Commissioned asset40Lead relevance · Low
Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance40
- Project scale (MW)13
- Event type6
- Lifecycle stage3
- Recency8
- Operator identified10
Signal materiality22
- Event type12
- MW affected10
Wind unit commissioned — 15 MW — MaStR SEE946177776556
Ausschließliche Wirtschaftszone · Operator: Windanker GmbH
1 unit · 15 MW
Wind · Wind turbine (horizontal-axis)
What changed
1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 24 Aug 2026.
Why it may matter
Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Verify next
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
- Registered capacity
- 15 MW
- Commissioning date
- 24 Aug 2026
- Lifecycle change
- Planned → commissioned
- Operations, maintenance and technical management services
- Asset or company transaction advisory and technical due diligence
How to verify
- Confirm operating status and commissioning date in the official MaStR record
- Identify the operating company and public information on service arrangements
- Check for commissioning announcements
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 21 Sept 2026 → 22 Sept 2026
MaStR unit IDs: SEE946177776556
Commercial signals (1): cmuc5d7zw1blswt3o95dra1mn
Grouping basisSingle unit
Stable MaStR location ID: SEL902725026696
A single MaStR registration.
Underlying registrations (1)
Commissioned asset40Lead relevance · Low
Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance40
- Project scale (MW)13
- Event type6
- Lifecycle stage3
- Recency8
- Operator identified10
Signal materiality22
- Event type12
- MW affected10
Wind unit commissioned — 15 MW — MaStR SEE978918526878
Ausschließliche Wirtschaftszone · Operator: Windanker GmbH
1 unit · 15 MW
Wind · Wind turbine (horizontal-axis)
What changed
1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 22 Aug 2026.
Why it may matter
Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Verify next
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
- Registered capacity
- 15 MW
- Commissioning date
- 22 Aug 2026
- Lifecycle change
- Planned → commissioned
- Operations, maintenance and technical management services
- Asset or company transaction advisory and technical due diligence
How to verify
- Confirm operating status and commissioning date in the official MaStR record
- Identify the operating company and public information on service arrangements
- Check for commissioning announcements
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 21 Sept 2026 → 22 Sept 2026
MaStR unit IDs: SEE978918526878
Commercial signals (1): cmuc5d7zw1blgwt3oczxfuzdt
Grouping basisSingle unit
Stable MaStR location ID: SEL924469090856
A single MaStR registration.
Underlying registrations (1)
Commissioned asset40Lead relevance · Low
Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance40
- Project scale (MW)13
- Event type6
- Lifecycle stage3
- Recency8
- Operator identified10
Signal materiality22
- Event type12
- MW affected10
Wind unit commissioned — 15 MW — MaStR SEE907394220611
Ausschließliche Wirtschaftszone · Operator: Windanker GmbH
1 unit · 15 MW
Wind · Wind turbine (horizontal-axis)
What changed
1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 24 Aug 2026.
Why it may matter
Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Verify next
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
- Registered capacity
- 15 MW
- Commissioning date
- 24 Aug 2026
- Lifecycle change
- Planned → commissioned
- Operations, maintenance and technical management services
- Asset or company transaction advisory and technical due diligence
How to verify
- Confirm operating status and commissioning date in the official MaStR record
- Identify the operating company and public information on service arrangements
- Check for commissioning announcements
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 21 Sept 2026 → 22 Sept 2026
MaStR unit IDs: SEE907394220611
Commercial signals (1): cmuc5d7zv1bl7wt3o921f0eeh
Grouping basisSingle unit
Stable MaStR location ID: SEL933436340191
A single MaStR registration.
Underlying registrations (1)
Commissioned asset40Lead relevance · Low
Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance40
- Project scale (MW)13
- Event type6
- Lifecycle stage3
- Recency8
- Operator identified10
Signal materiality22
- Event type12
- MW affected10
Wind unit commissioned — 15 MW — MaStR SEE958156335036
Ausschließliche Wirtschaftszone · Operator: Windanker GmbH
1 unit · 15 MW
Wind · Wind turbine (horizontal-axis)
What changed
1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 24 Aug 2026.
Why it may matter
Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Verify next
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
- Registered capacity
- 15 MW
- Commissioning date
- 24 Aug 2026
- Lifecycle change
- Planned → commissioned
- Operations, maintenance and technical management services
- Asset or company transaction advisory and technical due diligence
How to verify
- Confirm operating status and commissioning date in the official MaStR record
- Identify the operating company and public information on service arrangements
- Check for commissioning announcements
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 21 Sept 2026 → 22 Sept 2026
MaStR unit IDs: SEE958156335036
Commercial signals (1): cmuc5d7zv1bl6wt3otxwj29ea
Grouping basisSingle unit
Stable MaStR location ID: SEL933466274060
A single MaStR registration.
