Intelligence brief

German Energy Asset Change Intelligence — 2026-10-02

A curated, source-traceable view of registered MaStR asset updates.

Coverage: 01 Oct → 02 Oct 2026Latest MaStR snapshot: 2 Oct 2026Snapshots compared: 2

Covers one snapshot-to-snapshot transition. Do not compare its counts with weekly or multi-day reports.

Source coverageLatest MaStR snapshot: 2 Oct 2026Brief generated: 2 Oct 2026
8Top opportunities shown
The diversified selection shown in the Top section. 33 grouped events score above the investigation threshold in total. A registry signal only: it does not establish procurement activity or buyer intent.
26New development signals
3Major schedule shifts
6Operator changes
2Commissioning events
474.03 MWNewly planned capacity

37 grouped events (units merged into likely site groups; not confirmed projects). Unit-level records: 91 registry changes across 89 registrations, 556.21 MW registered capacity.

Start here

  1. 75New planned wind development signal — 8 units / 56 MW · Treuenbrietzen, Brandenburg
  2. 73New planned wind development signal — 13 units / 88.4 MW · Rastede, Niedersachsen
  3. 71New planned wind development signal — 5 units / 30 MW · Bütow, Mecklenburg-Vorpommern
  4. 71New planned wind development signal — 4 units / 28 MW · Lehrte, Niedersachsen
  5. 59Commissioning delayed by up to 273 days — 2 units / 10.26 MW · Ostbevern, Nordrhein-Westfalen

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

Top opportunities to investigate (8)

Selected from the highest-scoring investigation signals, with category diversification to avoid repetitive results. Cards are ordered by opportunity score; a higher-scoring signal of an already well-represented type may appear in a section below. Scores are deterministic and are not probabilities. Everything here is a starting point for verification, not evidence of demand.

New planned asset
75Lead relevance · Very high

Why this ranks high. Large 56 MW multi-unit signal, 8 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance75

  • Project scale (MW)20
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence7

Signal materiality48

  • Event type20
  • MW affected15
  • Units affected13

New planned wind development signal — 8 units / 56 MW

Treuenbrietzen, Brandenburg · Operator: Energiequelle GmbH

8 planned units · 56 MW · First observed 02 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Dec 2029

8 new planned wind units totalling 56 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
8
Total registered capacity
56 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
02 Oct 2026
Planned commissioning
31 Dec 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wp feldheim xii…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 8 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE994221717048, SEE952310374565, SEE953800515864, SEE974552958563, SEE912719693315, SEE920948557407, SEE928119608217, SEE945995734885
Commercial signals (8): cmuqgo2wk1uv7wtj4c9a5qlth, cmuqgo2wn1ux0wtj4lny8znrn, cmuqgo2wn1ux1wtj4ww7dj0m1, cmuqgo2wn1uxhwtj4etdpg9pg, cmuqgo2wk1uvqwtj4wo6mu8l4, cmuqgo2wl1uw0wtj46ghfhyk9, cmuqgo2wl1uw6wtj4dft4wvkx, cmuqgo2wm1uwtwtj4noll05nw

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp feldheim xii…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
73Lead relevance · High

Why this ranks high. Large 88.4 MW multi-unit signal, 13 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance73

  • Project scale (MW)22
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence9

Signal materiality52

  • Event type20
  • MW affected17
  • Units affected15

New planned wind development signal — 13 units / 88.4 MW

Rastede, Niedersachsen · Operator: Registered operator name not resolved

13 planned units · 88.4 MW · First observed 02 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Sept 2029

