Multiple changes93Lead relevance · Very high
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
What this score is built from
- Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
- Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
- Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
- Recency (0-8 pts): how recent the registry snapshot is.
- Operator identified (0-10 pts): whether the registered operator name is known.
- Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
- Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).
Major asset update in Neukieritzsch, Sachsen
Operator: Gaskraftwerk Lippendorf GmbH
1 unit · 391.17 MW
Gasturbinen mit Abhitzekessel
What changed
Multiple material registration changes occurred in the same source transition and may warrant investigation.
Why it may matter
Multiple material registration changes occurred in the same source transition and may warrant investigation.
Evidence
- Registry only · external search not performed
Facts, hypotheses and how to verify
- Registered capacity
- 875 MW → 391.17 MW (-483.83 MW / -55%)
- Registered operator
- Lausitz Energie Kraftwerke AG → Gaskraftwerk Lippendorf GmbH
Evidence and source lineage
Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE973821807274
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Underlying registrations (1)
Multiple changes93Lead relevance · Very high
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
What this score is built from
- Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
- Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
- Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
- Recency (0-8 pts): how recent the registry snapshot is.
- Operator identified (0-10 pts): whether the registered operator name is known.
- Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
- Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).
Major asset update in Spreetal, Sachsen
Operator: Gaskraftwerk Schwarze Pumpe GmbH
1 unit · 391.17 MW
Gasturbinen mit Abhitzekessel
What changed
Multiple material registration changes occurred in the same source transition and may warrant investigation.
Why it may matter
Multiple material registration changes occurred in the same source transition and may warrant investigation.
Evidence
- Registry only · external search not performed
Facts, hypotheses and how to verify
- Commissioning
- Sept 2029 → Oct 2031 (+761 days)
- Registered capacity
- 870 MW → 391.17 MW (-478.83 MW / -55%)
- Registered operator
- Lausitz Energie Kraftwerke AG → Gaskraftwerk Schwarze Pumpe GmbH
Evidence and source lineage
Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE960894923635
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Underlying registrations (1)
Capacity change41Lead relevance · Low
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
What this score is built from
- Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
- Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
- Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
- Recency (0-8 pts): how recent the registry snapshot is.
- Operator identified (0-10 pts): whether the registered operator name is known.
- Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
- Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).
Registered capacity changed for Horizontalläufer in Steinreich, Brandenburg
Operator: Alterric Deutschland GmbH
1 unit · 7.2 MW
Horizontalläufer
What changed
A material capacity increase indicates a larger registered asset capacity than in the previous snapshot.
Why it may matter
A material capacity increase indicates a larger registered asset capacity than in the previous snapshot.
Evidence
- Registry only · external search not performed
Facts, hypotheses and how to verify
- Asset type
- Horizontalläufer
- Energy carrier
- Wind
- Location
- Steinreich, Brandenburg
- Registered operator
- Alterric Deutschland GmbH
- Operating status
- In Planung
- Registered capacity
- 4.2 MW → 7.2 MW
- Change
- +3 MW
Evidence and source lineage
Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE994076161874
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Underlying registrations (1)
Multiple changes41Lead relevance · Low
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
What this score is built from
- Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
- Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
- Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
- Recency (0-8 pts): how recent the registry snapshot is.
- Operator identified (0-10 pts): whether the registered operator name is known.
- Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
- Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).
Major asset update in Großenwiehe, Schleswig-Holstein
Operator: Windpark Kieracker UG (haftungsbeschränkt) & Co. KG
1 unit · 7 MW
Horizontalläufer
What changed
Multiple material registration changes occurred in the same source transition and may warrant investigation.
Why it may matter
Multiple material registration changes occurred in the same source transition and may warrant investigation.
Evidence
- Registry only · external search not performed
Facts, hypotheses and how to verify
- Commissioning
- Sept 2027 → Dec 2028 (+484 days)
- Registered capacity
- 4.8 MW → 7 MW (+2.2 MW / 46%)
Evidence and source lineage
Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE998320722927
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Underlying registrations (1)
Schedule change76Lead relevance · Very high
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
What this score is built from
- Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
- Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
- Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
- Recency (0-8 pts): how recent the registry snapshot is.
- Operator identified (0-10 pts): whether the registered operator name is known.
- Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
- Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).
Commissioning delay for 60 MW Gasturbinen mit Abhitzekessel in Frankfurt am Main, Hessen
Operator: Mainova AG
3 units · 124.04 MW
Gasturbinen mit Abhitzekessel
Planned commissioning: Sept 2026 → Nov 2026
What changed
A later registered planned commissioning date may indicate asset delay or rescheduling.
Why it may matter
A later registered planned commissioning date may indicate asset delay or rescheduling.
