Intelligence brief

German Energy Asset Change Intelligence — 2026-10-01

A curated, source-traceable view of registered MaStR asset updates.

Coverage: 30 Sept → 01 Oct 2026Latest MaStR snapshot: 1 Oct 2026Snapshots compared: 2

Covers one snapshot-to-snapshot transition. Do not compare its counts with weekly or multi-day reports.

Source coverageLatest MaStR snapshot: 1 Oct 2026Brief generated: 1 Oct 2026
8Top opportunities shown
The diversified selection shown in the Top section. 41 grouped events score above the investigation threshold in total. A registry signal only: it does not establish procurement activity or buyer intent.
32New development signals
7Major schedule shifts
3Operator changes
2Commissioning events
511.34 MWNewly planned capacity

43 grouped events (units merged into likely site groups; not confirmed projects). Unit-level records: 117 registry changes across 113 registrations, 731.78 MW registered capacity.

Start here

  1. 74New planned wind development signal — 6 units / 42 MW · Vechta, Niedersachsen
  2. 72Commissioning rescheduled — 10 units / 58.24 MW · Nieheim, Nordrhein-Westfalen
  3. 71New planned wind development signal — 4 units / 28 MW · Bollingstedt, Schleswig-Holstein
  4. 70Commissioning delayed by up to 405 days — 8 units / 55.4 MW · Rhede, Nordrhein-Westfalen
  5. 69New planned wind development signal — 8 units / 56 MW · Itterbeck, Niedersachsen

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

Top opportunities to investigate (8)

Selected from the highest-scoring investigation signals, with category diversification to avoid repetitive results. Cards are ordered by opportunity score; a higher-scoring signal of an already well-represented type may appear in a section below. Scores are deterministic and are not probabilities. Everything here is a starting point for verification, not evidence of demand.

New planned asset
74Lead relevance · High

Why this ranks high. Mid-sized 42 MW signal, 6 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance74

  • Project scale (MW)19
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence7

Signal materiality46

  • Event type20
  • MW affected14
  • Units affected12

New planned wind development signal — 6 units / 42 MW

Vechta, Niedersachsen · Operator: RWE Wind Onshore & PV Deutschland GmbH

6 planned units · 42 MW · First observed 01 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 07 Dec 2028

6 new planned wind units totalling 42 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
6
Total registered capacity
42 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
01 Oct 2026
Planned commissioning
07 Dec 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“vechta telbrake…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 6 registered MaStR units
Snapshot transition: First tracked snapshot → 1 Oct 2026
MaStR unit IDs: SEE919810005566, SEE933103025291, SEE985834931297, SEE915061860091, SEE952958055598, SEE952663354078
Commercial signals (6): cmuq3co530xcawtj4ytlq9b01, cmuq3co530xccwtj42t4040am, cmuq3co530xcdwtj4082hww5i, cmuq3co530xcgwtj41z9osbda, cmuq3co530xciwtj4g4lbpwpq, cmuq3co540xclwtj4rgbcaoq7

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“vechta telbrake…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
72Lead relevance · High

Why this ranks high. Large 58.24 MW multi-unit signal, 10 registrations moving together, unusually large schedule shift (683 days) and the registered operator is known. The grouping evidence is limited; it may still reflect a registry correction rather than a new commercial need.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance72

  • Project scale (MW)21
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5
  • Size of change6

Signal materiality71

  • Event type16
  • Size of change25
  • MW affected16
  • Units affected14

Commissioning rescheduled — 10 units / 58.24 MW

Nieheim, Nordrhein-Westfalen · Operator: Bürgerwind Nieheim-Oeynhausen GmbH & Co. KG

10 units · 58.24 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Oct 2026 – 09 Mar 2028

