Intelligence brief

German Energy Asset Change Intelligence — 2026-09-23

A curated, source-traceable view of registered MaStR asset updates.

Coverage: 22 Sept → 23 Sept 2026Latest MaStR snapshot: 23 Sept 2026Snapshots compared: 2

Covers one snapshot-to-snapshot transition. Do not compare its counts with weekly or multi-day reports.

Source coverageLatest MaStR snapshot: 23 Sept 2026Changes compared with: 22 Sept 2026Brief generated: 24 Sept 2026
8Top opportunities shown
The diversified selection shown in the Top section. 21 grouped events score above the investigation threshold in total. A registry signal only: it does not establish procurement activity or buyer intent.
9New development signals
5Major schedule shifts
4Operator changes
5Commissioning events
171.66 MWNewly planned capacity

24 grouped events (units merged into likely site groups; not confirmed projects). Unit-level records: 61 registry changes across 59 registrations, 375 MW registered capacity.

Start here

  1. 74New planned wind development signal — 3 units / 21 MW · Großenkneten, Niedersachsen
  2. 71New planned wind development signal — 3 units / 20.4 MW · Visbek, Niedersachsen
  3. 69New planned wind development signal — 8 units / 54.4 MW · Drebkau, Brandenburg
  4. 69New planned wind development signal — 3 units / 18 MW · Dortmund, Nordrhein-Westfalen
  5. 68Multiple registry changes (capacity + schedule) — 2 units / 14 MW · Veldenz, Rheinland-Pfalz

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

Top opportunities to investigate (8)

Selected from the highest-scoring investigation signals, with category diversification to avoid repetitive results. Cards are ordered by opportunity score; a higher-scoring signal of an already well-represented type may appear in a section below. Scores are deterministic and are not probabilities. Everything here is a starting point for verification, not evidence of demand.

New planned asset
74Lead relevance · High

Why this ranks high. Mid-sized 21 MW signal, 3 registrations moving together, freshly registered planned asset, the registered operator is known and external evidence identifies the project company and corroborates the development, increasing actionability.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance74

  • Project scale (MW)15
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5
  • External verification6

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind development signal — 3 units / 21 MW

Großenkneten, Niedersachsen · Operator: WindStrom Erneuerbare Energien GmbH & Co. KG

3 planned units · 21 MW · First observed 23 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Dec 2029

3 new planned wind units totalling 21 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Externally corroborated · 2 independent sources

Project corroboration does not establish procurement activity.

Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
21 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
23 Sept 2026
Planned commissioning
31 Dec 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
External evidence details

External verification: Corroborated

External sources corroborate a planned wind development in Großenkneten associated with WindStrom Erneuerbare Energien GmbH & Co. KG. A public source also matches the registered project scale. At least one source refers to planning or permitting. No public procurement evidence was found in this verification run.

Project company
WindStrom Erneuerbare Energien GmbH & Co. KG
Developer
Not identified
Project evidence
Strong
Commercial evidence
None found

No public procurement evidence was found in this verification run.

2 independent external sources.

Registry lead relevance: 68 → After external verification: 74 (+6) +6: project corroborated and developer / project company identified by an external source.

Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Corroborated — 2 independent external sources at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Grouping: Likely site group — Shared unit-name pattern (“wp halenhorst…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 23 Sept 2026
MaStR unit IDs: SEE951760436229, SEE961258641462, SEE961317852655
Commercial signals (3): cmudlg98n3km1wt3o0e7llebt, cmudlg98q3kngwt3o73f3i52i, cmudlg98q3knhwt3o3djhd9o5

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp halenhorst…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
71Lead relevance · High

Why this ranks high. Mid-sized 20.4 MW signal, 3 registrations moving together, freshly registered planned asset and the registered operator is known. External corroboration is only partial.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance71

  • Project scale (MW)15
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5
  • External verification3

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind development signal — 3 units / 20.4 MW

Visbek, Niedersachsen · Operator: EFG Energy-Farming Holding GmbH

3 planned units · 20.4 MW · First observed 23 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Oct 2028

3 new planned wind units totalling 20.4 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Partially corroborated externally · 3 independent sources

Project corroboration does not establish procurement activity.

External evidence predates registry detection; newly observed does not necessarily mean a new project.

Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
20.4 MW
Capacity per unit
6.8 MW each
First observed in MaStR snapshot
23 Sept 2026
Planned commissioning
01 Oct 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
External evidence details

External verification: Partially corroborated

Some external sources mention a wind development in Visbek associated with EFG Energy-Farming Holding GmbH, but the match to the registered project is incomplete. Public project evidence found as early as 13 Aug 2026; GridGraph first observed the MaStR registration on 23 Sept 2026. Related commercial activity (for example a supplier order or tender) was found for this company or place, but it cannot yet be tied to this exact registered project.