13 new planned wind units totalling 88.4 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
13
Total registered capacity
88.4 MW
Capacity per unit
6.8 MW each
First observed in MaStR snapshot
02 Oct 2026
Planned commissioning
01 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 13 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE904714566640, SEE906644703980, SEE952053028992, SEE994401475881, SEE965214405877, SEE976830951334, SEE979975268213, SEE915799093624, SEE917665435774, SEE929883397901, SEE932554061698, SEE936407895621, SEE999706154080
Commercial signals (13): cmuqgo2wk1uvkwtj41eb8afls, cmuqgo2wk1uvlwtj4eb3lsz8o, cmuqgo2wn1uwzwtj4280jpb6c, cmuqgo2wk1uv6wtj4np3t2k5i, cmuqgo2wn1ux9wtj42ghkhlzh, cmuqgo2wn1uxiwtj41yxgld2q, cmuqgo2wn1uxkwtj4jdsp7s7o, cmuqgo2wk1uvswtj4o39f25nr, cmuqgo2wl1uvwwtj47c6ud3e5, cmuqgo2wl1uw8wtj4mcojh4j6, cmuqgo2wl1uwbwtj47ytqfsns, cmuqgo2wm1uwgwtj4tuvnpk6l, cmuqgo2wj1uv3wtj4070vs5lc

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
71Lead relevance · High

Why this ranks high. Mid-sized 30 MW signal, 5 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance71

  • Project scale (MW)17
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality44

  • Event type20
  • MW affected13
  • Units affected11

New planned wind development signal — 5 units / 30 MW

Bütow, Mecklenburg-Vorpommern · Operator: ENERTRAG SE

5 planned units · 30 MW · First observed 02 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Nov 2029

5 new planned wind units totalling 30 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
5
Total registered capacity
30 MW
Capacity per unit
6 MW each
First observed in MaStR snapshot
02 Oct 2026
Planned commissioning
01 Nov 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“i im sühring…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 5 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE902157348892, SEE903908174463, SEE994831742102, SEE943315771398, SEE949641022623
Commercial signals (5): cmuqgo2wk1uviwtj48tnl47v7, cmuqgo2wk1uvjwtj4rpmd2vwn, cmuqgo2wj1uv5wtj45z4fc2nk, cmuqgo2wm1uwowtj47thmwb8t, cmuqgo2wn1uwywtj4rhehe5kn

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“i im sühring…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
71Lead relevance · High

Why this ranks high. Mid-sized 28 MW signal, 4 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance71

  • Project scale (MW)17
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality42

  • Event type20
  • MW affected12
  • Units affected10

New planned wind development signal — 4 units / 28 MW

Lehrte, Niedersachsen · Operator: enercity Erneuerbare Projekte GmbH & Co. KG

4 planned units · 28 MW · First observed 02 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Jan 2029

4 new planned wind units totalling 28 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
4
Total registered capacity
28 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
02 Oct 2026
Planned commissioning
01 Jan 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“lehrte ahlten…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 4 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE966676642596, SEE914361899367, SEE921357648243, SEE940505005929
Commercial signals (4): cmuqgo2wn1uxcwtj479dndycg, cmuqgo2wk1uvrwtj47iwjer9y, cmuqgo2wl1uw2wtj4i3oytygx, cmuqgo2wm1uwmwtj4wfdgphh4

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“lehrte ahlten…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
59Lead relevance · Moderate

Why this ranks here. Unusually large schedule shift (273 days) and the registered operator is known. Small combined capacity (10.26 MW); it may still reflect a registry correction rather than a new commercial need; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance59

  • Project scale (MW)11
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3
  • Size of change5

Signal materiality49

  • Event type16
  • Size of change20
  • MW affected8
  • Units affected5

Commissioning delayed by up to 273 days — 2 units / 10.26 MW

Ostbevern, Nordrhein-Westfalen · Operator: Windkraft Schirl Frankenbach GmbH & Co. KG

2 units · 10.26 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Jan 2027 → Oct 2027 (+273 days)

2 wind units registered a later planned commissioning date (+273 days).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
2
Planned commissioning (same for every unit)
Jan 2027 → Oct 2027 (+273 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“frankenbach…”); Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 1 Oct 2026 → 2 Oct 2026
MaStR unit IDs: SEE946654522126, SEE909697172048
Commercial signals (2): cmuqgo2wm1uwuwtj4raau6d17, cmuqgo2wk1uvnwtj4icqdbo3u

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“frankenbach…”); Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Multiple changes
55Lead relevance · Moderate

Why this ranks here. Operator and commissioning changes recorded together on the same units and the registered operator is known. Small combined capacity (12.6 MW); no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance55

  • Project scale (MW)12
  • Event type13
  • Lifecycle stage4
  • Recency8
  • Operator identified10
  • Multi-unit evidence3
  • Several changes together5

Signal materiality34

  • Event type14
  • MW affected9
  • Units affected5
  • Several changes together6

Multiple registry changes (operator + commissioning) — 2 units / 12.6 MW

Alpen, Nordrhein-Westfalen · Operator: SL Windpark Alpen Veen GmbH & Co. KG

2 units · 12.6 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 2 wind units. 2 wind units (12.6 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 29 Sept 2026.