10 wind units registered a changed planned commissioning date (-370 days to +683 days).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
10
Planned commissioning before
01 Oct 2026 – 09 Mar 2028
Planned commissioning now
06 Nov 2026 – 14 Aug 2028
Shift per unit
-370 to +683 days
Direction
9 later, 1 earlier
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Conservative group
Presentation group: 10 registered MaStR units
Snapshot transition: 30 Sept 2026 → 1 Oct 2026
MaStR unit IDs: SEE961223623905, SEE972724705250, SEE900532400548, SEE943080855163, SEE988723851584, SEE939364498027, SEE919803817831, SEE980813108295, SEE922261183820, SEE951576216565
Commercial signals (10): cmuq3co520xbrwtj4flmguihe, cmuq3co520xbqwtj4i4gdvlq6, cmuq3co520xbdwtj40638vxl2, cmuq3co510xauwtj4qi647rfv, cmuq3co520xbcwtj4pm6mwttk, cmuq3co510xatwtj4ypwt6s2u, cmuq3co510xarwtj4glg6t1cz, cmuq3co510xaswtj49yof1va8, cmuq3co520xb7wtj4z0kwh92i, cmuq3co510xb6wtj4ycagttem

Grouping basisConservative group
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
71Lead relevance · High

Why this ranks high. Mid-sized 28 MW signal, 4 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance71

  • Project scale (MW)17
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality42

  • Event type20
  • MW affected12
  • Units affected10

New planned wind development signal — 4 units / 28 MW

Bollingstedt, Schleswig-Holstein · Operator: Nord-Ostsee Energiepark GmbH & Co. KG

4 planned units · 28 MW · First observed 01 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Nov 2028

4 new planned wind units totalling 28 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
4
Total registered capacity
28 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
01 Oct 2026
Planned commissioning
30 Nov 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“nord ostsee energiepark c…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 4 registered MaStR units
Snapshot transition: First tracked snapshot → 1 Oct 2026
MaStR unit IDs: SEE967022408019, SEE983589888095, SEE911909022461, SEE923714793603
Commercial signals (4): cmuq3co540xczwtj47bxi68m6, cmuq3co540xd4wtj4awn5fptn, cmuq3co540xd7wtj4vfqmnulm, cmuq3co540xd8wtj4kvz8cs8p

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“nord ostsee energiepark c…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
70Lead relevance · High

Why this ranks high. Large 55.4 MW multi-unit signal, unusually large schedule shift (405 days) and the registered operator is known. The grouping evidence is limited; it may still reflect a registry correction rather than a new commercial need.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance70

  • Project scale (MW)20
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence4
  • Size of change6

Signal materiality66

  • Event type16
  • Size of change22
  • MW affected15
  • Units affected13

Commissioning delayed by up to 405 days — 8 units / 55.4 MW

Rhede, Nordrhein-Westfalen · Operator: Bürgerwind Büngern GmbH & Co. KG

8 units · 55.4 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 10 Jun 2027

8 wind units registered a later planned commissioning date (+265 days to +405 days).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
8
Planned commissioning before
10 Jun 2027
Planned commissioning now
01 Mar – 19 Jul 2028
Shift per unit
+265 to +405 days
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Conservative group
Presentation group: 8 registered MaStR units
Snapshot transition: 30 Sept 2026 → 1 Oct 2026
MaStR unit IDs: SEE911621800767, SEE961003370296, SEE929624718620, SEE920222964044, SEE981498630545, SEE926783904161, SEE931121944709, SEE956441616488
Commercial signals (8): cmuq3co520xbiwtj43cpofpab, cmuq3co520xbpwtj4shg7e07i, cmuq3co520xbjwtj4pv4r2dgi, cmuq3co520xbowtj45bx30x4v, cmuq3co520xbnwtj4g89ldv4u, cmuq3co520xbmwtj45pkqphie, cmuq3co520xblwtj4ogtmmd3b, cmuq3co520xbkwtj4usbbw3s9

Grouping basisConservative group
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
69Lead relevance · High

Why this ranks high. Large 56 MW multi-unit signal, 8 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance69

  • Project scale (MW)20
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence7

Signal materiality48

  • Event type20
  • MW affected15
  • Units affected13

New planned wind development signal — 8 units / 56 MW

Itterbeck, Niedersachsen · Operator: Registered operator name not resolved

8 planned units · 56 MW · First observed 01 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Mar 2028

