69Lead relevance · High
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance69
- Project scale (MW)14
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence5
- External verification2
Signal materiality38
- Event type20
- MW affected10
- Units affected8
New planned wind development signal — 3 units / 17.1 MW
Ahrensbök, Schleswig-Holstein · Operator: Windpark Tankenrade GmbH & Co. KG
3 planned units · 17.1 MW · First observed 23 Sept 2026
- MaStR evidence: HIGH
- Partially corroborated externally · 3 independent sources
What changed
3 new planned wind units totalling 17.1 MW were first observed in this MaStR snapshot.
Why this ranks high. Mid-sized 17.1 MW signal, 3 registrations moving together, freshly registered planned asset and the registered operator is known. External corroboration is only partial.
What we found
External verification: Partially corroborated
Some external sources mention a wind development in Ahrensbök associated with Windpark Tankenrade GmbH & Co. KG, but the match to the registered project is incomplete. No public procurement evidence was found in this verification run.
- Project company
- Windpark Tankenrade GmbH & Co. KG
- Developer
- Not identified
- Project evidence
- Partial
- Commercial evidence
- None found
- Windpark Tankenrade GmbH & Co. KG, Ahrensbök | Firmenauskunft
- Windpark Tankenrade GmbH & Co. KG · Ahrensbök · handelsregister.ai
- Windpark Tankenrade GmbH & Co. KG — KG, Ahrensbök | Implisense
- Windpark Tankenrade GmbH & Co. KG, Ahrensbök - OpenRegister
- Windpark Tankenrade GmbH & Co. KG, Ahrensbök, Amtsgericht Lübeck HRA 10331 HL: Netzwerk, Wirtschaftsinfos
- Handelsregisterauszug von Windpark Tankenrade GmbH & Co. KG aus Ahrensbök (HRA 10331 HL)
- PDF.js viewer
- Bekanntmachungen Bauleitplanung
- Amtliche Bekanntmachung“Amtliche Bekanntmachung Bauleitplanung der Gemeinde Ahrensbök Aufstellung der 48. Änderung des Flächennutzungsplanes für ein Gebiet an der nördlichen Gemeindegrenze zu Bosau, nordwestlich der Landesstraße L184 und der Ortschaft Schwienkuhlen, südöstliche Erweiterung des Windvorranggebietes PR3_OHS_059 - Windkraft Schwienkuhlen hier: a) Be …”
No public procurement evidence was found in this verification run.
3 independent external sources.
Registry lead relevance: 67 → After external verification: 69 (+2)
Why it may matter
Possible relevance
Investigation hypotheses only. They are not evidence that any of these needs currently exist.
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
Verify next
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Change summary
- Planned units first observed
- 3
- Total registered capacity
- 17.1 MW
- Capacity per unit
- 5.7 MW each
- First observed in MaStR snapshot
- 23 Sept 2026
- Planned commissioning
- 31 Dec 2028
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (3)
SEE903744436794View official MaStR record ↗SEE973607918927View official MaStR record ↗SEE967002036089View official MaStR record ↗
Grouping basis
Supporting registry evidence: Shared unit-name pattern (“tar wea…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
MaStR technical details
- Asset type (MaStR)
- Horizontalläufer
- Energy carrier (MaStR)
- Wind
- Operating status (MaStR)
- In Planung
Evidence confidence
MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: partially corroborated; 3 independent external sources at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.
Snapshot transition
First tracked snapshot → 23 Sept 2026