Intelligence brief

German Energy Asset Change Intelligence — 2026-09-30

A curated, source-traceable view of registered MaStR asset updates.

Coverage: 29 Sept → 30 Sept 2026Latest MaStR snapshot: 30 Sept 2026Snapshots compared: 2

Covers one snapshot-to-snapshot transition. Do not compare its counts with weekly or multi-day reports.

Source coverageLatest MaStR snapshot: 30 Sept 2026Brief generated: 30 Sept 2026
8Top opportunities shown
The diversified selection shown in the Top section. 26 grouped events score above the investigation threshold in total. A registry signal only: it does not establish procurement activity or buyer intent.
16New development signals
6Major schedule shifts
1Operator changes
1Commissioning events
217.26 MWNewly planned capacity

27 grouped events (units merged into likely site groups; not confirmed projects). Unit-level records: 57 registry changes across 57 registrations, 361.78 MW registered capacity.

Start here

  1. 72New planned wind development signal — 5 units / 34 MW · Aalen, Baden-Württemberg
  2. 68New planned wind development signal — 3 units / 21 MW · Haselund, Schleswig-Holstein
  3. 68New planned wind development signal — 3 units / 20.4 MW · Floß, Bayern
  4. 68New planned wind development signal — 3 units / 20.4 MW · Königsbronn, Baden-Württemberg
  5. 62Commissioning delayed by up to 27 days — 9 units / 50.04 MW · Sundern (Sauerland), Nordrhein-Westfalen

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

Top opportunities to investigate (8)

Selected from the highest-scoring investigation signals, with category diversification to avoid repetitive results. Cards are ordered by opportunity score; a higher-scoring signal of an already well-represented type may appear in a section below. Scores are deterministic and are not probabilities. Everything here is a starting point for verification, not evidence of demand.

New planned asset
72Lead relevance · High

Why this ranks high. Mid-sized 34 MW signal, 5 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance72

  • Project scale (MW)18
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality44

  • Event type20
  • MW affected13
  • Units affected11

New planned wind development signal — 5 units / 34 MW

Aalen, Baden-Württemberg · Operator: Carl Zeiss Energie GmbH

5 planned units · 34 MW · First observed 30 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 28 Dec 2029

5 new planned wind units totalling 34 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
5
Total registered capacity
34 MW
Capacity per unit
6.8 MW each
First observed in MaStR snapshot
30 Sept 2026
Planned commissioning
28 Dec 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wp kahlenbühl wea…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 5 registered MaStR units
Snapshot transition: First tracked snapshot → 30 Sept 2026
MaStR unit IDs: SEE940324989233, SEE986033226184, SEE983318020062, SEE980940684471, SEE953598971910
Commercial signals (5): cmuofbele11dywtw0te73ecaz, cmuofbelb11cjwtw0hmbs3tgx, cmuofbelb11cnwtw06npm6s1b, cmuofbelb11cqwtw0y34i2ssl, cmuofbelc11d0wtw0vurtz983

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp kahlenbühl wea…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
68Lead relevance · High

Why this ranks high. Mid-sized 21 MW signal, 3 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance68

  • Project scale (MW)15
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind development signal — 3 units / 21 MW

Haselund, Schleswig-Holstein · Operator: Bürgerwindpark Obere Arlau II Planungs-GmbH & Co. KG

3 planned units · 21 MW · First observed 30 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Sept 2029

3 new planned wind units totalling 21 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
21 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
30 Sept 2026
Planned commissioning
01 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 30 Sept 2026
MaStR unit IDs: SEE914902698893, SEE987052575710, SEE975730311439
Commercial signals (3): cmuofbeld11diwtw0kh7es6ki, cmuofbelb11ciwtw0kkjg9a7i, cmuofbelc11cywtw04bi2wzkg

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
68Lead relevance · High

Why this ranks high. Mid-sized 20.4 MW signal, 3 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance68

  • Project scale (MW)15
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind development signal — 3 units / 20.4 MW

Floß, Bayern · Operator: Max Bögl Wind AG

3 planned units · 20.4 MW · First observed 30 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Mar 2029

3 new planned wind units totalling 20.4 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
20.4 MW
Capacity per unit
6.8 MW each
First observed in MaStR snapshot
30 Sept 2026
Planned commissioning
31 Mar 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wp floß…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 30 Sept 2026
MaStR unit IDs: SEE902774397877, SEE952007185924, SEE935826246151
Commercial signals (3): cmuofbelc11dawtw0015cbe5e, cmuofbelc11czwtw01315hgpn, cmuofbeld11duwtw0e5uo50gs