8 new planned wind units totalling 56 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
8
Total registered capacity
56 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
01 Oct 2026
Planned commissioning
31 Mar 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“itterbeck…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 8 registered MaStR units
Snapshot transition: First tracked snapshot → 1 Oct 2026
MaStR unit IDs: SEE913517529707, SEE972513712537, SEE932920651607, SEE986546914219, SEE975591121062, SEE931326398888, SEE967814726093, SEE923034378429
Commercial signals (8): cmuq3co530xcewtj41y5vp3x4, cmuq3co530xchwtj40onbhg2o, cmuq3co540xcjwtj4okzrp8nx, cmuq3co540xcmwtj4n7lxuzh4, cmuq3co540xcnwtj4qm74jr53, cmuq3co540xcowtj4xwudwz1g, cmuq3co540xcqwtj4wmqcawq9, cmuq3co540xcswtj47ygt8hmd

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“itterbeck…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
68Lead relevance · High

Why this ranks high. Mid-sized 42 MW signal, 6 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance68

  • Project scale (MW)19
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence7

Signal materiality46

  • Event type20
  • MW affected14
  • Units affected12

New planned wind development signal — 6 units / 42 MW

Braderup, Schleswig-Holstein · Operator: Registered operator name not resolved

6 planned units · 42 MW · First observed 01 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Mar 2029

6 new planned wind units totalling 42 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
6
Total registered capacity
42 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
01 Oct 2026
Planned commissioning
31 Mar 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“bralab…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 6 registered MaStR units
Snapshot transition: First tracked snapshot → 1 Oct 2026
MaStR unit IDs: SEE937581001433, SEE976280198976, SEE962309470864, SEE951575464394, SEE925784312395, SEE977562698061
Commercial signals (6): cmuq3co530xbuwtj4af6ag22d, cmuq3co530xbvwtj4i7pnr7kk, cmuq3co530xbwwtj47vqyxwcc, cmuq3co530xbywtj4dc3r2zpf, cmuq3co530xbzwtj4ft016fmn, cmuq3co530xc0wtj487h35k57

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“bralab…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Operator change
50Lead relevance · Moderate

Why this ranks here. The registered operator is known. Small combined capacity (11.12 MW); no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance50

  • Project scale (MW)12
  • Event type13
  • Lifecycle stage4
  • Recency8
  • Operator identified10
  • Multi-unit evidence3

Signal materiality27

  • Event type14
  • MW affected8
  • Units affected5

Registered operator changed on 2 wind units — 2 units / 11.12 MW

Lügde, Nordrhein-Westfalen · Operator: Windwärts Schliekum GmbH & Co. Zweite Betreiber KG

2 units · 11.12 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 2 wind units.

A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligenceO&M
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Units with an operator change
2
Previous registered operator
Westwind Projektierungs GmbH & Co. KG
New registered operator
Windwärts Schliekum GmbH & Co. Zweite Betreiber KG
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Site-level (shared MaStR location ID) — Shared stable MaStR location ID
Presentation group: 2 registered MaStR units
Snapshot transition: 30 Sept 2026 → 1 Oct 2026
MaStR unit IDs: SEE979878063212, SEE979884048487
Commercial signals (2): cmuq3co510xapwtj4gk5gob8q, cmuq3co510xaowtj4stmyq0bx

Grouping basisSite-level (shared MaStR location ID)
Supporting registry evidence: Shared stable MaStR location ID
Stable MaStR location ID: SEL937163339992
These registrations share a stable MaStR location ID. GridGraph still does not assert that they form one canonical development project.
Operator change
50Lead relevance · Moderate

Why this ranks here. The registered operator is known. It affects only one 6.8 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance50

  • Project scale (MW)9
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality21

  • Event type14
  • MW affected7

Registered operator changed on a wind unit — 6.8 MW

Villmar, Hessen · Operator: UGE Villmar GmbH & Co. KG Umweltgerechte Energie

1 unit · 6.8 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 1 wind unit.

A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligence
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Previous registered operator
UKA Umweltgerechte Kraftanlagen GmbH & Co. KG
New registered operator
UGE Villmar GmbH & Co. KG Umweltgerechte Energie
  • Project development or development-management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 30 Sept 2026 → 1 Oct 2026
MaStR unit IDs: SEE967463780415
Commercial signals (1): cmuq3co510xaqwtj408qb5pkl

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

New developments (12)

New planned asset
66Lead relevance · High

Why this ranks high. Large 49.2 MW multi-unit signal and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; the grouping evidence is limited.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance66

  • Project scale (MW)20
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence4

