What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

5 registered wind units commissioned in Bimöhlen, Schleswig-Holstein — 32.4 MW combined

Bimöhlen, Schleswig-Holstein · Operator: Windpark Bimöhlen GmbH & Co. KG

5 units · 32.4 MW

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorWindpark Bimöhlen GmbH & Co. KG

The registered asset moved from a planned MaStR operating status to a non-planned status.

The registered asset moved from a planned MaStR operating status to a non-planned status.
Combined registered capacity across grouped units
32.4 MW
Registered units
5
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Bimöhlen, Schleswig-Holstein
Registered operator
Windpark Bimöhlen GmbH & Co. KG
Operating status
In Betrieb
Lifecycle change
Planned → commissioned
Commissioning date
2026-07-28

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisSame site, operator, technology and change type
These are separate MaStR registrations at the same site that share a registered operator, technology and the same kind of registry change in the same registry update. GridGraph groups them for presentation only and does not assert that this grouping represents one canonical development project.

1 Jul 2026 → 11 Sept 2026