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp floß…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
68Lead relevance · High

Why this ranks high. Mid-sized 20.4 MW signal, 3 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance68

  • Project scale (MW)15
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind development signal — 3 units / 20.4 MW

Königsbronn, Baden-Württemberg · Operator: Carl Zeiss Energie GmbH

3 planned units · 20.4 MW · First observed 30 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 28 Dec 2029

3 new planned wind units totalling 20.4 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
20.4 MW
Capacity per unit
6.8 MW each
First observed in MaStR snapshot
30 Sept 2026
Planned commissioning
28 Dec 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wp kahlenbühl wea…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 30 Sept 2026
MaStR unit IDs: SEE920496989439, SEE940592722983, SEE901472480614
Commercial signals (3): cmuofbeld11dlwtw0og8ah49b, cmuofbelb11cswtw0z3oypja4, cmuofbelc11d8wtw0r49p6s0i

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp kahlenbühl wea…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
62Lead relevance · High

Why this ranks high. Large 50.04 MW multi-unit signal, 9 registrations moving together and the registered operator is known. Short date shifts are common registry maintenance.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance62

  • Project scale (MW)20
  • Event type4
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence8
  • Size of change2

Signal materiality52

  • Event type16
  • Size of change7
  • MW affected15
  • Units affected14

Commissioning delayed by up to 27 days — 9 units / 50.04 MW

Sundern (Sauerland), Nordrhein-Westfalen · Operator: Trianel Windpark Sundern GmbH & Co. KG

9 units · 50.04 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 15 Sept 2026 → 12 Oct 2026 (+27 days)

9 wind units registered a later planned commissioning date (+27 days).

A short date shift is common and may be routine registry maintenance. Worth attention mainly if it is part of a wider pattern.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
9
Planned commissioning (same for every unit)
15 Sept 2026 → 12 Oct 2026 (+27 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“trianel windpark sundern…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 9 registered MaStR units
Snapshot transition: 29 Sept 2026 → 30 Sept 2026
MaStR unit IDs: SEE935467325901, SEE937358720741, SEE922361799297, SEE909559522608, SEE911161854077, SEE999312791471, SEE996159119062, SEE940584278870, SEE983517101128
Commercial signals (9): cmuofbeld11dtwtw0xl7iy5l9, cmuofbeld11dvwtw0g1ix10gv, cmuofbeld11dowtw0vo0qmmqg, cmuofbeld11dgwtw0hh7b9uc1, cmuofbeld11dhwtw0yxixs1q2, cmuofbelb11cfwtw0ezmv1ade, cmuofbelb11cgwtw0g5k4ak6a, cmuofbelb11crwtw0n8xtjg4l, cmuofbelb11cmwtw0jd26gyjl

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“trianel windpark sundern…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
60Lead relevance · High

Why this ranks high. Unusually large schedule shift (181 days) and the registered operator is known. Small combined capacity (11.56 MW); it may still reflect a registry correction rather than a new commercial need.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance60

  • Project scale (MW)12
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3
  • Size of change5

Signal materiality48

  • Event type16
  • Size of change18
  • MW affected9
  • Units affected5

Commissioning delayed by up to 181 days — 2 units / 11.56 MW

Dülmen, Nordrhein-Westfalen · Operator: Windenergiegemeinschaft Empte GmbH&Co. KG

2 units · 11.56 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Sept 2026 → Mar 2027 (+181 days)

2 wind units registered a later planned commissioning date (+181 days).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
2
Planned commissioning (same for every unit)
Sept 2026 → Mar 2027 (+181 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“e windenergiegemeinschaft…”); Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 29 Sept 2026 → 30 Sept 2026
MaStR unit IDs: SEE924200703199, SEE926063817945
Commercial signals (2): cmuofbeld11dpwtw0led55bqp, cmuofbeld11dqwtw0qgkrxyn0

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“e windenergiegemeinschaft…”); Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Capacity change
57Lead relevance · Moderate

Why this ranks here. The registered operator is known. It affects only one 6.8 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance57

  • Project scale (MW)9
  • Event type14
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change6

Signal materiality47

  • Event type18
  • Size of change22
  • MW affected7

Registered wind capacity increased (+3.35 MW) — 6.8 MW

Villmar, Hessen · Operator: UKA Umweltgerechte Kraftanlagen GmbH & Co. KG

1 unit · 6.8 MW

Wind · Wind turbine (horizontal-axis)

Registered capacity changed from 3.45 MW to 6.8 MW (+3.35 MW, +97%).