Project company
EFG Energy-Farming Holding GmbH
Developer
Not identified
Project evidence
Partial
Commercial evidence
Related activity, not pinned to this project

Related commercial activity (for example a supplier order or tender) was found for this company or place, but it cannot yet be tied to this exact registered project.

3 independent external sources.

Registry lead relevance: 68 → After external verification: 71 (+3) +3: identity or project only partially corroborated; +1 related commercial activity that cannot yet be pinned to this exact group.

Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Partially corroborated — 3 independent external sources at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Grouping: Likely site group — Shared unit-name pattern (“im wp varnhorn…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 23 Sept 2026
MaStR unit IDs: SEE980303323740, SEE904201364995, SEE968225743846
Commercial signals (3): cmudlg98p3kn6wt3okk3qzhb2, cmudlg98o3kmjwt3oxcj7a68v, cmudlg98p3kncwt3oy3pqrzaa

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“im wp varnhorn…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
69Lead relevance · High

Why this ranks high. Large 54.4 MW multi-unit signal, 8 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; a targeted external search found no reliable corroborating source yet, which is not proof that the project does not exist.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance69

  • Project scale (MW)20
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence7

Signal materiality48

  • Event type20
  • MW affected15
  • Units affected13

New planned wind development signal — 8 units / 54.4 MW

Drebkau, Brandenburg · Operator: Registered operator name not resolved

8 planned units · 54.4 MW · First observed 23 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Jun 2028

8 new planned wind units totalling 54.4 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search performed; no project corroboration
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
8
Total registered capacity
54.4 MW
Capacity per unit
6.8 MW each
First observed in MaStR snapshot
23 Sept 2026
Planned commissioning
30 Jun 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
External evidence details

External verification: Searched, no reliable evidence found

A targeted search (5 queries) found no sufficiently reliable external source for this wind development in Drebkau. This does not show that the project does not exist. No public procurement evidence was found in this verification run.

Project company
Not resolved
Developer
Not identified
Project evidence
None
Commercial evidence
None found

We searched and found no reliable external evidence yet. This is not proof that the project does not exist.

No public procurement evidence was found in this verification run.

No independent external sources.

Registry lead relevance: 69 (unchanged by external verification) Searched, but no reliable external evidence was found; registry score unchanged.

Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Searched, no reliable evidence found — a targeted search found no sufficiently reliable external source, which is not proof that the project does not exist. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Grouping: Likely site group — Shared unit-name pattern (“leu wea…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 8 registered MaStR units
Snapshot transition: First tracked snapshot → 23 Sept 2026
MaStR unit IDs: SEE931861315005, SEE939284228667, SEE926825478605, SEE915763891379, SEE910867963243, SEE989181562050, SEE975680735514, SEE963925290607
Commercial signals (8): cmudlg98n3km9wt3ofioauza5, cmudlg98n3km7wt3om351glqw, cmudlg98o3kmdwt3o8w9cse9q, cmudlg98o3kmgwt3o3y8h6nel, cmudlg98o3kmhwt3ovkrsye2g, cmudlg98o3kmwwt3olbxejowt, cmudlg98p3kn8wt3owik04vo7, cmudlg98q3knjwt3o58acmchj

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“leu wea…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
69Lead relevance · High

Why this ranks high. Mid-sized 18 MW signal, 3 registrations moving together, freshly registered planned asset and the registered operator is known. External corroboration is only partial.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance69

  • Project scale (MW)14
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5
  • External verification2

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind development signal — 3 units / 18 MW

Dortmund, Nordrhein-Westfalen · Operator: Windpark Ellinghausen GmbH & Co. KG

3 planned units · 18 MW · First observed 23 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Jul 2028

3 new planned wind units totalling 18 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Partially corroborated externally · 1 independent source

Project corroboration does not establish procurement activity.

Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
18 MW
Capacity per unit
6 MW each
First observed in MaStR snapshot
23 Sept 2026
Planned commissioning
01 Jul 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
External evidence details

External verification: Partially corroborated

Some external sources mention a wind development in Dortmund associated with Windpark Ellinghausen GmbH & Co. KG, but the match to the registered project is incomplete. No public procurement evidence was found in this verification run.

Project company
Windpark Ellinghausen GmbH & Co. KG
Developer
Not identified
Project evidence
Partial
Commercial evidence
None found

No public procurement evidence was found in this verification run.

1 independent external source.

Registry lead relevance: 67 → After external verification: 69 (+2) +2: identity or project only partially corroborated.

Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Partially corroborated — 1 independent external source at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 23 Sept 2026
MaStR unit IDs: SEE959433652280, SEE951192593958, SEE965539734218
Commercial signals (3): cmudlg98n3klxwt3obs454n7o, cmudlg98n3km2wt3ognnl3r0k, cmudlg98q3knfwt3oon608aqy

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Multiple changes
68Lead relevance · High

Why this ranks high. Mid-sized 14 MW signal, capacity and schedule changes recorded together on the same units and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance68

  • Project scale (MW)13
  • Event type14
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3
  • Several changes together5
  • Size of change5

Signal materiality56

  • Event type18
  • Size of change18
  • MW affected9
  • Units affected5
  • Several changes together6

Multiple registry changes (capacity + schedule) — 2 units / 14 MW

Veldenz, Rheinland-Pfalz · Operator: JUWI GmbH

2 units · 14 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Mar 2028 → Sept 2028 (+182 days)

2 wind units registered a capacity change; combined registered capacity moved from 11.12 MW to 14 MW (+2.88 MW). 2 wind units registered a later planned commissioning date (+182 days).

Several registry changes were recorded together on the same units. That may indicate a substantive update to the project rather than a routine correction, and is worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Design / technologyGrid connectionEngineeringEquipment sizingProject schedulingConstruction timing
Design change?Permit & grid documentsDeveloper updatesRegistry correction?
Facts, hypotheses and how to verify
Per-unit change
2 units changed from 5.56 MW to 7 MW each
Combined registered capacity now
14 MW
Combined change
+2.88 MW (+26%)
Units with a new planned date
2
Planned commissioning (same for every unit)
Mar 2028 → Sept 2028 (+182 days)
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Check whether the change reflects a design or turbine-model change
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Compare with permit and grid-connection documents
  • Check permitting and construction status
  • Look for recent developer announcements
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“veldenz gornhausen monzelfeld…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 22 Sept 2026 → 23 Sept 2026
MaStR unit IDs: SEE992111188688, SEE927871590198
Commercial signals (4): cmudlg98o3kmswt3ok982p3c8, cmudlg98o3kmcwt3oy6xr9xqw, cmudlg98o3kmrwt3o4ek8mi5s, cmudlg98n3kmbwt3o6ljnd4qf

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“veldenz gornhausen monzelfeld…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
  • SEE992111188688Veldenz-Gornhausen-Monzelfeld 5 (WEA Ve10) · 7 MW · 2028-09-01 · Mar 2028 → Sept 2028 (+182 days); 5.56 MW → 7 MWView official MaStR record ↗
  • SEE927871590198Veldenz-Gornhausen-Monzelfeld 5 (WEA Ve9) · 7 MW · 2028-09-01 · Mar 2028 → Sept 2028 (+182 days); 5.56 MW → 7 MWView official MaStR record ↗
Operator change
62Lead relevance · High

Why this ranks high. Mid-sized 22 MW signal, 4 registrations moving together and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance62

  • Project scale (MW)15
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality35

  • Event type14
  • MW affected11
  • Units affected10

Registered operator changed on 4 wind units — 4 units / 22 MW

Volkmarsen, Hessen · Operator: 2 registered operators

4 units · 22 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 4 wind units, now registered to 2 different operators.

Several units moving from one registered operator to different registered operators may reflect project-company restructuring, for example separate operating entities per unit. That is worth checking against company records; the change alone does not establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligence
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Units with an operator change
4
Previous registered operator
BürgerWindEnergie Ehringen GmbH & Co. KG
New registered operator
2 different registered operators: Windpark Ehringen GmbH & Co. KG; Operator ID ABR968165488708 (name not resolved)
  • Project development or development-management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 4 registered MaStR units
Snapshot transition: 22 Sept 2026 → 23 Sept 2026
MaStR unit IDs: SEE931406411902, SEE915776331770, SEE981059604299, SEE971807832593
Commercial signals (4): cmudlg98n3kmawt3o31dqkp8j, cmudlg98o3kmfwt3orbmpsjeh, cmudlg98p3kn4wt3ou14z664r, cmudlg98p3knawt3obn6ad769

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Capacity change
61Lead relevance · High

Why this ranks high. Mid-sized 13.6 MW signal and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance61

  • Project scale (MW)13
  • Event type14
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3
  • Size of change3

Signal materiality43

  • Event type18
  • Size of change11
  • MW affected9
  • Units affected5

Registered wind capacity increased (+2.2 MW) — 2 units / 13.6 MW

Hingstheide, Schleswig-Holstein · Operator: JUWI GmbH

2 units · 13.6 MW

Wind · Wind turbine (horizontal-axis)

2 wind units registered a capacity change; combined registered capacity moved from 11.4 MW to 13.6 MW (+2.2 MW).

