Selected from the highest-scoring investigation signals, with category diversification to avoid repetitive results. Cards are ordered by opportunity score; a higher-scoring signal of an already well-represented type may appear in a section below. Scores are deterministic and are not probabilities. Everything here is a starting point for verification, not evidence of demand.
New planned asset70Lead relevance · High
Why this ranks high. Large 56 MW multi-unit signal, 8 registrations moving together and the registered operator is known. External corroboration is only partial.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance70
- Project scale (MW)20
- Event type20
- Lifecycle stage10
- Recency1
- Operator identified10
- Multi-unit evidence7
- External verification2
Signal materiality48
- Event type20
- MW affected15
- Units affected13
New planned wind development signal — 8 units / 56 MW
Bunde, Niedersachsen · Operator: ENOVA Power GmbH
8 planned units · 56 MW · First observed 25 Sept 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 01 Jan 2029
What changed
8 new planned wind units totalling 56 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Partially corroborated externally · 7 independent sources
Project corroboration does not establish procurement activity.
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 8
- Total registered capacity
- 56 MW
- Capacity per unit
- 7 MW each
- First observed in MaStR snapshot
- 25 Sept 2026
- Planned commissioning
- 01 Jan 2029
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
External evidence details
What we found
External verification: Partially corroborated
Some external sources mention a wind development in Bunde associated with ENOVA Energiesysteme GmbH & Co. KG, but the match to the registered project is incomplete. No public procurement evidence was found in this verification run.
- Project company
- ENOVA Power GmbH (registered in MaStR; not confirmed externally)
- Developer
- ENOVA Energiesysteme GmbH & Co. KG
- Project evidence
- Partial
- Commercial evidence
- None found
- Latest news about ENOVA | ENOVA PowerDeveloper announcement · enova.de · Published 7 Oct 2026 · medium confidenceSupports: project exists, company identity, locationVerified from page text
- Aktuelle Nachrichten zu ENOVA | ENOVA PowerDeveloper announcement · enova.de · Published 7 Oct 2026 · medium confidenceSupports: project exists, company identity, location, commissioning timelineVerified from page text
- #enova #enovapower #windenergie #bimschg #windpark | ENOVA PowerCompany record · de.linkedin.com · Published 2 Oct 2025 · medium confidenceSupports: company identity, locationVerified from page text
- Planung - Windpark Bunder InteressentenpolderWeb page · windpark-bunde.de · Publication date unknown · medium confidenceSupports: project exists, locationJudged from search excerpt only
- ENOVA Windpark Bunder Interessentenpolder GmbH & Co ...Web page · companyhouse.de · Publication date unknown · medium confidenceSupports: project exists, locationJudged from search excerpt only
- ENOVA Power GmbH: PressemitteilungenWeb page · iwrpressedienst.de · Published 22 Sept 2026 · medium confidenceSupports: project exists, company identity, location, commissioning timelineVerified from page text
- ENOVA Windpark Bunder Interessentenpolder GmbH & Co. KG – Germany Company Profile - TopographWeb page · topograph.co · Published 15 Oct 2026 · medium confidenceSupports: project exists, locationVerified from page text
- ENOVA Power GmbH erhält Genehmigungen für rund 100 MW Windenergie | Windkraft-JournalNews / press report · windkraft-journal.de · Published 6 Jul 2023 · low confidenceSupports: company identity, locationVerified from page textOlder source: weighed lower unless it clearly describes the same ongoing project.
- Windenergie für Bunde - Windpark Bunder InteressentenpolderWeb page · windpark-bunde.de · Published 21 Feb 2022 · low confidenceSupports: location, unit countVerified from page textOlder source: weighed lower unless it clearly describes the same ongoing project.
- Fragen und Antworten - Windpark Bunder InteressentenpolderWeb page · windpark-bunde.de · Published 27 Jan 2022 · low confidenceSupports: locationVerified from page textOlder source: weighed lower unless it clearly describes the same ongoing project.
No public procurement evidence was found in this verification run.
7 independent external sources.
Registry lead relevance: 68 → After external verification: 70 (+2) +2: identity or project only partially corroborated.