Underlying registrations (1)
Commissioned asset40Lead relevance · Low
Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance40
- Project scale (MW)13
- Event type6
- Lifecycle stage3
- Recency8
- Operator identified10
Signal materiality22
- Event type12
- MW affected10
Wind unit commissioned — 15 MW — MaStR SEE953495185281
Ausschließliche Wirtschaftszone · Operator: Windanker GmbH
1 unit · 15 MW
Wind · Wind turbine (horizontal-axis)
What changed
1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 22 Aug 2026.
Why it may matter
Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Verify next
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
- Registered capacity
- 15 MW
- Commissioning date
- 22 Aug 2026
- Lifecycle change
- Planned → commissioned
- Operations, maintenance and technical management services
- Asset or company transaction advisory and technical due diligence
How to verify
- Confirm operating status and commissioning date in the official MaStR record
- Identify the operating company and public information on service arrangements
- Check for commissioning announcements
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 21 Sept 2026 → 22 Sept 2026
MaStR unit IDs: SEE953495185281
Commercial signals (1): cmuc5d7zw1blfwt3ony04ph89
Grouping basisSingle unit
Stable MaStR location ID: SEL935364291125
A single MaStR registration.
Underlying registrations (1)
Commissioned asset40Lead relevance · Low
Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance40
- Project scale (MW)13
- Event type6
- Lifecycle stage3
- Recency8
- Operator identified10
Signal materiality22
- Event type12
- MW affected10
Wind unit commissioned — 15 MW — MaStR SEE938766370603
Ausschließliche Wirtschaftszone · Operator: Windanker GmbH
1 unit · 15 MW
Wind · Wind turbine (horizontal-axis)
What changed
1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 22 Aug 2026.
Why it may matter
Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Verify next
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
- Registered capacity
- 15 MW
- Commissioning date
- 22 Aug 2026
- Lifecycle change
- Planned → commissioned
- Operations, maintenance and technical management services
- Asset or company transaction advisory and technical due diligence
How to verify
- Confirm operating status and commissioning date in the official MaStR record
- Identify the operating company and public information on service arrangements
- Check for commissioning announcements
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 21 Sept 2026 → 22 Sept 2026
MaStR unit IDs: SEE938766370603
Commercial signals (1): cmuc5d7zx1bmawt3oa3rrujs3
Grouping basisSingle unit
Stable MaStR location ID: SEL936225797411
A single MaStR registration.
Underlying registrations (1)
Commissioned asset40Lead relevance · Low
Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance40
- Project scale (MW)13
- Event type6
- Lifecycle stage3
- Recency8
- Operator identified10
Signal materiality22
- Event type12
- MW affected10
Wind unit commissioned — 15 MW — MaStR SEE996842234270
Ausschließliche Wirtschaftszone · Operator: Windanker GmbH
1 unit · 15 MW
Wind · Wind turbine (horizontal-axis)
What changed
1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 25 Aug 2026.
Why it may matter
Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Verify next
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
- Registered capacity
- 15 MW
- Commissioning date
- 25 Aug 2026
- Lifecycle change
- Planned → commissioned
- Operations, maintenance and technical management services
- Asset or company transaction advisory and technical due diligence
How to verify
- Confirm operating status and commissioning date in the official MaStR record
- Identify the operating company and public information on service arrangements
- Check for commissioning announcements
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 21 Sept 2026 → 22 Sept 2026
MaStR unit IDs: SEE996842234270
Commercial signals (1): cmuc5d7zv1bldwt3o8yf3wu1x
Grouping basisSingle unit
Stable MaStR location ID: SEL956695649744
A single MaStR registration.
Underlying registrations (1)
Commissioned asset40Lead relevance · Low
Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance40
- Project scale (MW)13
- Event type6
- Lifecycle stage3
- Recency8
- Operator identified10
Signal materiality22
- Event type12
- MW affected10
Wind unit commissioned — 15 MW — MaStR SEE994857621290
Ausschließliche Wirtschaftszone · Operator: Windanker GmbH
1 unit · 15 MW
Wind · Wind turbine (horizontal-axis)
What changed
1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 22 Aug 2026.
Why it may matter
Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Verify next
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
- Registered capacity
- 15 MW
- Commissioning date
- 22 Aug 2026
- Lifecycle change
- Planned → commissioned
- Operations, maintenance and technical management services
- Asset or company transaction advisory and technical due diligence
How to verify
- Confirm operating status and commissioning date in the official MaStR record
- Identify the operating company and public information on service arrangements
- Check for commissioning announcements
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 21 Sept 2026 → 22 Sept 2026
MaStR unit IDs: SEE994857621290
Commercial signals (1): cmuc5d7zv1blewt3oku5i8sko
Grouping basisSingle unit
Stable MaStR location ID: SEL957546874575
A single MaStR registration.