Signal materiality47

  • Event type20
  • MW affected15
  • Units affected12

New planned wind units — 7 units / 49.2 MW

Kollmar, Schleswig-Holstein · Operator: Registered operator name not resolved

7 planned units · 49.2 MW · First observed 01 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 May 2028

7 new planned wind units totalling 49.2 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
7
Total registered capacity
49.2 MW
Capacity per unit
6–7.2 MW per unit
First observed in MaStR snapshot
01 Oct 2026
Planned commissioning
31 May 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Conservative group — Same planned/commissioning date on every unit
Presentation group: 7 registered MaStR units
Snapshot transition: First tracked snapshot → 1 Oct 2026
MaStR unit IDs: SEE967632113426, SEE914750102665, SEE982589406605, SEE925719344217, SEE981771731907, SEE981767100762, SEE961019091543
Commercial signals (7): cmuq3co550xdlwtj4ju7yfyc2, cmuq3co550xdmwtj46cmhx1cc, cmuq3co550xdnwtj4vye4ke7j, cmuq3co550xdpwtj42gu3jlxl, cmuq3co550xdhwtj4464u6tuu, cmuq3co550xdiwtj4x72byjuu, cmuq3co550xdjwtj4lgysxzur

Grouping basisConservative group
Supporting registry evidence: Same planned/commissioning date on every unit
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
66Lead relevance · High

Why this ranks high. Mid-sized 34 MW signal, 5 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance66

  • Project scale (MW)18
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence6

Signal materiality44

  • Event type20
  • MW affected13
  • Units affected11

New planned wind development signal — 5 units / 34 MW

Altenmedingen, Niedersachsen · Operator: Registered operator name not resolved

5 planned units · 34 MW · First observed 01 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Sept 2029

5 new planned wind units totalling 34 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
5
Total registered capacity
34 MW
Capacity per unit
6.8 MW each
First observed in MaStR snapshot
01 Oct 2026
Planned commissioning
01 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 5 registered MaStR units
Snapshot transition: First tracked snapshot → 1 Oct 2026
MaStR unit IDs: SEE946440754496, SEE930208975070, SEE979417171392, SEE971444807299, SEE946548296782
Commercial signals (5): cmuq3co550xdkwtj48y400dzo, cmuq3co550xdowtj4t1ogx2cf, cmuq3co550xdqwtj4mwvzrtc5, cmuq3co550xdrwtj41f4p4avg, cmuq3co550xdswtj41cas0vfp

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
64Lead relevance · High

Why this ranks high. Mid-sized 15.6 MW signal, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance64

  • Project scale (MW)13
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3

Signal materiality35

  • Event type20
  • MW affected10
  • Units affected5

New planned wind development signal — 2 units / 15.6 MW

Badbergen, Niedersachsen · Operator: Prowind GmbH

2 planned units · 15.6 MW · First observed 01 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 27 Dec 2028

2 new planned wind units totalling 15.6 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
15.6 MW
Capacity per unit
7.8 MW each
First observed in MaStR snapshot
01 Oct 2026
Planned commissioning
27 Dec 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“im fredeblacken…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 1 Oct 2026
MaStR unit IDs: SEE940191890496, SEE958739267563
Commercial signals (2): cmuq3co540xcvwtj4ev4v08q3, cmuq3co540xcxwtj4lzilraql

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“im fredeblacken…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
64Lead relevance · High

Why this ranks high. Mid-sized 15.6 MW signal, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance64

  • Project scale (MW)13
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3

Signal materiality35

  • Event type20
  • MW affected10
  • Units affected5

New planned wind development signal — 2 units / 15.6 MW

Gehrde, Niedersachsen · Operator: Prowind GmbH

2 planned units · 15.6 MW · First observed 01 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Aug 2028

2 new planned wind units totalling 15.6 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
15.6 MW
Capacity per unit
7.8 MW each
First observed in MaStR snapshot
01 Oct 2026
Planned commissioning
01 Aug 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“majorsweg…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 1 Oct 2026
MaStR unit IDs: SEE906361481123, SEE900939407706
Commercial signals (2): cmuq3co540xcrwtj46jv64aje, cmuq3co540xcuwtj41sop7vb3

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“majorsweg…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
64Lead relevance · High

Why this ranks high. Mid-sized 13.6 MW signal, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance64