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Partially corroborated — 7 independent external sources at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 8 registered MaStR units
Snapshot transition: First tracked snapshot → 25 Sept 2026
MaStR unit IDs: SEE987941533982, SEE991407820035, SEE902505561775, SEE907408259613, SEE914847883101, SEE948664065020, SEE959180813651, SEE968927852495
Commercial signals (8): cmugfshg13evnwt1kvr1x359k, cmugfshg13evpwt1k1i9jtesj, cmugfshg23evwwt1kldpdya9e, cmugfshg23evywt1k9gyvs5cz, cmugfshg33ew3wt1kz6n186ou, cmugfshg33ewbwt1kj06xvecg, cmugfshg43ewhwt1kj7ov07va, cmugfshg43ewmwt1kyxmwzdth
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (8)
New planned asset70Lead relevance · High
Why this ranks high. Large 54.4 MW multi-unit signal, 8 registrations moving together and the registered operator is known. External corroboration is only partial.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance70
- Project scale (MW)20
- Event type20
- Lifecycle stage10
- Recency1
- Operator identified10
- Multi-unit evidence7
- External verification2
Signal materiality48
- Event type20
- MW affected15
- Units affected13
New planned wind development signal — 8 units / 54.4 MW
Willingen (Upland), Hessen · Operator: Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH
8 planned units · 54.4 MW · First observed 25 Sept 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 22 Sept 2030
What changed
8 new planned wind units totalling 54.4 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Partially corroborated externally · 1 independent source
Project corroboration does not establish procurement activity.
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 8
- Total registered capacity
- 54.4 MW
- Capacity per unit
- 6.8 MW each
- First observed in MaStR snapshot
- 25 Sept 2026
- Planned commissioning
- 22 Sept 2030
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
External evidence details
What we found
External verification: Partially corroborated
Some external sources mention a wind development in Willingen (Upland), but the match to the registered project is incomplete. No public procurement evidence was found in this verification run.
- Project company
- Verbands-Energie-Werk Gesellschaft für Erneuerbare Energien mbH (registered in MaStR; not confirmed externally)
- Developer
- Not identified
- Project evidence
- Partial
- Commercial evidence
- None found
No public procurement evidence was found in this verification run.
1 independent external source.
Registry lead relevance: 68 → After external verification: 70 (+2) +2: identity or project only partially corroborated.
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Partially corroborated — 1 independent external source at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Grouping: Likely site group — Shared unit-name pattern (“hopperkopf…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 8 registered MaStR units
Snapshot transition: First tracked snapshot → 25 Sept 2026
MaStR unit IDs: SEE994366641420, SEE902153687674, SEE907551797277, SEE911865237725, SEE916298081846, SEE953446831731, SEE966425802325, SEE971798404724
Commercial signals (8): cmugfshg23evqwt1kq6iifur9, cmugfshg23evvwt1k3101krbw, cmugfshg23evzwt1kanga2yz8, cmugfshg23ew0wt1kyw6tzmeg, cmugfshg33ew4wt1k6yjags0u, cmugfshg43ewewt1k7a557gbi, cmugfshg43ewlwt1krs67mmox, cmugfshg53ewpwt1k5q8racps
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“hopperkopf…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (8)
New planned asset69Lead relevance · High
Why this ranks high. Mid-sized 21 MW signal, 3 registrations moving together, freshly registered planned asset and the registered operator is known. External corroboration is only partial.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance69
- Project scale (MW)15
- Event type20
- Lifecycle stage10
- Recency7
- Operator identified10
- Multi-unit evidence5
- External verification2
Signal materiality39
- Event type20
- MW affected11
- Units affected8
New planned wind development signal — 3 units / 21 MW
Vollersode, Niedersachsen · Operator: Alterric Deutschland GmbH
3 planned units · 21 MW · First observed 22 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 01 Mar 2030
What changed
3 new planned wind units totalling 21 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Partially corroborated externally · 3 independent sources
Project corroboration does not establish procurement activity.
External evidence predates registry detection; newly observed does not necessarily mean a new project.
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 3
- Total registered capacity
- 21 MW
- Capacity per unit
- 7 MW each
- First observed in MaStR snapshot
- 22 Oct 2026
- Planned commissioning
- 01 Mar 2030
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
External evidence details
What we found
External verification: Partially corroborated
Some external sources mention a wind development in Vollersode associated with Alterric Deutschland GmbH, but the match to the registered project is incomplete. Public project evidence found as early as 31 Jul 2025; GridGraph first observed the MaStR registration on 22 Oct 2026. No public procurement evidence was found in this verification run.
