Commissioned asset
Low priority28

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Asset commissioned: 6.8 MW Horizontalläufer Hohenaspe, Schleswig-Holstein

Hohenaspe, Schleswig-Holstein

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorWindpark Hohenaspe GmbH & Co. KG
The registered asset moved from a planned MaStR operating status to a non-planned status.
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Hohenaspe, Schleswig-Holstein
Registered operator
Windpark Hohenaspe GmbH & Co. KG
Operating status
In Betrieb
Lifecycle change
Planned → commissioned
Commissioning date
2026-09-03

These units also registered the change(s) below in this same update. They are shown for completeness and do not change the primary signal above.

Operator change
Registered operator
Denker & Wulf AG → Windpark Hohenaspe GmbH & Co. KG

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisStable MaStR location ID SEL959730080854

1 Jul 2026 → 11 Sept 2026

← Back to the weekly brief · 2026-09-13