  • Project scale (MW)13
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3

Signal materiality34

  • Event type20
  • MW affected9
  • Units affected5

New planned wind development signal — 2 units / 13.6 MW

Bad Zwischenahn, Niedersachsen · Operator: UKA Umweltgerechte Kraftanlagen GmbH & Co. KG

2 planned units · 13.6 MW · First observed 01 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 23 Sept – 28 Sept 2029

2 new planned wind units totalling 13.6 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
13.6 MW
Capacity per unit
6.8 MW each
First observed in MaStR snapshot
01 Oct 2026
Planned commissioning between
23 Sept – 28 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“aschhausen nord…”); Identical registered capacity; Planned/commissioning dates within 5 days of each other
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 1 Oct 2026
MaStR unit IDs: SEE914973140123, SEE907394418452
Commercial signals (2): cmuq3co540xctwtj4juorq1d0, cmuq3co540xcwwtj43k0lw6gh

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“aschhausen nord…”); Identical registered capacity; Planned/commissioning dates within 5 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
64Lead relevance · High

Why this ranks high. Mid-sized 13.6 MW signal, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance64

  • Project scale (MW)13
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3

Signal materiality34

  • Event type20
  • MW affected9
  • Units affected5

New planned wind development signal — 2 units / 13.6 MW

Mücheln (Geiseltal), Sachsen-Anhalt · Operator: NOTUS energy Opera GmbH & Co.KG

2 planned units · 13.6 MW · First observed 01 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 12 Dec 2027

2 new planned wind units totalling 13.6 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
13.6 MW
Capacity per unit
6.8 MW each
First observed in MaStR snapshot
01 Oct 2026
Planned commissioning
12 Dec 2027
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 1 Oct 2026
MaStR unit IDs: SEE929948240784, SEE957259774117
Commercial signals (2): cmuq3co530xc8wtj4u5bbu7jr, cmuq3co530xcbwtj4yxliqjgp

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
63Lead relevance · High

Why this ranks high. Freshly registered planned asset and the registered operator is known. Small combined capacity (12 MW).

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance63

  • Project scale (MW)12
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3

Signal materiality34

  • Event type20
  • MW affected9
  • Units affected5

New planned wind development signal — 2 units / 12 MW

Barntrup, Nordrhein-Westfalen · Operator: Windpark Saalberg

2 planned units · 12 MW · First observed 01 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 08 Dec 2028

2 new planned wind units totalling 12 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
12 MW
Capacity per unit
6 MW each
First observed in MaStR snapshot
01 Oct 2026
Planned commissioning
08 Dec 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 1 Oct 2026
MaStR unit IDs: SEE925241110328, SEE936942386912
Commercial signals (2): cmuq3co540xdawtj46dbjplop, cmuq3co550xdbwtj43x8sch5b

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
62Lead relevance · High

Why this ranks high. Mid-sized 21.6 MW signal, 3 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance62

  • Project scale (MW)15
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence5

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind development signal — 3 units / 21.6 MW

Randowtal, Brandenburg · Operator: Registered operator name not resolved

3 planned units · 21.6 MW · First observed 01 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Sept 2028

3 new planned wind units totalling 21.6 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
21.6 MW
Capacity per unit
7.2 MW each
First observed in MaStR snapshot
01 Oct 2026
Planned commissioning
30 Sept 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 1 Oct 2026
MaStR unit IDs: SEE941994447405, SEE919193314439, SEE904035989098
Commercial signals (3): cmuq3co530xc2wtj4k8rhngex, cmuq3co530xc5wtj4ezretx81, cmuq3co530xc6wtj4dkoh8wy7

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
62Lead relevance · High

Why this ranks high. Mid-sized 20.4 MW signal, 3 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance62

  • Project scale (MW)15
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence5

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind development signal — 3 units / 20.4 MW

Weste, Niedersachsen · Operator: Registered operator name not resolved

3 planned units · 20.4 MW · First observed 01 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Sept 2029

3 new planned wind units totalling 20.4 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
20.4 MW
Capacity per unit
6.8 MW each
First observed in MaStR snapshot
01 Oct 2026
Planned commissioning
01 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 1 Oct 2026
MaStR unit IDs: SEE909307141563, SEE955976336755, SEE919953145266
Commercial signals (3): cmuq3co550xdvwtj4xg264kxu, cmuq3co550xdtwtj4ez3xtc2y, cmuq3co550xduwtj40nml1sib