- Project company
- Alterric Deutschland GmbH
- Developer
- Not identified
- Project evidence
- Partial
- Commercial evidence
- None found
- Windkraft im Kreis Osterholz: Repowering in Vollersode und Lange HeideNews / press report · weser-kurier.de · Published 31 Jul 2025 · medium confidenceSupports: project exists, company identity, location, project stageVerified from page text
- Vollersode (Osterholz, Niedersachsen) | Goal100Web page · goal100.org · Published 22 Oct 2026 · medium confidenceSupports: project exists, location, capacity, unit count, project stageVerified from page text
- Alterric Windpark Vollersode II GmbH & Co. KG, Aurich, Germany, District Court of Aurich HRA 204320: Network, Financial informationCompany record · northdata.com · Publication date unknown · medium confidenceSupports: company identity, locationVerified from page text
- Vollersode (Deutschland) - Windparks - Online-Zugriff - The Wind PowerWeb page · thewindpower.net · Publication date unknown · low confidenceSupports: locationVerified from page text
- Vollersode (Germany) - Wind farms - Online access - The Wind PowerWeb page · thewindpower.net · Publication date unknown · low confidenceSupports: locationVerified from page text
No public procurement evidence was found in this verification run.
3 independent external sources.
Registry lead relevance: 67 → After external verification: 69 (+2) +2: identity or project only partially corroborated.
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Partially corroborated — 3 independent external sources at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Grouping: Likely site group — Shared unit-name pattern (“vollersode ii…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 22 Oct 2026
MaStR unit IDs: SEE900214057633, SEE942310632611, SEE971749016624
Commercial signals (3): cmvl9o34c0fy0wtj8tb8uu0de, cmvl9o34d0fyhwtj8vf3m0w4u, cmvl9o34d0fyjwtj80z2cm291
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“vollersode ii…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (3)
New planned asset69Lead relevance · High
Why this ranks high. Mid-sized 13.6 MW signal, freshly registered planned asset, the registered operator is known and external evidence identifies the project company and corroborates the development, increasing actionability.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance69
- Project scale (MW)13
- Event type20
- Lifecycle stage10
- Recency7
- Operator identified10
- Multi-unit evidence3
- External verification6
Signal materiality34
- Event type20
- MW affected9
- Units affected5
New planned wind development signal — 2 units / 13.6 MW
Ostrach, Baden-Württemberg · Operator: Uhl Windkraft Projektierung GmbH & Co. KG
2 planned units · 13.6 MW · First observed 22 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 01 Sept 2029
What changed
2 new planned wind units totalling 13.6 MW were first observed in this MaStR snapshot.
Why it may matter
A newly registered planned asset may be an early sign of a development worth a quick look.
Evidence
- MaStR evidence: HIGH
- Externally corroborated · 4 independent sources
Project corroboration does not establish procurement activity.
External evidence predates registry detection; newly observed does not necessarily mean a new project.
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 2
- Total registered capacity
- 13.6 MW
- Capacity per unit
- 6.8 MW each
- First observed in MaStR snapshot
- 22 Oct 2026
- Planned commissioning
- 01 Sept 2029
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
External evidence details
What we found
External verification: Corroborated
External sources corroborate a planned wind development in Ostrach associated with Uhl Windkraft Projektierung GmbH & Co. KG. A public source also matches the registered project scale. At least one source refers to planning or permitting. Public project evidence found as early as 7 Mar 2025; GridGraph first observed the MaStR registration on 22 Oct 2026. No public procurement evidence was found in this verification run.