A larger registered capacity may indicate a changed project design, turbine or equipment choice, or grid-connection scope, and could affect engineering and equipment requirements.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Design / technologyGrid connectionEngineeringEquipment sizing
Design change?Permit & grid documentsDeveloper updates
Facts, hypotheses and how to verify
Registered capacity
3.45 MW → 6.8 MW (+3.35 MW / +97%)
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Check whether the change reflects a design or turbine-model change
  • Compare with permit and grid-connection documents
  • Look for recent developer announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 29 Sept 2026 → 30 Sept 2026
MaStR unit IDs: SEE967463780415
Commercial signals (1): cmuofbelc11d2wtw0fqiiza2o

Grouping basisSingle unit
A single MaStR registration.
Operator change
55Lead relevance · Moderate

Why this ranks here. Mid-sized 21.6 MW signal and 3 registrations moving together. Operator identity is unresolved, which reduces immediate actionability; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance55

  • Project scale (MW)15
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence5

Signal materiality33

  • Event type14
  • MW affected11
  • Units affected8

Registered operator changed on 3 wind units — 3 units / 21.6 MW

Bersenbrück, Niedersachsen · Operator: Registered operator name not resolved

3 units · 21.6 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 3 wind units.

A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligence
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Units with an operator change
3
Previous registered operator
Prowind GmbH
New registered operator
Operator ID ABR947575428009 (name not resolved)
  • Project development or development-management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“ankum menkenheide…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: 29 Sept 2026 → 30 Sept 2026
MaStR unit IDs: SEE974601256589, SEE943949761086, SEE985357464173
Commercial signals (3): cmuofbelc11d6wtw0t0hxzo7k, cmuofbelb11ctwtw0o5lzz1m7, cmuofbelb11ckwtw0gjpiexpd

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“ankum menkenheide…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

New developments (12)

New planned asset
62Lead relevance · High

Why this ranks high. Mid-sized 21 MW signal, 3 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance62

  • Project scale (MW)15
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence5

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind development signal — 3 units / 21 MW

Lexgaard, Schleswig-Holstein · Operator: Registered operator name not resolved

3 planned units · 21 MW · First observed 30 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Mar 2029

3 new planned wind units totalling 21 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
21 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
30 Sept 2026
Planned commissioning
31 Mar 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 30 Sept 2026
MaStR unit IDs: SEE982727501988, SEE972214953024, SEE902496690317
Commercial signals (3): cmuofbelb11cowtw0pe5bh1zg, cmuofbelc11d4wtw0cy9m6sfh, cmuofbelc11d9wtw0inrip5t6

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
60Lead relevance · High

Why this ranks high. Mid-sized 19.56 MW signal and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; the grouping evidence is limited.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance60

  • Project scale (MW)15
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence3

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind units — 3 units / 19.56 MW

Westre, Schleswig-Holstein · Operator: Registered operator name not resolved

3 planned units · 19.56 MW · First observed 30 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Mar 2029

3 new planned wind units totalling 19.56 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
19.56 MW
Capacity per unit
5.56–7 MW per unit
First observed in MaStR snapshot
30 Sept 2026
Planned commissioning
31 Mar 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Conservative group — Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 30 Sept 2026
MaStR unit IDs: SEE929091154877, SEE939489854739, SEE975440978861
Commercial signals (3): cmuofbeld11dswtw0m9ojkoqj, cmuofbeld11dwwtw0z1ylfsgm, cmuofbelb11cewtw0ml4qm2i7

Grouping basisConservative group
Supporting registry evidence: Same planned/commissioning date on every unit
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
58Lead relevance · Moderate

Why this ranks here. Mid-sized 14.4 MW signal and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance58

  • Project scale (MW)13
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence3

Signal materiality35

  • Event type20
  • MW affected10
  • Units affected5

New planned wind development signal — 2 units / 14.4 MW

Pattensen, Niedersachsen · Operator: Registered operator name not resolved

2 planned units · 14.4 MW · First observed 30 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Sept 2029

2 new planned wind units totalling 14.4 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
14.4 MW
Capacity per unit
7.2 MW each
First observed in MaStR snapshot
30 Sept 2026
Planned commissioning
01 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 30 Sept 2026
MaStR unit IDs: SEE904526985363, SEE962379759487
Commercial signals (2): cmuofbelc11dcwtw07rvtad0e, cmuofbelc11d1wtw01znw1k8e