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
62Lead relevance · High

Why this ranks high. Freshly registered planned asset and the registered operator is known. Small combined capacity (11.56 MW); the grouping evidence is limited.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance62

  • Project scale (MW)12
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence2

Signal materiality34

  • Event type20
  • MW affected9
  • Units affected5

New planned wind units — 2 units / 11.56 MW

Blomberg, Nordrhein-Westfalen · Operator: Windpark Püllenberg GmbH & Co. KG

2 planned units · 11.56 MW · First observed 01 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Jun 2028

2 new planned wind units totalling 11.56 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
11.56 MW
Capacity per unit
5.56–6 MW per unit
First observed in MaStR snapshot
01 Oct 2026
Planned commissioning
30 Jun 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Conservative group — Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 1 Oct 2026
MaStR unit IDs: SEE965301184944, SEE939956869440
Commercial signals (2): cmuq3co530xc3wtj40cnnxark, cmuq3co530xc7wtj4id8n54zk

Grouping basisConservative group
Supporting registry evidence: Same planned/commissioning date on every unit
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
62Lead relevance · High

Why this ranks high. Freshly registered planned asset and the registered operator is known. Small combined capacity (9.2 MW).

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance62

  • Project scale (MW)11
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3

Signal materiality33

  • Event type20
  • MW affected8
  • Units affected5

New planned wind development signal — 2 units / 9.2 MW

Brunow, Mecklenburg-Vorpommern · Operator: Energiepark Brunow Klüß GmbH & Co. KG

2 planned units · 9.2 MW · First observed 01 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Sept 2028

2 new planned wind units totalling 9.2 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
9.2 MW
Capacity per unit
4.2–5 MW per unit
First observed in MaStR snapshot
01 Oct 2026
Planned commissioning
30 Sept 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“brunow klüß ii…”); Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 1 Oct 2026
MaStR unit IDs: SEE977287645098, SEE993098936194
Commercial signals (2): cmuq3co530xc4wtj4t3d993aa, cmuq3co530xcfwtj4q4gfmoke

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“brunow klüß ii…”); Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
58Lead relevance · Moderate

Why this ranks here. Mid-sized 14.4 MW signal and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance58

  • Project scale (MW)13
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence3

Signal materiality35

  • Event type20
  • MW affected10
  • Units affected5

New planned wind development signal — 2 units / 14.4 MW

Nordstemmen, Niedersachsen · Operator: Registered operator name not resolved

2 planned units · 14.4 MW · First observed 01 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Sept 2029

2 new planned wind units totalling 14.4 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
14.4 MW
Capacity per unit
7.2 MW each
First observed in MaStR snapshot
01 Oct 2026
Planned commissioning
01 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 1 Oct 2026
MaStR unit IDs: SEE929755083239, SEE910868052731
Commercial signals (2): cmuq3co550xdfwtj4ftioxxso, cmuq3co550xdgwtj48ut88r1d

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
↑ Back to top

Major schedule changes (5)

Multiple changes
66Lead relevance · High

Why this ranks high. Mid-sized 22.24 MW signal, 4 registrations moving together, schedule and operator changes recorded together on the same units and unusually large schedule shift (320 days). Operator identity is unresolved, which reduces immediate actionability; it may still reflect a registry correction rather than a new commercial need.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance66

  • Project scale (MW)15
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence6
  • Several changes together5
  • Size of change5

Signal materiality64

  • Event type16
  • Size of change21
  • MW affected11
  • Units affected10
  • Several changes together6

Multiple registry changes (schedule + operator) — 4 units / 22.24 MW

Sömmerda, Thüringen · Operator: Registered operator name not resolved

4 units · 22.24 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Apr 2026

4 wind units registered a later planned commissioning date (+238 days to +320 days). The registered operator changed on 4 wind units.