A larger registered capacity may indicate a changed project design, turbine or equipment choice, or grid-connection scope, and could affect engineering and equipment requirements.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Design / technologyGrid connectionEngineeringEquipment sizing
Design change?Permit & grid documentsDeveloper updates
Facts, hypotheses and how to verify
Per-unit change
2 units changed from 5.7 MW to 6.8 MW each
Combined registered capacity now
13.6 MW
Combined change
+2.2 MW (+19%)
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Check whether the change reflects a design or turbine-model change
  • Compare with permit and grid-connection documents
  • Look for recent developer announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“hingstheide…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 22 Sept 2026 → 23 Sept 2026
MaStR unit IDs: SEE956455379027, SEE949616875230
Commercial signals (2): cmudlg98n3klzwt3o9r453lcx, cmudlg98n3km4wt3oeiky08xc

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“hingstheide…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
59Lead relevance · Moderate

Why this ranks here. Unusually large schedule shift (568 days) and the registered operator is known. Small combined capacity (10.5 MW); the grouping evidence is limited; it may still reflect a registry correction rather than a new commercial need; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance59

  • Project scale (MW)11
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence2
  • Size of change6

Signal materiality53

  • Event type16
  • Size of change24
  • MW affected8
  • Units affected5

Commissioning delayed by up to 568 days — 2 units / 10.5 MW

Angermünde, Brandenburg · Operator: Windkraft Neukünkendorf GmbH & Co. KG

2 units · 10.5 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Aug 2026 – 11 Mar 2027

2 wind units registered a later planned commissioning date (+376 days to +568 days).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
2
Planned commissioning before
31 Aug 2026 – 11 Mar 2027
Planned commissioning now
21 Mar 2028
Shift per unit
+376 to +568 days
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Conservative group — Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 22 Sept 2026 → 23 Sept 2026
MaStR unit IDs: SEE986471147065, SEE996392045579
Commercial signals (2): cmudlg98p3kmywt3odz2i923r, cmudlg98o3kmowt3okx5c0m8x

Grouping basisConservative group
Supporting registry evidence: Same planned/commissioning date on every unit
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

New developments (5)

New planned asset
69Lead relevance · High

Why this ranks high. Mid-sized 17.1 MW signal, 3 registrations moving together, freshly registered planned asset and the registered operator is known. External corroboration is only partial.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance69

  • Project scale (MW)14
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5
  • External verification2

Signal materiality38

  • Event type20
  • MW affected10
  • Units affected8

New planned wind development signal — 3 units / 17.1 MW

Ahrensbök, Schleswig-Holstein · Operator: Windpark Tankenrade GmbH & Co. KG

3 planned units · 17.1 MW · First observed 23 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Dec 2028

3 new planned wind units totalling 17.1 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Partially corroborated externally · 3 independent sources

Project corroboration does not establish procurement activity.

Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
17.1 MW
Capacity per unit
5.7 MW each
First observed in MaStR snapshot
23 Sept 2026
Planned commissioning
31 Dec 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
External evidence details

External verification: Partially corroborated

Some external sources mention a wind development in Ahrensbök associated with Windpark Tankenrade GmbH & Co. KG, but the match to the registered project is incomplete. No public procurement evidence was found in this verification run.

Project company
Windpark Tankenrade GmbH & Co. KG
Developer
Not identified
Project evidence
Partial
Commercial evidence
None found

No public procurement evidence was found in this verification run.

3 independent external sources.

Registry lead relevance: 67 → After external verification: 69 (+2) +2: identity or project only partially corroborated.

Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Partially corroborated — 3 independent external sources at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Grouping: Likely site group — Shared unit-name pattern (“tar wea…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 23 Sept 2026
MaStR unit IDs: SEE903744436794, SEE973607918927, SEE967002036089
Commercial signals (3): cmudlg98o3kmkwt3oir5bjw7w, cmudlg98p3kn9wt3op6414by7, cmudlg98p3kndwt3oqpgk4p0z

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“tar wea…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
62Lead relevance · High

Why this ranks high. Mid-sized 21 MW signal, 3 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; a targeted external search found no reliable corroborating source yet, which is not proof that the project does not exist.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance62

  • Project scale (MW)15
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence5

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind development signal — 3 units / 21 MW

Ankum, Niedersachsen · Operator: Registered operator name not resolved

3 planned units · 21 MW · First observed 23 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Sept 2029

3 new planned wind units totalling 21 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search performed; no project corroboration
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
21 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
23 Sept 2026
Planned commissioning
01 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
External evidence details

External verification: Searched, no reliable evidence found

A targeted search (5 queries) found no sufficiently reliable external source for this wind development in Ankum. This does not show that the project does not exist. No public procurement evidence was found in this verification run.

Project company
Not resolved
Developer
Not identified
Project evidence
None
Commercial evidence
None found

We searched and found no reliable external evidence yet. This is not proof that the project does not exist.