- Project company
- Uhl Windkraft Projektierung GmbH & Co. KG
- Developer
- Not identified
- Project evidence
- Strong
- Commercial evidence
- None found
- Bekanntgabe der Genehmigung des Windparks Ostrach der Firma Uhl Windkraft Projektierung GmbH & Co. KG in Ostrach | Landratsamt SigmaringenPermit document · landkreis-sigmaringen.de · Published 21 Oct 2026 · high confidenceSupports: project exists, company identity, location, unit count, project stageVerified from page text
- Bevölkerung verunsichert: Gemeinde hat bald 32 Windräder um sichNews / press report · schwaebische.de · Published 6 Jan 2026 · medium confidenceSupports: project exists, location, project stage, commissioning timelineVerified from page text
- Windpark Ostrach West | Perigus EnergyWeb page · perigusenergy.de · Published 13 Apr 2026 · medium confidenceSupports: project exists, location, project stageVerified from page text
- WP Ostrach - UHL WINDKRAFT - WindkraftanlageWeb page · uhl-windkraft.de · Published 7 Mar 2025 · medium confidenceSupports: project exists, location, capacity, unit count, project stage, commissioning timelineVerified from page text
- B E S C H E I D :Web page · donau-ries.de · Publication date unknown · low confidenceSupports: company identityPDF · judged from search excerpt only
- UHL WINDKRAFT - Projektentwicklung von WindenergieWeb page · uhl-windkraft.de · Published 16 Jun 2020 · low confidenceSupports: company identityVerified from page textOlder source: weighed lower unless it clearly describes the same ongoing project.
- Uhl Windkraft Projektierung GmbH & Co. KG WID - Windindustrie in DeutschlandWeb page · windindustrie-in-deutschland.de · Publication date unknown · low confidenceSupports: company identityVerified from page text
No public procurement evidence was found in this verification run.
4 independent external sources.
Registry lead relevance: 63 → After external verification: 69 (+6) +6: project corroborated and developer / project company identified by an external source.
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Corroborated — 4 independent external sources at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Grouping: Likely site group — Shared unit-name pattern (“ostrach…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 22 Oct 2026
MaStR unit IDs: SEE924771060363, SEE947421967683
Commercial signals (2): cmvl9o34d0fybwtj8xh67tv8j, cmvl9o34d0fyiwtj834f29f7n
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“ostrach…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (2)
Capacity change66Lead relevance · High
Why this ranks high. Mid-sized 27.2 MW signal, 4 registrations moving together and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance66
- Project scale (MW)16
- Event type14
- Lifecycle stage10
- Recency7
- Operator identified10
- Multi-unit evidence6
- Size of change3
Signal materiality52
- Event type18
- Size of change12
- MW affected12
- Units affected10
Registered wind capacity increased (+4.8 MW) — 4 units / 27.2 MW
Obere Warnow, Mecklenburg-Vorpommern · Operator: KWE Windpark Herzberg Eins GmbH & Co. KG
4 units · 27.2 MW
Wind · Wind turbine (horizontal-axis)
What changed
4 wind units registered a capacity change; combined registered capacity moved from 22.4 MW to 27.2 MW (+4.8 MW).
Why it may matter
A larger registered capacity may indicate a changed project design, turbine or equipment choice, or grid-connection scope, and could affect engineering and equipment requirements.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Design / technologyGrid connectionEngineeringEquipment sizing
Verify next
Design change?Permit & grid documentsDeveloper updates
Facts, hypotheses and how to verify
- Per-unit change
- 4 units changed from 5.6 MW to 6.8 MW each
- Combined registered capacity now
- 27.2 MW
- Combined change
- +4.8 MW (+21%)
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
How to verify
- Check whether the change reflects a design or turbine-model change
- Compare with permit and grid-connection documents
- Look for recent developer announcements
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“herzberg…”); Identical registered capacity; Identical registered change on every unit; Planned/commissioning dates within 72 days of each other
Presentation group: 4 registered MaStR units
Snapshot transition: 21 Oct 2026 → 22 Oct 2026
MaStR unit IDs: SEE914139723900, SEE917552817324, SEE923296331118, SEE928352009284
Commercial signals (4): cmvl9o34d0fy5wtj86ee0cit4, cmvl9o34d0fy7wtj8e0jzc0ey, cmvl9o34d0fy9wtj8dfxta69j, cmvl9o34d0fydwtj8byj5ohmd
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“herzberg…”); Identical registered capacity; Identical registered change on every unit; Planned/commissioning dates within 72 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (4)
Schedule change65Lead relevance · High
Why this ranks high. Mid-sized 26.56 MW signal, unusually large schedule shift (731 days) and the registered operator is known. The grouping evidence is limited; it may still reflect a registry correction rather than a new commercial need.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance65
- Project scale (MW)16
- Event type12
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence3
- Size of change6
Signal materiality63
- Event type16
- Size of change25
- MW affected12
- Units affected10
Commissioning delayed by up to 731 days — 4 units / 26.56 MW
Steinfurt, Nordrhein-Westfalen · Operator: Bürgerwind Wilmsberg GmbH & Co.KG
4 units · 26.56 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 31 Dec 2026
What changed
4 wind units registered a later planned commissioning date (+304 days to +731 days).