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
58Lead relevance · Moderate

Why this ranks here. Mid-sized 14 MW signal and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance58

  • Project scale (MW)13
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence3

Signal materiality34

  • Event type20
  • MW affected9
  • Units affected5

New planned wind development signal — 2 units / 14 MW

Taufkirchen, Bayern · Operator: Registered operator name not resolved

2 planned units · 14 MW · First observed 30 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Dec 2028

2 new planned wind units totalling 14 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
14 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
30 Sept 2026
Planned commissioning
31 Dec 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 30 Sept 2026
MaStR unit IDs: SEE944683134082, SEE939640718092
Commercial signals (2): cmuofbelc11cuwtw085kkjtk3, cmuofbeld11dxwtw0c5s3bb3y

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
57Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset and the registered operator is known. It affects only one 6.8 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance57

  • Project scale (MW)9
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality27

  • Event type20
  • MW affected7

New planned wind unit — 6.8 MW

Ketzin/Havel, Brandenburg · Operator: e.disnatur Erneuerbare Energien GmbH

1 planned unit · 6.8 MW · First observed 30 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 04 Oct 2028

A new planned wind unit of 6.8 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
6.8 MW
First observed in MaStR snapshot
30 Sept 2026
Planned commissioning
04 Oct 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 30 Sept 2026
MaStR unit IDs: SEE994604985699
Commercial signals (1): cmuofbelb11chwtw0z8479i04

Grouping basisSingle unit
A single MaStR registration.
New planned asset
57Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset and the registered operator is known. It affects only one 6.8 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance57

  • Project scale (MW)9
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality27

  • Event type20
  • MW affected7

New planned wind unit — 6.8 MW

Oberkochen, Baden-Württemberg · Operator: Carl Zeiss Energie GmbH

1 planned unit · 6.8 MW · First observed 30 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 28 Dec 2029

A new planned wind unit of 6.8 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
6.8 MW
First observed in MaStR snapshot
30 Sept 2026
Planned commissioning
28 Dec 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 30 Sept 2026
MaStR unit IDs: SEE926889372727
Commercial signals (1): cmuofbeld11drwtw0wj27a7u6

Grouping basisSingle unit
A single MaStR registration.
New planned asset
56Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset and the registered operator is known. It affects only one 6 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance56

  • Project scale (MW)8
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality27

  • Event type20
  • MW affected7

New planned wind unit — 6 MW

Meckel, Rheinland-Pfalz · Operator: Windpark Lambacher Höh GmbH

1 planned unit · 6 MW · First observed 30 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Dec 2029

A new planned wind unit of 6 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
6 MW
First observed in MaStR snapshot
30 Sept 2026
Planned commissioning
31 Dec 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 30 Sept 2026
MaStR unit IDs: SEE949776443713
Commercial signals (1): cmuofbelc11cxwtw0qmum48wo

Grouping basisSingle unit
A single MaStR registration.
New planned asset
56Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset and the registered operator is known. It affects only one 6 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance56

  • Project scale (MW)8
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality27

  • Event type20
  • MW affected7

New planned wind unit — 6 MW

Wolsfeld, Rheinland-Pfalz · Operator: Windpark Lambacher Höh GmbH

1 planned unit · 6 MW · First observed 30 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Dec 2029

A new planned wind unit of 6 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
6 MW
First observed in MaStR snapshot
30 Sept 2026
Planned commissioning
31 Dec 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 30 Sept 2026
MaStR unit IDs: SEE903644885906
Commercial signals (1): cmuofbelc11dbwtw0k8gi2ht2

Grouping basisSingle unit
A single MaStR registration.
New planned asset
56Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset and the registered operator is known. It affects only one 5.7 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance56

  • Project scale (MW)8
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality27

  • Event type20
  • MW affected7

New planned wind unit — 5.7 MW

Wustermark, Brandenburg · Operator: e.disnatur Erneuerbare Energien GmbH

1 planned unit · 5.7 MW · First observed 30 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 04 Oct 2028

A new planned wind unit of 5.7 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
5.7 MW
First observed in MaStR snapshot
30 Sept 2026
Planned commissioning
04 Oct 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 30 Sept 2026
MaStR unit IDs: SEE949636306134
Commercial signals (1): cmuofbelc11cwwtw0x5p6f9fr

Grouping basisSingle unit
A single MaStR registration.
New planned asset
51Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; it affects only one 7.2 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance51

