100Lead relevance · Very high
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
What this score is built from
- Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
- Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
- Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
- Recency (0-8 pts): how recent the registry snapshot is.
- Operator identified (0-10 pts): whether the registered operator name is known.
- Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
- Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).
New planned 817.6 MW gas-generation asset in Schkopau, Sachsen-Anhalt
Schkopau, Sachsen-Anhalt · Operator: GKS GmbH
1 unit · 817.6 MW
- Registry only · external search not performed
What changed
A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.
Why it may matter
Change summary
- First observed
- 2026-09-11
- Registered capacity
- 817.6 MW
- Energy carrier
- Erdgas
- Location
- Schkopau, Sachsen-Anhalt
- Registered operator
- GKS GmbH
- Operating status
- In Planung
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (1)
SEE943675181523View official MaStR record ↗
Grouping basis
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Snapshot transition
First tracked snapshot → 11 Sept 2026