Capacity change
61Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance61

  • Project scale (MW)13
  • Event type14
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3
  • Size of change3

Signal materiality43

  • Event type18
  • Size of change11
  • MW affected9
  • Units affected5

Registered wind capacity increased (+2.2 MW) — 2 units / 13.6 MW

Hingstheide, Schleswig-Holstein · Operator: JUWI GmbH

2 units · 13.6 MW

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorJUWI GmbH

2 wind units registered a capacity change; combined registered capacity moved from 11.4 MW to 13.6 MW (+2.2 MW).

Why this ranks high. Mid-sized 13.6 MW signal and the registered operator is known.

A larger registered capacity may indicate a changed project design, turbine or equipment choice, or grid-connection scope, and could affect engineering and equipment requirements.
Developer servicesGrid & electricalEngineering

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Per-unit change
2 units changed from 5.7 MW to 6.8 MW each
Combined registered capacity now
13.6 MW
Combined change
+2.2 MW (+19%)

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“hingstheide…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

22 Sept 2026 → 23 Sept 2026

← Back to the brief · 2026-09-23