Evidence
- Registry only · external search not performed
Facts, hypotheses and how to verify
- Combined registered capacity across grouped units
- 124.04 MW
- Registered units
- 3
- Asset type
- Gasturbinen mit Abhitzekessel
- Energy carrier
- Erdgas
- Location
- Frankfurt am Main, Hessen
- Registered operator
- Mainova AG
- Operating status
- In Planung
- Planned commissioning
- Sept 2026 → Nov 2026
- Change
- +64 days
Evidence and source lineage
Presentation group: 3 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE918810715130, SEE900931819460, SEE975123428881
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Underlying registrations (3)
Schedule change75Lead relevance · Very high
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
What this score is built from
- Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
- Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
- Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
- Recency (0-8 pts): how recent the registry snapshot is.
- Operator identified (0-10 pts): whether the registered operator name is known.
- Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
- Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).
Commissioning delay for 15 MW Horizontalläufer in Ausschließliche Wirtschaftszone
Operator: EnBW He Dreiht GmbH & Co. KG
12 units · 180 MW
Horizontalläufer
Planned commissioning: Jun 2026 → Oct 2026
What changed
A later registered planned commissioning date may indicate asset delay or rescheduling.
Why it may matter
A later registered planned commissioning date may indicate asset delay or rescheduling.
Evidence
- Registry only · external search not performed
Facts, hypotheses and how to verify
- Combined registered capacity across grouped units
- 180 MW
- Registered units
- 12
- Asset type
- Horizontalläufer
- Energy carrier
- Wind
- Location
- Ausschließliche Wirtschaftszone
- Registered operator
- EnBW He Dreiht GmbH & Co. KG
- Operating status
- In Planung
- Planned commissioning
- Jun 2026 → Oct 2026
- Change
- +93 days
Evidence and source lineage
Presentation group: 12 registered MaStR units
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE959171440316, SEE983599520046, SEE923954894696, SEE998812552131, SEE980282368237, SEE926317316675, SEE918479491512, SEE980292520984, SEE951024907250, SEE977091784846, SEE956282536914, SEE908981182558
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Underlying registrations (12)
Schedule change68Lead relevance · High
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
What this score is built from
- Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
- Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
- Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
- Recency (0-8 pts): how recent the registry snapshot is.
- Operator identified (0-10 pts): whether the registered operator name is known.
- Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
- Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).
Commissioning delay for 6.8 MW Horizontalläufer in Namborn, Saarland
Operator: KS Energiesysteme GmbH & Co. KG
1 unit · 6.8 MW
Horizontalläufer
Planned commissioning: Jan 2026 → Sept 2029
What changed
A later registered planned commissioning date may indicate asset delay or rescheduling.
Why it may matter
A later registered planned commissioning date may indicate asset delay or rescheduling.
Evidence
- Registry only · external search not performed
Facts, hypotheses and how to verify
- Asset type
- Horizontalläufer
- Energy carrier
- Wind
- Location
- Namborn, Saarland
- Registered operator
- KS Energiesysteme GmbH & Co. KG
- Operating status
- In Planung
- Planned commissioning
- Jan 2026 → Sept 2029
- Change
- +1368 days
Evidence and source lineage
Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE961749418528
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Underlying registrations (1)
Operator change35Lead relevance · Low
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
What this score is built from
- Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
- Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
- Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
- Recency (0-8 pts): how recent the registry snapshot is.
- Operator identified (0-10 pts): whether the registered operator name is known.
- Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
- Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).
Registered operator changed for Horizontalläufer in Alsheim, Rheinland-Pfalz
Operator: Vattenfall Wind Mettenheim GmbH
1 unit · 7.2 MW
Horizontalläufer
What changed
A registered operator change may warrant investigation of the registered asset's current commercial context.
Why it may matter
A registered operator change may warrant investigation of the registered asset's current commercial context.
Evidence
- Registry only · external search not performed
Facts, hypotheses and how to verify
- Asset type
- Horizontalläufer
- Energy carrier
- Wind
- Location
- Alsheim, Rheinland-Pfalz
- Operating status
- In Planung
- Registered operator
- ABO Energy Windpark 23 GmbH & Co. KG → Vattenfall Wind Mettenheim GmbH
Evidence and source lineage
Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE969716045593
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Underlying registrations (1)
Operator change35Lead relevance · Low
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
What this score is built from
- Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
- Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
- Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
- Recency (0-8 pts): how recent the registry snapshot is.
- Operator identified (0-10 pts): whether the registered operator name is known.
- Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
- Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).
Registered operator changed for Horizontalläufer in Balve, Nordrhein-Westfalen
Operator: Windpark Balver Wald Betriebs GmbH & Co. KG
1 unit · 7.2 MW
Horizontalläufer
What changed
A registered operator change may warrant investigation of the registered asset's current commercial context.