Why it may matter
A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 4
- Planned commissioning before
- 31 Dec 2026
- Planned commissioning now
- 31 Oct 2027 – 31 Dec 2028
- Shift per unit
- +304 to +731 days
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Conservative group
Presentation group: 4 registered MaStR units
Snapshot transition: 22 Oct 2026 → 23 Oct 2026
MaStR unit IDs: SEE916376876135, SEE931586687135, SEE934161154367, SEE971728073242
Commercial signals (4): cmvl9o34d0fyqwtj8b3y0bwig, cmvl9o34e0fyvwtj8lj0laqg0, cmvl9o34e0fyxwtj80f8qsvb0, cmvl9o34f0fzbwtj8993feog7
Grouping basisConservative group
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Underlying registrations (4)
Schedule change65Lead relevance · High
Why this ranks high. Mid-sized 22.8 MW signal, 4 registrations moving together and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance65
- Project scale (MW)15
- Event type12
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence6
- Size of change4
Signal materiality52
- Event type16
- Size of change14
- MW affected12
- Units affected10
Commissioning delayed by up to 90 days — 4 units / 22.8 MW
Dalkendorf, Mecklenburg-Vorpommern · Operator: Windpark Dalkendorf GmbH
4 units · 22.8 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: Aug 2026 → Oct 2026 (+90 days)
What changed
4 wind units registered a later planned commissioning date (+90 days).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 4
- Planned commissioning (same for every unit)
- Aug 2026 → Oct 2026 (+90 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 4 registered MaStR units
Snapshot transition: 22 Oct 2026 → 23 Oct 2026
MaStR unit IDs: SEE920017158818, SEE961679364339, SEE968077464456, SEE982058963059
Commercial signals (4): cmvl9o34e0fyrwtj8mvsimbst, cmvl9o34e0fz8wtj8n28hn2on, cmvl9o34e0fz9wtj8dlv88wnv, cmvl9o34f0fzewtj8235etyd2
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (4)
Operator change64Lead relevance · High
Why this ranks high. Mid-sized 28.8 MW signal, 4 registrations moving together and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance64
- Project scale (MW)17
- Event type13
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence6
Signal materiality37
- Event type14
- MW affected13
- Units affected10
Registered operator changed on 4 wind units — 4 units / 28.8 MW
Garrel, Niedersachsen · Operator: Bürger-Energiepark Garrel - Letherfeld GmbH & Co. KG
4 units · 28.8 MW
Wind · Wind turbine (horizontal-axis)
What changed
The registered operator changed on 4 wind units.
Why it may matter
A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Asset transactionsFinancingDue diligenceDeveloper intelligence
Verify next
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
- Units with an operator change
- 4
- Previous registered operator
- VR Bürger-Windpark in Südoldenburg GmbH
- New registered operator
- Bürger-Energiepark Garrel - Letherfeld GmbH & Co. KG
- Project development or development-management services
- Asset or company transaction advisory and technical due diligence
- Financing or refinancing discussions
How to verify
- Look up the new registered operator in the commercial register (Handelsregister)
- Check whether the previous and new operators are related entities
- Search for announcements of a sale, financing or restructuring
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 4 registered MaStR units
Snapshot transition: 22 Oct 2026 → 23 Oct 2026
MaStR unit IDs: SEE913155586940, SEE941125986285, SEE957885797047, SEE987475751678
Commercial signals (4): cmvl9o34d0fyowtj8b1ue22tq, cmvl9o34e0fz0wtj8wxek6447, cmvl9o34e0fz5wtj8k1e2vgzr, cmvl9o34f0fzgwtj82f4qn7hv
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (4)