Multiple changes
41Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Major asset update in Großenwiehe, Schleswig-Holstein

Großenwiehe, Schleswig-Holstein · Operator: Windpark Kieracker UG (haftungsbeschränkt) & Co. KG

1 unit · 7 MW

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorWindpark Kieracker UG (haftungsbeschränkt) & Co. KG

Multiple material registration changes occurred in the same source transition and may warrant investigation.

Multiple material registration changes occurred in the same source transition and may warrant investigation.
Commissioning
Sept 2027 → Dec 2028 (+484 days)
Registered capacity
4.8 MW → 7 MW (+2.2 MW / 46%)

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.

1 Jul 2026 → 11 Sept 2026

← Back to the brief · 2026-09-13