  • Nr. 15.qxdPermit document · landkreis-osnabrueck.de · Published 18 Mar 2021 · low confidenceSupports: locationVerified from PDF text · page 6“… , eine Genehmigung erteilt: Aktenzeichen: 11-ank-06395-24 Baugrundstück: Merzen/Ankum, Hamberger Str. Gemarkung: Lechtrup Westerholte Westerholte Flur: 1 1 12 Flurstück(e): 10/2 24, 27 6, 6, 7/1, 7/6, 7/7 Inhalt der Genehmigung: Genehmigungsantrag gem. § 4 BImSchG Errichtung und Betrieb von 8 WEA vom Typ Nordex N175-6.8 MW mit 179 m Naben …”Older source: weighed lower unless it clearly describes the same ongoing project.
  • Vorprüfung der Umweltverträglichkeit Änderung Windpark ...Permit document · landkreis-osnabrueck.de · Published 22 Dec 2025 · low confidenceSupports: locationVerified from PDF text · page 1“Vorprüfung der Umweltverträglichkeit Änderung Windpark Westerholte in Ankum/Merzen, Az. 3123-26 Bei dem folgenden Bauvorhaben wurde die Notwendigkeit einer Umweltverträglichkeitsprüfung (UVP) gem. § 9 Abs. 4 i.V.m. § 7 Abs. 1 nach dem Gesetz über die Umweltverträglichkeitsprüfung (UVPG) in der Fassung der Bekanntmachung vom 18. März 2021 …”
  • Neue Windparkpläne für Ankum?News / press report · noz.de · Published 7 Nov 2018 · low confidenceSupports: locationVerified from page textOlder source: weighed lower unless it clearly describes the same ongoing project.

No public procurement evidence was found in this verification run.

No independent external sources.

Registry lead relevance: 62 (unchanged by external verification) Searched, but no reliable external evidence was found; registry score unchanged.

Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Searched, no reliable evidence found — a targeted search found no sufficiently reliable external source, which is not proof that the project does not exist. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 23 Sept 2026
MaStR unit IDs: SEE943167507787, SEE976559308778, SEE963597896046
Commercial signals (3): cmudlg98n3km5wt3o1gab62t7, cmudlg98p3kn7wt3o1h6d72kt, cmudlg98q3kniwt3o9xvw8wws

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
59Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset and the registered operator is known. It affects only one 7.2 MW unit; external corroboration is only partial.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance59

  • Project scale (MW)9
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • External verification2

Signal materiality27

  • Event type20
  • MW affected7

New planned wind unit — 7.2 MW

Velburg, Bayern · Operator: Max Bögl Wind AG

1 planned unit · 7.2 MW · First observed 23 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 05 Nov 2027

A new planned wind unit of 7.2 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Partially corroborated externally · 1 independent source

Project corroboration does not establish procurement activity.

External evidence predates registry detection; newly observed does not necessarily mean a new project.

Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
7.2 MW
First observed in MaStR snapshot
23 Sept 2026
Planned commissioning
05 Nov 2027
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
External evidence details

External verification: Partially corroborated

Some external sources mention a wind development in Velburg associated with Max Bögl Wind AG, but the match to the registered project is incomplete. Public project evidence found as early as 22 May 2026; GridGraph first observed the MaStR registration on 23 Sept 2026. No public procurement evidence was found in this verification run.

Project company
Max Bögl Wind AG
Developer
Not identified
Project evidence
Partial
Commercial evidence
None found

No public procurement evidence was found in this verification run.

1 independent external source.

Registry lead relevance: 57 → After external verification: 59 (+2) +2: identity or project only partially corroborated.

Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Partially corroborated — 1 independent external source at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 23 Sept 2026
MaStR unit IDs: SEE934425208430
Commercial signals (1): cmudlg98n3km8wt3osn8a1sek

Grouping basisSingle unit
A single MaStR registration.
New planned asset
59Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset and the registered operator is known. It affects only one 7 MW unit; external corroboration is only partial.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance59

  • Project scale (MW)9
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • External verification2

Signal materiality27

  • Event type20
  • MW affected7

New planned wind unit — 7 MW

Marsberg, Nordrhein-Westfalen · Operator: Lackmann-Flocke GbR

1 planned unit · 7 MW · First observed 23 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Sept 2028

A new planned wind unit of 7 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Partially corroborated externally · 1 independent source

Project corroboration does not establish procurement activity.

Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
7 MW
First observed in MaStR snapshot
23 Sept 2026
Planned commissioning
30 Sept 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
External evidence details

External verification: Partially corroborated

Some external sources mention a wind development in Marsberg, but the match to the registered project is incomplete. No public procurement evidence was found in this verification run.

