehrbellin, Brandenburg

Operator: WP Manker-Protzen GmbH & Co.KG

13 units · 88.4 MW

Horizontalläufer

A registered operator change may warrant investigation of the registered asset's current commercial context.

A registered operator change may warrant investigation of the registered asset's current commercial context.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Registered units
13
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Fehrbellin, Brandenburg
Operating status
In Planung
Registered operator
InVentus Energie GmbH → WP Manker-Protzen GmbH & Co.KG
Evidence and source lineage

Presentation group: 13 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE901358413620, SEE981329693343, SEE998429014121, SEE947878098381, SEE964471948127, SEE932236169728, SEE920488326181, SEE954326397491, SEE980424428522, SEE977263890733, SEE924020772290, SEE978459842376, SEE941630809673

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Operator change
35Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Registered operator changed for 6.8 MW Horizontalläufer Neuruppin, Brandenburg

Operator: WP Manker-Protzen SWN GmbH & Co. KG

1 unit · 6.8 MW

Horizontalläufer

A registered operator change may warrant investigation of the registered asset's current commercial context.

A registered operator change may warrant investigation of the registered asset's current commercial context.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Neuruppin, Brandenburg
Operating status
In Planung
Registered operator
unlimited energy GmbH → WP Manker-Protzen SWN GmbH & Co. KG
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE933449299387

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
↑ Back to top

Commissioned assets (5)

Commissioned asset
27Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Asset commissioned: 2.67 MW Verbrennungsmotor Reken, Nordrhein-Westfalen

Operator: Benning Agrar-Energie GmbH

1 unit · 2.67 MW

Verbrennungsmotor

The registered asset moved from a planned MaStR operating status to a non-planned status.

The registered asset moved from a planned MaStR operating status to a non-planned status.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Asset type
Verbrennungsmotor
Energy carrier
Biomasse
Location
Reken, Nordrhein-Westfalen
Registered operator
Benning Agrar-Energie GmbH
Operating status
In Betrieb
Lifecycle change
Planned → commissioned
Commissioning date
2026-07-01
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE913060333820

Grouping basisStable MaStR location ID — SEL930098932269
Commissioned asset
28Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

5 registered wind units commissioned in Bimöhlen, Schleswig-Holstein — 32.4 MW combined

Operator: Windpark Bimöhlen GmbH & Co. KG

5 units · 32.4 MW

Horizontalläufer

The registered asset moved from a planned MaStR operating status to a non-planned status.

The registered asset moved from a planned MaStR operating status to a non-planned status.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Combined registered capacity across grouped units
32.4 MW
Registered units
5
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Bimöhlen, Schleswig-Holstein
Registered operator
Windpark Bimöhlen GmbH & Co. KG
Operating status
In Betrieb
Lifecycle change
Planned → commissioned
Commissioning date
2026-07-28
Evidence and source lineage

Presentation group: 5 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE957207568454, SEE959220888991, SEE955270649803, SEE915171284718, SEE962581958623

Grouping basisSame site, operator, technology and change type
These are separate MaStR registrations at the same site that share a registered operator, technology and the same kind of registry change in the same registry update. GridGraph groups them for presentation only and does not assert that this grouping represents one canonical development project.
Commissioned asset
28Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Asset commissioned: 6.8 MW Horizontalläufer Ottenbüttel, Schleswig-Holstein

Operator: Windpark Hohenaspe GmbH & Co. KG

1 unit · 6.8 MW

Horizontalläufer

The registered asset moved from a planned MaStR operating status to a non-planned status.

The registered asset moved from a planned MaStR operating status to a non-planned status.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Ottenbüttel, Schleswig-Holstein
Registered operator
Windpark Hohenaspe GmbH & Co. KG
Operating status
In Betrieb
Lifecycle change
Planned → commissioned
Commissioning date
2026-09-03
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE999733413310

Grouping basisStable MaStR location ID — SEL922413142965
Commissioned asset
28Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Asset commissioned: 6.8 MW Horizontalläufer Hohenaspe, Schleswig-Holstein

Operator: Windpark Hohenaspe GmbH & Co. KG

1 unit · 6.8 MW

Horizontalläufer

The registered asset moved from a planned MaStR operating status to a non-planned status.

The registered asset moved from a planned MaStR operating status to a non-planned status.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Hohenaspe, Schleswig-Holstein
Registered operator
Windpark Hohenaspe GmbH & Co. KG
Operating status
In Betrieb
Lifecycle change
Planned → commissioned
Commissioning date
2026-09-03
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE920625007102

Grouping basisStable MaStR location ID — SEL959730080854
Commissioned asset
28Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Asset commissioned: 6 MW Horizontalläufer Syke, Niedersachsen

Operator: 6. SES Wind-Betriebs GmbH & Co. KG

1 unit · 6 MW

Horizontalläufer

The registered asset moved from a planned MaStR operating status to a non-planned status.

The registered asset moved from a planned MaStR operating status to a non-planned status.

  • Registry only · external search not performed
Facts, hypotheses and how to verify
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Syke, Niedersachsen
Registered operator
6. SES Wind-Betriebs GmbH & Co. KG
Operating status
In Betrieb
Lifecycle change
Planned → commissioned
Commissioning date
2026-07-10
Evidence and source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE982161063899

Grouping basisStable MaStR location ID — SEL902521058259
↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.