Several registry changes were recorded together on the same units. That may indicate a substantive update to the project rather than a routine correction, and is worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligenceO&M
Company registerSale / restructuring newsRelated entities?MaStR record
Facts, hypotheses and how to verify
Units with an operator change
2
Previous registered operator
SL Windenergie GmbH
New registered operator
SL Windpark Alpen Veen GmbH & Co. KG
Units commissioned
2
Total registered capacity
12.6 MW
Commissioning date
29 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Confirm operating status and commissioning date in the official MaStR record
  • Check whether the previous and new operators are related entities
  • Identify the operating company and public information on service arrangements
  • Search for announcements of a sale, financing or restructuring
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 1 Oct 2026 → 2 Oct 2026
MaStR unit IDs: SEE989128748240, SEE966040095652
Commercial signals (4): cmuqgo2wk1uvdwtj4ssb44e7g, cmuqgo2wk1uvewtj4znhibyuu, cmuqgo2wn1uxbwtj4p58vj685, cmuqgo2wn1uxawtj44qfd6sua

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
54Lead relevance · Moderate

Why this ranks here. The registered operator is known. Small combined capacity (12.4 MW); no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance54

  • Project scale (MW)12
  • Event type8
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3
  • Size of change3

Signal materiality43

  • Event type16
  • Size of change13
  • MW affected9
  • Units affected5

Commissioning delayed by up to 73 days — 2 units / 12.4 MW

Prezelle, Niedersachsen · Operator: Windpark Prezelle-Süd GmbH & Co. KG

2 units · 12.4 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Nov 2026 → Feb 2027 (+73 days)

2 wind units registered a later planned commissioning date (+73 days).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
2
Planned commissioning (same for every unit)
Nov 2026 → Feb 2027 (+73 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 1 Oct 2026 → 2 Oct 2026
MaStR unit IDs: SEE930285963069, SEE908418372101
Commercial signals (2): cmuqgo2wl1uw9wtj4gqe8da92, cmuqgo2wk1uvmwtj4zedu43rn

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Operator change
49Lead relevance · Moderate

Why this ranks here. The registered operator is known. It affects only one 6.2 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance49

  • Project scale (MW)8
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality21

  • Event type14
  • MW affected7

Registered operator changed on a wind unit — 6.2 MW

Kuhs, Mecklenburg-Vorpommern · Operator: WEB Windpark Kuhs GmbH & Co. KG

1 unit · 6.2 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 1 wind unit.

A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligence
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Previous registered operator
mbb Bredentin 2 GmbH & Co. KG
New registered operator
WEB Windpark Kuhs GmbH & Co. KG
  • Project development or development-management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Oct 2026 → 2 Oct 2026
MaStR unit IDs: SEE942275739790
Commercial signals (1): cmuqgo2wm1uwnwtj4wygra7b7

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

New developments (12)

New planned asset
71Lead relevance · High

Why this ranks high. Mid-sized 28 MW signal, 4 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance71

  • Project scale (MW)17
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality42

  • Event type20
  • MW affected12
  • Units affected10

New planned wind development signal — 4 units / 28 MW

Waldfeucht, Nordrhein-Westfalen · Operator: BMR energy solutions GmbH

4 planned units · 28 MW · First observed 02 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Sept – 25 Sept 2028

4 new planned wind units totalling 28 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
4
Total registered capacity
28 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
02 Oct 2026
Planned commissioning between
01 Sept – 25 Sept 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Planned/commissioning dates within 24 days of each other
Presentation group: 4 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE996722487390, SEE981599778290, SEE932375784981, SEE934060507271
Commercial signals (4): cmuqgo2wj1uv4wtj4yfa5tz3v, cmuqgo2wn1uxlwtj4yai8oocz, cmuqgo2wl1uwawtj4ye3g7bif, cmuqgo2wl1uwdwtj4xydgdgyb