  • Project scale (MW)9
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4

Signal materiality27

  • Event type20
  • MW affected7

New planned wind unit — 7.2 MW

Brüssow, Brandenburg · Operator: Registered operator name not resolved

1 planned unit · 7.2 MW · First observed 30 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Nov 2028

A new planned wind unit of 7.2 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
7.2 MW
First observed in MaStR snapshot
30 Sept 2026
Planned commissioning
30 Nov 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 30 Sept 2026
MaStR unit IDs: SEE946715758075
Commercial signals (1): cmuofbelc11cvwtw0brhdywuk

Grouping basisSingle unit
A single MaStR registration.
New planned asset
51Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; it affects only one 7 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance51

  • Project scale (MW)9
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4

Signal materiality27

  • Event type20
  • MW affected7

New planned wind unit — 7 MW

Karlum, Schleswig-Holstein · Operator: Registered operator name not resolved

1 planned unit · 7 MW · First observed 30 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Mar 2029

A new planned wind unit of 7 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
7 MW
First observed in MaStR snapshot
30 Sept 2026
Planned commissioning
31 Mar 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 30 Sept 2026
MaStR unit IDs: SEE918220554022
Commercial signals (1): cmuofbeld11djwtw0p0b6e73m

Grouping basisSingle unit
A single MaStR registration.
New planned asset
51Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; it affects only one 7 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance51

  • Project scale (MW)9
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4

Signal materiality27

  • Event type20
  • MW affected7

New planned wind unit — 7 MW

Marsberg, Nordrhein-Westfalen · Operator: Registered operator name not resolved

1 planned unit · 7 MW · First observed 30 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Dec 2027

A new planned wind unit of 7 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
7 MW
First observed in MaStR snapshot
30 Sept 2026
Planned commissioning
31 Dec 2027
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 30 Sept 2026
MaStR unit IDs: SEE984090407379
Commercial signals (1): cmuofbelb11clwtw05y59ode5

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Major schedule changes (5)

Schedule change
60Lead relevance · High

Why this ranks high. The registered operator is known. Small combined capacity (11.12 MW).

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance60

  • Project scale (MW)12
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3
  • Size of change5

Signal materiality47

  • Event type16
  • Size of change18
  • MW affected8
  • Units affected5

Commissioning delayed by up to 167 days — 2 units / 11.12 MW

Dockendorf, Rheinland-Pfalz · Operator: Windenergie Bitburg-Land Planungsgesellschaft mbH

2 units · 11.12 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Sept 2026 → Mar 2027 (+167 days)

2 wind units registered a later planned commissioning date (+167 days).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
2
Planned commissioning (same for every unit)
Sept 2026 → Mar 2027 (+167 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 29 Sept 2026 → 30 Sept 2026
MaStR unit IDs: SEE972732123435, SEE920275182112
Commercial signals (2): cmuofbelc11d5wtw0g614ve2y, cmuofbeld11dkwtw06i31n8ch

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
54Lead relevance · Moderate

Why this ranks here. Unusually large schedule shift (259 days) and the registered operator is known. It affects only one 7.2 MW unit; it may still reflect a registry correction rather than a new commercial need; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance54

  • Project scale (MW)9
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change5

Signal materiality43

  • Event type16
  • Size of change20
  • MW affected7

Commissioning delayed by 259 days — 7.2 MW — MaStR SEE974744025424

Bad Wünnenberg, Nordrhein-Westfalen · Operator: WBG Energie 5 GmbH & Co. KG

1 unit · 7.2 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Sept 2026 → Jun 2027 (+259 days)

The registered planned commissioning date moved by +259 days (Sept 2026 → Jun 2027).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Planned commissioning
Sept 2026 → Jun 2027 (+259 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 29 Sept 2026 → 30 Sept 2026
MaStR unit IDs: SEE974744025424
Commercial signals (1): cmuofbelc11d7wtw0hozkd4o7

Grouping basisSingle unit
A single MaStR registration.
Schedule change
54Lead relevance · Moderate

Why this ranks here. Unusually large schedule shift (259 days) and the registered operator is known. It affects only one 7.2 MW unit; it may still reflect a registry correction rather than a new commercial need; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance54

  • Project scale (MW)9
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change5

Signal materiality43

  • Event type16
  • Size of change20
  • MW affected7

Commissioning delayed by 259 days — 7.2 MW — MaStR SEE906158498693

Bad Wünnenberg, Nordrhein-Westfalen · Operator: EFG-Energie GmbH & Co. KG

1 unit · 7.2 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Sept 2026 → Jun 2027 (+259 days)