Project company
Lackmann-Flocke GbR (registered in MaStR; not confirmed externally)
Developer
Not identified
Project evidence
Partial
Commercial evidence
None found
  • Windpark Dieken GmbH & Co. KG, Marsberg, Germany, District Court of Arnsberg HRA 9375: Network, Financial informationCompany record · northdata.com · Publication date unknown · medium confidenceSupports: company identity, locationVerified from page text
  • Michael Wilhelm Flocke, MarsbergCompany record · northdata.de · Publication date unknown · medium confidenceSupports: company identity, locationVerified from page text
  • SCHMAL + RATZBORAuthority document · kreis-paderborn.de · Published 10 Nov 2023 · low confidenceSupports: company identityVerified from PDF text · page 1“Ingenieurbüro für Umweltplanung SCHMAL + RATZBOR Landschaftspflegerischer Begleitplan (LBP) Windenergieprojekt - Errichtung und Betrieb von fünf WEA „Bad Wünnenberg-Fürstenberg“ Gemeinde Bad Wünnenberg, Kreis Paderborn, Nordrhein-Westfalen Im Auftrag der Lackmann Flocke GbR November 2023”
  • [PDF] Abwägung § 3 (2), § 4 (2) BauGB - Stadt MarsbergMunicipal planning document · marsberg.de · Published 20 Jun 2025 · low confidenceSupports: locationVerified from PDF text · page 3“Stadt Marsberg – 80. Änderung des Flächennutzungsplanes für den Windpark-Giershagen Beteiligung der Öffentlichkeit und der Behörden und sonstigen Träger öffentlicher Belange gemäß §§ 3 (1) und 4 (1) BauGB sowie der Nachbargemeinden gem. § 2 (2) BauGB Seite 3 von 35 Stand: 24.06.2025 lfd. Nr. Einwender/in; Datum der Einwendung lfd. Nr. Äuß …”
  • WEA 05 WestfalenWind Planungs GmbH & Co. KG Marsberg-Westheim | UVP - UmweltverträglichkeitsprüfungenPermit document · uvp-verbund.de · Published 25 Sept 2025 · low confidenceSupports: locationVerified from page text

No public procurement evidence was found in this verification run.

1 independent external source.

Registry lead relevance: 57 → After external verification: 59 (+2) +2: identity or project only partially corroborated.

Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Partially corroborated — 1 independent external source at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 23 Sept 2026
MaStR unit IDs: SEE981266273301
Commercial signals (1): cmudlg98p3kn3wt3o4hs2yp77

Grouping basisSingle unit
A single MaStR registration.
New planned asset
56Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset and the registered operator is known. It affects only one 5.56 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance56

  • Project scale (MW)8
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality26

  • Event type20
  • MW affected6

New planned wind unit — 5.56 MW

Kall, Nordrhein-Westfalen · Operator: SK Wind GmbH & Co. KG

1 planned unit · 5.56 MW · First observed 23 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Jun 2028

A new planned wind unit of 5.56 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
5.56 MW
First observed in MaStR snapshot
23 Sept 2026
Planned commissioning
01 Jun 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 23 Sept 2026
MaStR unit IDs: SEE988219460757
Commercial signals (1): cmudlg98p3kmxwt3o209kxnp7

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Major schedule changes (3)

Schedule change
54Lead relevance · Moderate

Why this ranks here. Mid-sized 14.4 MW signal and the registered operator is known. No external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance54

  • Project scale (MW)13
  • Event type8
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3
  • Size of change2

Signal materiality40

  • Event type16
  • Size of change9
  • MW affected10
  • Units affected5

Commissioning delayed by up to 35 days — 2 units / 14.4 MW

Erkelenz, Nordrhein-Westfalen · Operator: MLK Windpark Holzweiler Nr. 100 GmbH & Co. KG

2 units · 14.4 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 08 Sept 2026

2 wind units registered a later planned commissioning date (+23 days to +35 days).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
2
Planned commissioning before
08 Sept 2026
Planned commissioning now
01 Oct – 13 Oct 2026
Shift per unit
+23 to +35 days
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Planned/commissioning dates within 12 days of each other
Presentation group: 2 registered MaStR units
Snapshot transition: 22 Sept 2026 → 23 Sept 2026
MaStR unit IDs: SEE950340927294, SEE960303446205
Commercial signals (2): cmudlg98n3km3wt3obzj009r8, cmudlg98n3klwwt3oflrf5yd9

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Planned/commissioning dates within 12 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
53Lead relevance · Moderate

Why this ranks here. Unusually large schedule shift (1676 days) and the registered operator is known. It affects only one 4.2 MW unit; it may still reflect a registry correction rather than a new commercial need; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance53

  • Project scale (MW)6
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change7

Signal materiality49

  • Event type16
  • Size of change27
  • MW affected6

Commissioning delayed by 1676 days — 4.2 MW

Ahrensfelde, Brandenburg · Operator: VS Ventor WEA3 Energiegenossenschaft eG

1 unit · 4.2 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Mar 2023 → Nov 2027 (+1676 days)

The registered planned commissioning date moved by +1676 days (Mar 2023 → Nov 2027).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Planned commissioning
Mar 2023 → Nov 2027 (+1676 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 22 Sept 2026 → 23 Sept 2026
MaStR unit IDs: SEE943165970712
Commercial signals (1): cmudlg98n3km6wt3o3qlbxz79