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Planned/commissioning dates within 24 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
68Lead relevance · High

Why this ranks high. Mid-sized 42 MW signal, 6 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance68

  • Project scale (MW)19
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence7

Signal materiality46

  • Event type20
  • MW affected14
  • Units affected12

New planned wind development signal — 6 units / 42 MW

Wielen, Niedersachsen · Operator: Registered operator name not resolved

6 planned units · 42 MW · First observed 02 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Mar 2028

6 new planned wind units totalling 42 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
6
Total registered capacity
42 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
02 Oct 2026
Planned commissioning
31 Mar 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wielen…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 6 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE980230459451, SEE964179620547, SEE917630343967, SEE920022731310, SEE921077129367, SEE945849327812
Commercial signals (6): cmuqgo2wk1uvgwtj4bww3im9a, cmuqgo2wn1ux7wtj4hnpw10xr, cmuqgo2wl1uvvwtj4lhm9nosd, cmuqgo2wl1uvzwtj4ctwwx8kw, cmuqgo2wl1uw1wtj4di67bfg8, cmuqgo2wm1uwswtj4hgccvijt

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wielen…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
67Lead relevance · High

Why this ranks high. Mid-sized 18.12 MW signal, 3 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance67

  • Project scale (MW)14
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind development signal — 3 units / 18.12 MW

Röttingen, Bayern · Operator: enerlogo GmbH & Co. KG

3 planned units · 18.12 MW · First observed 02 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Mar 2028

3 new planned wind units totalling 18.12 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
18.12 MW
Capacity per unit
5.56–7 MW per unit
First observed in MaStR snapshot
02 Oct 2026
Planned commissioning
31 Mar 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“windpark strüth wea…”); Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE961780714788, SEE923466424220, SEE939404285716
Commercial signals (3): cmuqgo2wn1ux6wtj4bmfy1zc9, cmuqgo2wl1uw5wtj43zndl9k7, cmuqgo2wm1uwjwtj4c2c4p2qx

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“windpark strüth wea…”); Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
64Lead relevance · High

Why this ranks high. 3 registrations moving together, freshly registered planned asset and the registered operator is known. Small combined capacity (10.35 MW).

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance64

  • Project scale (MW)11
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5

Signal materiality36

  • Event type20
  • MW affected8
  • Units affected8

New planned wind development signal — 3 units / 10.35 MW

Fürstenwalde/Spree, Brandenburg · Operator: MLK Brandenburg Windpark Entwicklungs GmbH & Co. KG

3 planned units · 10.35 MW · First observed 02 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Dec 2026 – 31 Dec 2028

3 new planned wind units totalling 10.35 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
10.35 MW
Capacity per unit
3.45 MW each
First observed in MaStR snapshot
02 Oct 2026
Planned commissioning between
31 Dec 2026 – 31 Dec 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“w wp palmnicken…”); Identical registered capacity
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE945006347301, SEE910620870788, SEE901037716912
Commercial signals (3): cmuqgo2wm1uwpwtj45y7eibuw, cmuqgo2wk1uvpwtj45udxb5si, cmuqgo2wk1uvhwtj495pp167q

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“w wp palmnicken…”); Identical registered capacity
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
63Lead relevance · High

Why this ranks high. Freshly registered planned asset and the registered operator is known. Small combined capacity (12 MW).