Several registry changes were recorded together on the same units. That may indicate a substantive update to the project rather than a routine correction, and is worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timingAsset transactionsFinancing
Registry correction?Permit & construction statusDeveloper updatesCompany register
Facts, hypotheses and how to verify
Units with a new planned date
4
Planned commissioning before
01 Apr 2026
Planned commissioning now
25 Nov 2026 – 15 Feb 2027
Shift per unit
+238 to +320 days
Units with an operator change
4
Previous registered operator
Energiequelle GmbH
New registered operator
Operator ID ABR905693656667 (name not resolved)
  • Project development or development-management services
  • Engineering and environmental services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check permitting and construction status
  • Check whether the previous and new operators are related entities
  • Look for recent developer updates
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wp sömmerda…”); Identical registered capacity; Planned/commissioning dates within 82 days of each other
Presentation group: 4 registered MaStR units
Snapshot transition: 30 Sept 2026 → 1 Oct 2026
MaStR unit IDs: SEE924401845049, SEE964769476066, SEE926090628903, SEE953783680832
Commercial signals (8): cmuq3co510xaywtj4kqglkmga, cmuq3co510xb0wtj4v8azt3ow, cmuq3co510xb2wtj4bpbpgjxq, cmuq3co510xb4wtj4j32wf88q, cmuq3co510xb1wtj4s415y8n6, cmuq3co510xazwtj4k5z399lo, cmuq3co510xb5wtj4k7wu426h, cmuq3co510xb3wtj44mrrey19

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp sömmerda…”); Identical registered capacity; Planned/commissioning dates within 82 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
  • SEE924401845049WP Sömmerda WEA 01 · 5.56 MW · 2027-01-11 · Apr 2026 → Jan 2027 (+285 days); operator → ID ABR905693656667View official MaStR record ↗
  • SEE964769476066WP Sömmerda WEA 02 · 5.56 MW · 2026-12-16 · Apr 2026 → Dec 2026 (+259 days); operator → ID ABR905693656667View official MaStR record ↗
  • SEE926090628903WP Sömmerda WEA 03 · 5.56 MW · 2026-11-25 · Apr 2026 → Nov 2026 (+238 days); operator → ID ABR905693656667View official MaStR record ↗
  • SEE953783680832WP Sömmerda WEA 04 · 5.56 MW · 2027-02-15 · Apr 2026 → Feb 2027 (+320 days); operator → ID ABR905693656667View official MaStR record ↗
Schedule change
66Lead relevance · High

Why this ranks high. Mid-sized 22.24 MW signal, 4 registrations moving together, unusually large schedule shift (198 days) and the registered operator is known. It may still reflect a registry correction rather than a new commercial need.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance66

  • Project scale (MW)15
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6
  • Size of change5

Signal materiality56

  • Event type16
  • Size of change19
  • MW affected11
  • Units affected10

Commissioning delayed by up to 198 days — 4 units / 22.24 MW

Heringen (Werra), Hessen · Operator: Windpark GmbH & Co. Heringen-Monte Kali KG

4 units · 22.24 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Oct 2026

4 wind units registered a later planned commissioning date (+135 days to +198 days).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
4
Planned commissioning before
01 Oct 2026
Planned commissioning now
13 Feb – 17 Apr 2027
Shift per unit
+135 to +198 days
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wp gaishecke ii wea…”); Identical registered capacity; Planned/commissioning dates within 63 days of each other
Presentation group: 4 registered MaStR units
Snapshot transition: 30 Sept 2026 → 1 Oct 2026
MaStR unit IDs: SEE991003107165, SEE924310371240, SEE963024883984, SEE968003070737
Commercial signals (4): cmuq3co520xb8wtj471eb6ler, cmuq3co520xb9wtj4ugyx9ggv, cmuq3co520xbawtj4cb63tkev, cmuq3co520xbbwtj45wb320h5

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp gaishecke ii wea…”); Identical registered capacity; Planned/commissioning dates within 63 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
61Lead relevance · High

Why this ranks high. Mid-sized 14.4 MW signal, unusually large schedule shift (303 days) and the registered operator is known. It may still reflect a registry correction rather than a new commercial need.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance61

  • Project scale (MW)13
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3
  • Size of change5

Signal materiality52

  • Event type16
  • Size of change21
  • MW affected10
  • Units affected5

Commissioning delayed by up to 303 days — 2 units / 14.4 MW

Bad Wünnenberg, Nordrhein-Westfalen · Operator: Hirschweg GmbH & Co. KG

2 units · 14.4 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Sept 2026 → Jul 2027 (+303 days)

2 wind units registered a later planned commissioning date (+303 days).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
2
Planned commissioning (same for every unit)
Sept 2026 → Jul 2027 (+303 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“sintfeld…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 30 Sept 2026 → 1 Oct 2026
MaStR unit IDs: SEE937010566762, SEE931278864707
Commercial signals (2): cmuq3co520xbewtj4s9squtjf, cmuq3co520xbfwtj4u0gadpqa

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“sintfeld…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
60Lead relevance · High

Why this ranks high. The registered operator is known. Small combined capacity (12.4 MW).