Grouping basisSingle unit
A single MaStR registration.
Schedule change
53Lead relevance · Moderate

Why this ranks here. The registered operator is known. It affects only one 7 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance53

  • Project scale (MW)9
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change4

Signal materiality37

  • Event type16
  • Size of change14
  • MW affected7

Commissioning delayed by 90 days — 7 MW

Großweitzschen, Sachsen · Operator: StrockenWind GmbH & Co. KG

1 unit · 7 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Jun 2028 → Sept 2028 (+90 days)

The registered planned commissioning date moved by +90 days (Jun 2028 → Sept 2028).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Planned commissioning
Jun 2028 → Sept 2028 (+90 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 22 Sept 2026 → 23 Sept 2026
MaStR unit IDs: SEE900010115506
Commercial signals (1): cmudlg98o3kmmwt3owguwo8i2

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Operator / company changes (3)

Operator change
59Lead relevance · Moderate

Why this ranks here. Mid-sized 35 MW signal and 5 registrations moving together. Operator identity is unresolved, which reduces immediate actionability; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance59

  • Project scale (MW)18
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence6

Signal materiality38

  • Event type14
  • MW affected13
  • Units affected11

Registered operator changed on 5 wind units — 5 units / 35 MW

Schelklingen, Baden-Württemberg · Operator: Registered operator name not resolved

5 units · 35 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 5 wind units.

A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligence
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Units with an operator change
5
Previous registered operator
QE Ingstetten GmbH
New registered operator
Operator ID ABR946063704359 (name not resolved)
  • Project development or development-management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 5 registered MaStR units
Snapshot transition: 22 Sept 2026 → 23 Sept 2026
MaStR unit IDs: SEE990861292310, SEE971143840405, SEE957289084415, SEE983209358731, SEE982634082600
Commercial signals (5): cmudlg98o3kmuwt3otelmx9hi, cmudlg98p3knbwt3orzmro0bj, cmudlg98n3klywt3ozaczwvjp, cmudlg98p3kn0wt3ojvfzlqqp, cmudlg98p3kn2wt3o8ix8yt84

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Operator change
50Lead relevance · Moderate

Why this ranks here. The registered operator is known. It affects only one 7 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance50

  • Project scale (MW)9
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality21

  • Event type14
  • MW affected7

Registered operator changed on a wind unit — 7 MW

Linnich, Nordrhein-Westfalen · Operator: Ventus Bürgerstrom Kofferen Nr. 125 GmbH & Co. KG

1 unit · 7 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 1 wind unit.

A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligence
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Previous registered operator
MLK Consulting GmbH & Co. KG
New registered operator
Ventus Bürgerstrom Kofferen Nr. 125 GmbH & Co. KG
  • Project development or development-management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 22 Sept 2026 → 23 Sept 2026
MaStR unit IDs: SEE900947787715
Commercial signals (1): cmudlg98o3kmlwt3ojq06gxce

Grouping basisSingle unit
A single MaStR registration.
Operator change
43Lead relevance · Low

Why this ranks here. The registered operator is known. It affects only one 6 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance43

  • Project scale (MW)8
  • Event type13
  • Lifecycle stage4
  • Recency8
  • Operator identified10

Signal materiality21

  • Event type14
  • MW affected7

Registered operator changed on a wind unit — 6 MW

Schnarup-Thumby, Schleswig-Holstein · Operator: Windpark Schnarup-Thumby GmbH & Co. KG

1 unit · 6 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 1 wind unit.

A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligenceO&M
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Previous registered operator
Windkraft Oggelberg
New registered operator
Windpark Schnarup-Thumby GmbH & Co. KG
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 22 Sept 2026 → 23 Sept 2026
MaStR unit IDs: SEE991560622286
Commercial signals (1): cmudlg98o3kmtwt3of952t4lh

Grouping basisSingle unit
Stable MaStR location ID: SEL975687416942
A single MaStR registration.
↑ Back to top

Recently commissioned assets (5)

Commissioned asset
47Lead relevance · Moderate

Why this ranks here. Mid-sized 17.04 MW signal, 4 registrations moving together and the registered operator is known. Already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance47

  • Project scale (MW)14
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality32

  • Event type12
  • MW affected10
  • Units affected10

4 wind units commissioned — 4 units / 17.04 MW

Barver, Niedersachsen · Operator: Landvolk-Dienstleistungsgesellschaft Grafschaft Diepholz mbH

4 units · 17.04 MW

Wind · Wind turbine (horizontal-axis)