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance63

  • Project scale (MW)12
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3

Signal materiality34

  • Event type20
  • MW affected9
  • Units affected5

New planned wind development signal — 2 units / 12 MW

Rehna, Mecklenburg-Vorpommern · Operator: KNE Windpark Nr. 17 GmbH & Co. KG

2 planned units · 12 MW · First observed 02 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Oct 2029

2 new planned wind units totalling 12 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
12 MW
Capacity per unit
6 MW each
First observed in MaStR snapshot
02 Oct 2026
Planned commissioning
01 Oct 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE954780137497, SEE928866509119
Commercial signals (2): cmuqgo2wn1ux4wtj4aa0tkdbs, cmuqgo2wl1uw7wtj43elfsxcj

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
62Lead relevance · High

Why this ranks high. Freshly registered planned asset and the registered operator is known. Small combined capacity (11.56 MW); the grouping evidence is limited.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance62

  • Project scale (MW)12
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence2

Signal materiality34

  • Event type20
  • MW affected9
  • Units affected5

New planned wind units — 2 units / 11.56 MW

Büren, Nordrhein-Westfalen · Operator: Wewelsburger Windenergie GmbH & Co. KG

2 planned units · 11.56 MW · First observed 02 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 28 Sept 2030

2 new planned wind units totalling 11.56 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
11.56 MW
Capacity per unit
5.56–6 MW per unit
First observed in MaStR snapshot
02 Oct 2026
Planned commissioning
28 Sept 2030
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Conservative group — Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE953863479905, SEE978828543033
Commercial signals (2): cmuqgo2wn1ux2wtj4bxjmcsvk, cmuqgo2wn1uxjwtj4q020totp

Grouping basisConservative group
Supporting registry evidence: Same planned/commissioning date on every unit
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
61Lead relevance · High

Why this ranks high. Mid-sized 16.8 MW signal, 3 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance61

  • Project scale (MW)14
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence5

Signal materiality38

  • Event type20
  • MW affected10
  • Units affected8

New planned wind development signal — 3 units / 16.8 MW

Emmendorf, Niedersachsen · Operator: Registered operator name not resolved

3 planned units · 16.8 MW · First observed 02 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 02 Mar 2030

3 new planned wind units totalling 16.8 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
16.8 MW
Capacity per unit
5.6 MW each
First observed in MaStR snapshot
02 Oct 2026
Planned commissioning
02 Mar 2030
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“hy hoystorf…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE990733332908, SEE909875564245, SEE919254006778
Commercial signals (3): cmuqgo2wk1uvawtj4adnf6f9a, cmuqgo2wk1uvowtj49lg6xv4f, cmuqgo2wl1uvywtj46oitmge4

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“hy hoystorf…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
58Lead relevance · Moderate

Why this ranks here. Mid-sized 14.4 MW signal and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance58

  • Project scale (MW)13
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence3

Signal materiality35

  • Event type20
  • MW affected10
  • Units affected5

New planned wind development signal — 2 units / 14.4 MW

Wildeshausen, Niedersachsen · Operator: Registered operator name not resolved

2 planned units · 14.4 MW · First observed 02 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 13 Jul 2029

2 new planned wind units totalling 14.4 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
14.4 MW
Capacity per unit
7.2 MW each
First observed in MaStR snapshot
02 Oct 2026
Planned commissioning
13 Jul 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wea kleinenkneten…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE917527349737, SEE922289968935
Commercial signals (2): cmuqgo2wl1uvuwtj4fankgoln, cmuqgo2wl1uw4wtj4b8ehub2r

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wea kleinenkneten…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
58Lead relevance · Moderate

Why this ranks here. Mid-sized 14 MW signal and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance58

  • Project scale (MW)13
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence3

Signal materiality34

  • Event type20
  • MW affected9
  • Units affected5

New planned wind development signal — 2 units / 14 MW

Barnstorf, Niedersachsen · Operator: Registered operator name not resolved

2 planned units · 14 MW · First observed 02 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Sept 2029

2 new planned wind units totalling 14 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
14 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
02 Oct 2026
Planned commissioning
30 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wp aldorf…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE989593942730, SEE947890542817
Commercial signals (2): cmuqgo2wk1uvcwtj41si729p4, cmuqgo2wm1uwwwtj4hwpuzkh2

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp aldorf…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
58Lead relevance · Moderate

Why this ranks here. Mid-sized 14 MW signal and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance58

  • Project scale (MW)13
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence3

Signal materiality34

  • Event type20
  • MW affected9
  • Units affected5

New planned wind development signal — 2 units / 14 MW

Hehlen, Niedersachsen · Operator: Registered operator name not resolved

2 planned units · 14 MW · First observed 02 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Dec 2028