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance60

  • Project scale (MW)12
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3
  • Size of change5

Signal materiality48

  • Event type16
  • Size of change18
  • MW affected9
  • Units affected5

Commissioning delayed by up to 169 days — 2 units / 12.4 MW

Bad Wünnenberg, Nordrhein-Westfalen · Operator: WP Röhrengrund GmbH & Co. KG

2 units · 12.4 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 15 Sept – 15 Oct 2026

2 wind units registered a later planned commissioning date (+139 days to +169 days).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
2
Planned commissioning before
15 Sept – 15 Oct 2026
Planned commissioning now
03 Mar 2027
Shift per unit
+139 to +169 days
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 30 Sept 2026 → 1 Oct 2026
MaStR unit IDs: SEE988001713146, SEE949657043926
Commercial signals (2): cmuq3co510xavwtj4hmb40tul, cmuq3co510xawwtj4ctvqxtcz

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
59Lead relevance · Moderate

Why this ranks here. Unusually large schedule shift (303 days) and the registered operator is known. Small combined capacity (10.2 MW); it may still reflect a registry correction rather than a new commercial need; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance59

  • Project scale (MW)11
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3
  • Size of change5

Signal materiality50

  • Event type16
  • Size of change21
  • MW affected8
  • Units affected5

Commissioning delayed by up to 303 days — 2 units / 10.2 MW

Bad Wünnenberg, Nordrhein-Westfalen · Operator: Muchtwind GmbH & Co. KG

2 units · 10.2 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 15 Sept 2026 – 10 Mar 2027

2 wind units registered a later planned commissioning date (+127 days to +303 days).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
2
Planned commissioning before
15 Sept 2026 – 10 Mar 2027
Planned commissioning now
15 Jul 2027
Shift per unit
+127 to +303 days
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“sintfeld…”); Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 30 Sept 2026 → 1 Oct 2026
MaStR unit IDs: SEE932183195924, SEE925763493930
Commercial signals (2): cmuq3co520xbgwtj4qkn4oqwb, cmuq3co520xbhwtj4zddr21a0

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“sintfeld…”); Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
↑ Back to top

Recently commissioned assets (2)

Commissioned asset
35Lead relevance · Low

Why this ranks here. The registered operator is known. It affects only one 5.56 MW unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance35

  • Project scale (MW)8
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality18

  • Event type12
  • MW affected6

Wind unit commissioned — 5.56 MW

Ellwangen (Jagst), Baden-Württemberg · Operator: WP Ellwanger Berge Projekt III GmbH & Co.KG

1 unit · 5.56 MW

Wind · Wind turbine (horizontal-axis)

1 wind unit (5.56 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 29 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
5.56 MW
Commissioning date
29 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 30 Sept 2026 → 1 Oct 2026
MaStR unit IDs: SEE999679902947
Commercial signals (1): cmuq3co510xaxwtj4xako7e5j

Grouping basisSingle unit
Stable MaStR location ID: SEL941144481167
A single MaStR registration.
Commissioned asset
31Lead relevance · Low

Why this ranks here. The registered operator is known. It affects only one 1.84 MW unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance31

  • Project scale (MW)4
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality16

  • Event type12
  • MW affected4

Biomass unit commissioned — 1.84 MW

Osterhofen, Bayern · Operator: Weigl Biogas GmbH & Co.KG

1 unit · 1.84 MW

Biomass · Verbrennungsmotor

1 biomass unit (1.84 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 31 Aug 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
1.84 MW
Commissioning date
31 Aug 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 30 Sept 2026 → 1 Oct 2026
MaStR unit IDs: SEE920801206961
Commercial signals (1): cmuq3co510xanwtj4g71iprie

Grouping basisSingle unit
Stable MaStR location ID: SEL946293980257
A single MaStR registration.
↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.