Why it may matter
A registered operator change may warrant investigation of the registered asset's current commercial context.
Evidence
- Registry only · external search not performed
Facts, hypotheses and how to verify
- Asset type
- Horizontalläufer
- Energy carrier
- Wind
- Location
- Balve, Nordrhein-Westfalen
- Operating status
- In Planung
- Registered operator
- PNE AG → Windpark Balver Wald Betriebs GmbH & Co. KG
Evidence and source lineage
Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Jul 2026 → 11 Sept 2026
MaStR unit IDs: SEE986579804563
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Underlying registrations (1)
New planned asset100Lead relevance · Very high
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
What this score is built from
- Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
- Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
- Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
- Recency (0-8 pts): how recent the registry snapshot is.
- Operator identified (0-10 pts): whether the registered operator name is known.
- Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
- Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).
New planned 880.4 MW Gasturbinen mit nachgeschalteter Dampfturbine in Voerde (Niederrhein), Nordrhein-Westfalen
Operator: RWE Generation SE
1 unit · 880.4 MW
Gasturbinen mit nachgeschalteter Dampfturbine
What changed
A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.
Why it may matter
A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.
Evidence
- Registry only · external search not performed
Facts, hypotheses and how to verify
- First observed
- 2026-09-11
- Registered capacity
- 880.4 MW
- Asset type
- Gasturbinen mit nachgeschalteter Dampfturbine
- Energy carrier
- Erdgas
- Location
- Voerde (Niederrhein), Nordrhein-Westfalen
- Registered operator
- RWE Generation SE
- Operating status
- In Planung
Evidence and source lineage
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 11 Sept 2026
MaStR unit IDs: SEE952338852908
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Underlying registrations (1)
New planned asset100Lead relevance · Very high
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
What this score is built from
- Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
- Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
- Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
- Recency (0-8 pts): how recent the registry snapshot is.
- Operator identified (0-10 pts): whether the registered operator name is known.
- Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
- Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).
New planned 878.1 MW Gasturbinen mit nachgeschalteter Dampfturbine in Bergkamen, Nordrhein-Westfalen
Operator: Gaskraftwerk Bergkamen GmbH
1 unit · 878.1 MW
Gasturbinen mit nachgeschalteter Dampfturbine
What changed
A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.
Why it may matter
A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.
Evidence
- Registry only · external search not performed
Facts, hypotheses and how to verify
- First observed
- 2026-09-11
- Registered capacity
- 878.1 MW
- Asset type
- Gasturbinen mit nachgeschalteter Dampfturbine
- Energy carrier
- Erdgas
- Location
- Bergkamen, Nordrhein-Westfalen
- Registered operator
- Gaskraftwerk Bergkamen GmbH
- Operating status
- In Planung
Evidence and source lineage
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 11 Sept 2026
MaStR unit IDs: SEE977698856878
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Underlying registrations (1)
New planned asset100Lead relevance · Very high
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
What this score is built from
- Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
- Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
- Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
- Recency (0-8 pts): how recent the registry snapshot is.
- Operator identified (0-10 pts): whether the registered operator name is known.
- Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
- Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).
New planned 850.8 MW Gasturbinen mit nachgeschalteter Dampfturbine in Gundremmingen, Bayern
Operator: RWE Generation SE
29 units · 979.85 MW
Gasturbinen mit nachgeschalteter Dampfturbine
What changed
A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.
Why it may matter
A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.
Evidence
- Registry only · external search not performed
Facts, hypotheses and how to verify
- Combined registered capacity across grouped units
- 979.85 MW
- Registered units
- 29
- First observed
- 2026-09-11
- Registered capacity
- 850.8 MW
- Asset type
- Gasturbinen mit nachgeschalteter Dampfturbine
- Energy carrier
- Erdgas
- Location
- Gundremmingen, Bayern
- Registered operator
- RWE Generation SE
- Operating status
- In Planung
Evidence and source lineage
Presentation group: 29 registered MaStR units
Snapshot transition: First tracked snapshot → 11 Sept 2026
MaStR unit IDs: SEE968155469649, SEE965756082444, SEE977404654545, SEE922380340166, SEE971276194697, SEE900894444778, SEE921177994858, SEE914458821424, SEE983175903898, SEE965451885647, SEE966337374071, SEE976725563086, SEE916444687670, SEE945248948847, SEE996676429378, SEE947943737238, SEE929785881829, SEE906781049569, SEE939324670579, SEE926409412711, SEE983030959862, SEE905999571060, SEE996406323853, SEE979170976159, SEE988691126752, SEE935934259715, SEE907381622664, SEE905951934490, SEE966786659767
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Underlying registrations (29)