2 new planned wind units totalling 14 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
14 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
02 Oct 2026
Planned commissioning
31 Dec 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE961157713871, SEE938413537212
Commercial signals (2): cmuqgo2wn1ux5wtj4a0ds4wxp, cmuqgo2wm1uwiwtj4rtvyw0x3

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
58Lead relevance · Moderate

Why this ranks here. Mid-sized 14 MW signal and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance58

  • Project scale (MW)13
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence3

Signal materiality34

  • Event type20
  • MW affected9
  • Units affected5

New planned wind development signal — 2 units / 14 MW

Hünxe, Nordrhein-Westfalen · Operator: Registered operator name not resolved

2 planned units · 14 MW · First observed 02 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Dec 2028

2 new planned wind units totalling 14 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
14 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
02 Oct 2026
Planned commissioning
01 Dec 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE954154374251, SEE985195152904
Commercial signals (2): cmuqgo2wn1ux3wtj43g50udnr, cmuqgo2wm1uwkwtj4fslfkwdc

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
58Lead relevance · Moderate

Why this ranks here. Mid-sized 13.6 MW signal and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance58

  • Project scale (MW)13
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence3

Signal materiality34

  • Event type20
  • MW affected9
  • Units affected5

New planned wind development signal — 2 units / 13.6 MW

Grevesmühlen, Mecklenburg-Vorpommern · Operator: Registered operator name not resolved

2 planned units · 13.6 MW · First observed 02 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 29 Sept 2031

2 new planned wind units totalling 13.6 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
13.6 MW
Capacity per unit
6.8 MW each
First observed in MaStR snapshot
02 Oct 2026
Planned commissioning
29 Sept 2031
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE988583929515, SEE921438294345
Commercial signals (2): cmuqgo2wk1uvfwtj4ydrk0sxk, cmuqgo2wl1uw3wtj4q6xtm4pi

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
↑ Back to top

Major schedule changes (1)

Schedule change
46Lead relevance · Moderate

Why this ranks here. The registered operator is known. It affects only one 4.8 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance46

  • Project scale (MW)7
  • Event type8
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change3

Signal materiality33

  • Event type16
  • Size of change11
  • MW affected6

Commissioning delayed by 49 days — 4.8 MW

Landscheide, Schleswig-Holstein · Operator: LS Repowering GmbH & Co. KG

1 unit · 4.8 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 12 Sept 2026 → 31 Oct 2026 (+49 days)

The registered planned commissioning date moved by +49 days (12 Sept 2026 → 31 Oct 2026).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Planned commissioning
12 Sept 2026 → 31 Oct 2026 (+49 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Oct 2026 → 2 Oct 2026
MaStR unit IDs: SEE945243133132
Commercial signals (1): cmuqgo2wm1uwqwtj4s6ewlgd5

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Operator / company changes (4)

Operator change
49Lead relevance · Moderate

Why this ranks here. The registered operator is known. It affects only one 6.2 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance49

  • Project scale (MW)8
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality21

  • Event type14
  • MW affected7

Registered operator changed on a wind unit — 6.2 MW

Mistorf, Mecklenburg-Vorpommern · Operator: mbb Bredentin GmbH & Co. KG

1 unit · 6.2 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 1 wind unit.

A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligence
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Previous registered operator
mbb Bredentin 2 GmbH & Co. KG
New registered operator
mbb Bredentin GmbH & Co. KG
  • Project development or development-management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Oct 2026 → 2 Oct 2026
MaStR unit IDs: SEE990352753634
Commercial signals (1): cmuqgo2wk1uvbwtj46hmyyb90

Grouping basisSingle unit
A single MaStR registration.
Operator change
43Lead relevance · Low

Why this ranks here. Operator identity is unresolved, which reduces immediate actionability; it affects only one 6 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance43

  • Project scale (MW)8
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified4

Signal materiality21

  • Event type14
  • MW affected7

Registered operator changed on a wind unit — 6 MW

Welschbillig, Rheinland-Pfalz · Operator: Registered operator name not resolved

1 unit · 6 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 1 wind unit.