The registered planned commissioning date moved by +259 days (Sept 2026 → Jun 2027).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Planned commissioning
Sept 2026 → Jun 2027 (+259 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 29 Sept 2026 → 30 Sept 2026
MaStR unit IDs: SEE906158498693
Commercial signals (1): cmuofbeld11dewtw0z1pgrdr7

Grouping basisSingle unit
A single MaStR registration.
Schedule change
53Lead relevance · Moderate

Why this ranks here. The registered operator is known. It affects only one 5.56 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance53

  • Project scale (MW)8
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change5

Signal materiality40

  • Event type16
  • Size of change18
  • MW affected6

Commissioning delayed by 167 days — 5.56 MW

Ingendorf, Rheinland-Pfalz · Operator: Windenergie Bitburg-Land Planungsgesellschaft mbH

1 unit · 5.56 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Sept 2026 → Mar 2027 (+167 days)

The registered planned commissioning date moved by +167 days (Sept 2026 → Mar 2027).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Planned commissioning
Sept 2026 → Mar 2027 (+167 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 29 Sept 2026 → 30 Sept 2026
MaStR unit IDs: SEE922169236970
Commercial signals (1): cmuofbeld11dnwtw08lbpa7va

Grouping basisSingle unit
A single MaStR registration.
Schedule change
53Lead relevance · Moderate

Why this ranks here. The registered operator is known. It affects only one 5.56 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance53

  • Project scale (MW)8
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change5

Signal materiality40

  • Event type16
  • Size of change18
  • MW affected6

Commissioning delayed by 167 days — 5.56 MW

Wettlingen, Rheinland-Pfalz · Operator: Windenergie Bitburg-Land Planungsgesellschaft mbH

1 unit · 5.56 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Sept 2026 → Mar 2027 (+167 days)

The registered planned commissioning date moved by +167 days (Sept 2026 → Mar 2027).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Planned commissioning
Sept 2026 → Mar 2027 (+167 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 29 Sept 2026 → 30 Sept 2026
MaStR unit IDs: SEE906044624397
Commercial signals (1): cmuofbelc11ddwtw039ip0hmv

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Recently commissioned assets (1)

Commissioned asset
30Lead relevance · Low

Why this ranks here. The registered operator is known. It affects only one 1.2 MW unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance30

  • Project scale (MW)3
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality15

  • Event type12
  • MW affected3

Gas-generation unit commissioned — 1.2 MW

Delmenhorst, Niedersachsen · Operator: Stadtwerke Delmenhorst GmbH

1 unit · 1.2 MW

Gas generation · Verbrennungsmotor

1 gas-generation unit (1.2 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 29 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
1.2 MW
Commissioning date
29 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 29 Sept 2026 → 30 Sept 2026
MaStR unit IDs: SEE909264325594
Commercial signals (1): cmuofbeld11dfwtw0xyhfs6ob

Grouping basisSingle unit
Stable MaStR location ID: SEL994069343805
A single MaStR registration.
↑ Back to top

Other registry changes (1)

Smaller registry changes, listed for completeness.

Schedule change
53Lead relevance · Moderate

Why this ranks here. Mid-sized 16.68 MW signal, 3 registrations moving together and the registered operator is known. Short date shifts are common registry maintenance; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance53

  • Project scale (MW)14
  • Event type4
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5
  • Size of change2

Signal materiality41

  • Event type16
  • Size of change7
  • MW affected10
  • Units affected8

Commissioning delayed by up to 27 days — 3 units / 16.68 MW

Sundern (Sauerland), Nordrhein-Westfalen · Operator: Sundern ENERGIE Windpark I GmbH & Co. KG

3 units · 16.68 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 15 Sept 2026 → 12 Oct 2026 (+27 days)

3 wind units registered a later planned commissioning date (+27 days).

A short date shift is common and may be routine registry maintenance. Worth attention mainly if it is part of a wider pattern.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
3
Planned commissioning (same for every unit)
15 Sept 2026 → 12 Oct 2026 (+27 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“trianel windpark sundern…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: 29 Sept 2026 → 30 Sept 2026
MaStR unit IDs: SEE969148410532, SEE922118506475, SEE981362165548
Commercial signals (3): cmuofbelc11d3wtw02o1d6gr3, cmuofbeld11dmwtw0g664eaq6, cmuofbelb11cpwtw0hku4qva9

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“trianel windpark sundern…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.