Underlying registrations (1)
Commissioned asset40Lead relevance · Low
Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance40
- Project scale (MW)13
- Event type6
- Lifecycle stage3
- Recency8
- Operator identified10
Signal materiality22
- Event type12
- MW affected10
Wind unit commissioned — 15 MW — MaStR SEE940177894593
Ausschließliche Wirtschaftszone · Operator: Windanker GmbH
1 unit · 15 MW
Wind · Wind turbine (horizontal-axis)
What changed
1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 22 Aug 2026.
Why it may matter
Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Verify next
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
- Registered capacity
- 15 MW
- Commissioning date
- 22 Aug 2026
- Lifecycle change
- Planned → commissioned
- Operations, maintenance and technical management services
- Asset or company transaction advisory and technical due diligence
How to verify
- Confirm operating status and commissioning date in the official MaStR record
- Identify the operating company and public information on service arrangements
- Check for commissioning announcements
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 21 Sept 2026 → 22 Sept 2026
MaStR unit IDs: SEE940177894593
Commercial signals (1): cmuc5d7zv1bl9wt3ocrrcopvy
Grouping basisSingle unit
Stable MaStR location ID: SEL964145525128
A single MaStR registration.
Underlying registrations (1)
Commissioned asset40Lead relevance · Low
Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance40
- Project scale (MW)13
- Event type6
- Lifecycle stage3
- Recency8
- Operator identified10
Signal materiality22
- Event type12
- MW affected10
Wind unit commissioned — 15 MW — MaStR SEE911017931655
Ausschließliche Wirtschaftszone · Operator: Windanker GmbH
1 unit · 15 MW
Wind · Wind turbine (horizontal-axis)
What changed
1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 22 Aug 2026.
Why it may matter
Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Verify next
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
- Registered capacity
- 15 MW
- Commissioning date
- 22 Aug 2026
- Lifecycle change
- Planned → commissioned
- Operations, maintenance and technical management services
- Asset or company transaction advisory and technical due diligence
How to verify
- Confirm operating status and commissioning date in the official MaStR record
- Identify the operating company and public information on service arrangements
- Check for commissioning announcements
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 21 Sept 2026 → 22 Sept 2026
MaStR unit IDs: SEE911017931655
Commercial signals (1): cmuc5d7zv1blbwt3o024hj06g
Grouping basisSingle unit
Stable MaStR location ID: SEL966415458648
A single MaStR registration.
Underlying registrations (1)
Commissioned asset40Lead relevance · Low
Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance40
- Project scale (MW)13
- Event type6
- Lifecycle stage3
- Recency8
- Operator identified10
Signal materiality22
- Event type12
- MW affected10
Wind unit commissioned — 15 MW — MaStR SEE956688133816
Ausschließliche Wirtschaftszone · Operator: Windanker GmbH
1 unit · 15 MW
Wind · Wind turbine (horizontal-axis)
What changed
1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 24 Aug 2026.
Why it may matter
Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Verify next
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
- Registered capacity
- 15 MW
- Commissioning date
- 24 Aug 2026
- Lifecycle change
- Planned → commissioned
- Operations, maintenance and technical management services
- Asset or company transaction advisory and technical due diligence
How to verify
- Confirm operating status and commissioning date in the official MaStR record
- Identify the operating company and public information on service arrangements
- Check for commissioning announcements
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 21 Sept 2026 → 22 Sept 2026
MaStR unit IDs: SEE956688133816
Commercial signals (1): cmuc5d7zv1bl8wt3os01ykebj
Grouping basisSingle unit
Stable MaStR location ID: SEL969719593633
A single MaStR registration.
Underlying registrations (1)
Commissioned asset40Lead relevance · Low
Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance40
- Project scale (MW)13
- Event type6
- Lifecycle stage3
- Recency8
- Operator identified10
Signal materiality22
- Event type12
- MW affected10
Wind unit commissioned — 15 MW — MaStR SEE956837862925
Ausschließliche Wirtschaftszone · Operator: Windanker GmbH
1 unit · 15 MW
Wind · Wind turbine (horizontal-axis)
What changed
1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 22 Aug 2026.
Why it may matter
Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Verify next
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
- Registered capacity
- 15 MW
- Commissioning date
- 22 Aug 2026
- Lifecycle change
- Planned → commissioned
- Operations, maintenance and technical management services
- Asset or company transaction advisory and technical due diligence
How to verify
- Confirm operating status and commissioning date in the official MaStR record
- Identify the operating company and public information on service arrangements
- Check for commissioning announcements
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 21 Sept 2026 → 22 Sept 2026
MaStR unit IDs: SEE956837862925
Commercial signals (1): cmuc5d7zv1blawt3o86byhhsk
Grouping basisSingle unit
Stable MaStR location ID: SEL978590216524
A single MaStR registration.
Underlying registrations (1)