4 wind units (17.04 MW) moved from planned to commissioned status in MaStR, with registered commissioning dates between 04 Sept – 17 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Units commissioned
4
Total registered capacity
17.04 MW
Commissioned between
04 Sept – 17 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wp barver süd…”); Identical registered capacity; Planned/commissioning dates within 13 days of each other
Presentation group: 4 registered MaStR units
Snapshot transition: 22 Sept 2026 → 23 Sept 2026
MaStR unit IDs: SEE993780521998, SEE998947234865, SEE917769117538, SEE910750172622
Commercial signals (4): cmudlg98o3kmqwt3o31vne20s, cmudlg98o3kmnwt3o1s3nuao9, cmudlg98o3kmewt3okcc0uo0n, cmudlg98o3kmiwt3oqdhyx582

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp barver süd…”); Identical registered capacity; Planned/commissioning dates within 13 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Commissioned asset
47Lead relevance · Moderate

Why this ranks here. Mid-sized 21 MW signal, 3 registrations moving together and the registered operator is known. Already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance47

  • Project scale (MW)15
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10
  • Multi-unit evidence5

Signal materiality31

  • Event type12
  • MW affected11
  • Units affected8

3 wind units commissioned — 3 units / 21 MW

Söllingen, Niedersachsen · Operator: Söllingen Repowering GmbH & Co. KG

3 units · 21 MW

Wind · Wind turbine (horizontal-axis)

3 wind units (21 MW) moved from planned to commissioned status in MaStR, with registered commissioning dates between 15 Sept – 16 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Units commissioned
3
Total registered capacity
21 MW
Commissioned between
15 Sept – 16 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“söllingen…”); Identical registered capacity; Planned/commissioning dates within 1 days of each other
Presentation group: 3 registered MaStR units
Snapshot transition: 22 Sept 2026 → 23 Sept 2026
MaStR unit IDs: SEE966543373813, SEE990358963617, SEE954300544224
Commercial signals (3): cmudlg98p3knewt3o2g2fcyj9, cmudlg98o3kmvwt3o22kroj73, cmudlg98n3km0wt3ohs9ylvp4

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“söllingen…”); Identical registered capacity; Planned/commissioning dates within 1 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Commissioned asset
46Lead relevance · Moderate

Why this ranks here. Mid-sized 18.6 MW signal, 3 registrations moving together and the registered operator is known. Already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance46

  • Project scale (MW)14
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10
  • Multi-unit evidence5

Signal materiality31

  • Event type12
  • MW affected11
  • Units affected8

3 wind units commissioned — 3 units / 18.6 MW

Groitzsch, Sachsen · Operator: Windpark Breunsdorf I GmbH

3 units · 18.6 MW

Wind · Wind turbine (horizontal-axis)

3 wind units (18.6 MW) moved from planned to commissioned status in MaStR, with registered commissioning dates between 15 Sept – 17 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Units commissioned
3
Total registered capacity
18.6 MW
Commissioned between
15 Sept – 17 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wp breunsdorf i…”); Identical registered capacity; Planned/commissioning dates within 2 days of each other
Presentation group: 3 registered MaStR units
Snapshot transition: 22 Sept 2026 → 23 Sept 2026
MaStR unit IDs: SEE964010812421, SEE983618247596, SEE980504715672
Commercial signals (3): cmudlg98q3knkwt3o3bgobox4, cmudlg98p3kmzwt3o37pid91f, cmudlg98p3kn5wt3onpgydken

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp breunsdorf i…”); Identical registered capacity; Planned/commissioning dates within 2 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Commissioned asset
36Lead relevance · Low

Why this ranks here. The registered operator is known. It affects only one 6.8 MW unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance36

  • Project scale (MW)9
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality19

  • Event type12
  • MW affected7

Wind unit commissioned — 6.8 MW

Mönchengladbach, Nordrhein-Westfalen · Operator: BMR Windenergie Wanlo GmbH& Co.KG

1 unit · 6.8 MW

Wind · Wind turbine (horizontal-axis)

1 wind unit (6.8 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 30 Jun 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
6.8 MW
Commissioning date
30 Jun 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 22 Sept 2026 → 23 Sept 2026
MaStR unit IDs: SEE993794704240
Commercial signals (1): cmudlg98o3kmpwt3otf33x51q

Grouping basisSingle unit
Stable MaStR location ID: SEL900925256004
A single MaStR registration.
Commissioned asset
35Lead relevance · Low

Why this ranks here. The registered operator is known. It affects only one 6.2 MW unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance35

  • Project scale (MW)8
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality19

  • Event type12
  • MW affected7

Wind unit commissioned — 6.2 MW

Neukieritzsch, Sachsen · Operator: Windpark Breunsdorf I GmbH

1 unit · 6.2 MW

Wind · Wind turbine (horizontal-axis)

1 wind unit (6.2 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 15 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
6.2 MW
Commissioning date
15 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 22 Sept 2026 → 23 Sept 2026
MaStR unit IDs: SEE982819399202
Commercial signals (1): cmudlg98p3kn1wt3omjw01n1g

Grouping basisSingle unit
Stable MaStR location ID: SEL962367680083
A single MaStR registration.
↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.