A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligence
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Previous registered operator
PNE AG
New registered operator
Operator ID ABR975388322429 (name not resolved)
  • Project development or development-management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Oct 2026 → 2 Oct 2026
MaStR unit IDs: SEE918050880247
Commercial signals (1): cmuqgo2wl1uvxwtj4ruuf6ng9

Grouping basisSingle unit
A single MaStR registration.
Operator change
42Lead relevance · Low

Why this ranks here. Operator identity is unresolved, which reduces immediate actionability; it affects only one 4.26 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance42

  • Project scale (MW)7
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified4

Signal materiality20

  • Event type14
  • MW affected6

Registered operator changed on a wind unit — 4.26 MW

Barnin, Mecklenburg-Vorpommern · Operator: Registered operator name not resolved

1 unit · 4.26 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 1 wind unit.

A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligence
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Previous registered operator
Energieallianz MV Projekt Nr. 11 GmbH & Co. KG
New registered operator
Operator ID ABR915473779028 (name not resolved)
  • Project development or development-management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Oct 2026 → 2 Oct 2026
MaStR unit IDs: SEE934496244849
Commercial signals (1): cmuqgo2wl1uwewtj4nnlm3qz2

Grouping basisSingle unit
A single MaStR registration.
Operator change
42Lead relevance · Low

Why this ranks here. Operator identity is unresolved, which reduces immediate actionability; it affects only one 4.26 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance42

  • Project scale (MW)7
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified4

Signal materiality20

  • Event type14
  • MW affected6

Registered operator changed on a wind unit — 4.26 MW

Zapel, Mecklenburg-Vorpommern · Operator: Registered operator name not resolved

1 unit · 4.26 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 1 wind unit.

A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligence
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Previous registered operator
Energieallianz MV Projekt Nr. 11 GmbH & Co. KG
New registered operator
Operator ID ABR953050223816 (name not resolved)
  • Project development or development-management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Oct 2026 → 2 Oct 2026
MaStR unit IDs: SEE945315218859
Commercial signals (1): cmuqgo2wm1uwrwtj4ncgxut9i

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Recently commissioned assets (1)

Commissioned asset
36Lead relevance · Low

Why this ranks here. The registered operator is known. It affects only one 7 MW unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance36

  • Project scale (MW)9
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality19

  • Event type12
  • MW affected7

Wind unit commissioned — 7 MW

Berne, Niedersachsen · Operator: Windpark Bäke Buttel GmbH & Co. KG

1 unit · 7 MW

Wind · Wind turbine (horizontal-axis)

1 wind unit (7 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 01 Oct 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
7 MW
Commissioning date
01 Oct 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 1 Oct 2026 → 2 Oct 2026
MaStR unit IDs: SEE947875240271
Commercial signals (1): cmuqgo2wm1uwvwtj4j7b9klcd

Grouping basisSingle unit
Stable MaStR location ID: SEL905308951606
A single MaStR registration.
↑ Back to top

Other registry changes (1)

Smaller registry changes, listed for completeness.

Schedule change
47Lead relevance · Moderate

Why this ranks here. The registered operator is known. Small combined capacity (8.2 MW); short date shifts are common registry maintenance; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance47

  • Project scale (MW)10
  • Event type4
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3
  • Size of change2

Signal materiality34

  • Event type16
  • Size of change6
  • MW affected7
  • Units affected5

Commissioning delayed by up to 19 days — 2 units / 8.2 MW

Uelvesbüll, Schleswig-Holstein · Operator: Windpark Barneckemoor GmbH & Co.KG

2 units · 8.2 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Sept 2026 → 19 Oct 2026 (+19 days)

2 wind units registered a later planned commissioning date (+19 days).

A short date shift is common and may be routine registry maintenance. Worth attention mainly if it is part of a wider pattern.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
2
Planned commissioning (same for every unit)
30 Sept 2026 → 19 Oct 2026 (+19 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“vensys…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 1 Oct 2026 → 2 Oct 2026
MaStR unit IDs: SEE964322441661, SEE949406884497
Commercial signals (2): cmuqgo2wn1ux8wtj4dh3vkjhs, cmuqgo2wm1uwxwtj4us9efsfi

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“vensys…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.