New planned asset71Lead relevance · High
Why this ranks high. Mid-sized 28 MW signal, 4 registrations moving together, freshly registered planned asset and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance71
- Project scale (MW)17
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence6
Signal materiality42
- Event type20
- MW affected12
- Units affected10
New planned wind development signal — 4 units / 28 MW
Waldfeucht, Nordrhein-Westfalen · Operator: BMR energy solutions GmbH
4 planned units · 28 MW · First observed 02 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 01 Sept – 25 Sept 2028
What changed
4 new planned wind units totalling 28 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 4
- Total registered capacity
- 28 MW
- Capacity per unit
- 7 MW each
- First observed in MaStR snapshot
- 02 Oct 2026
- Planned commissioning between
- 01 Sept – 25 Sept 2028
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Planned/commissioning dates within 24 days of each other
Presentation group: 4 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE996722487390, SEE981599778290, SEE932375784981, SEE934060507271
Commercial signals (4): cmuqgo2wj1uv4wtj4yfa5tz3v, cmuqgo2wn1uxlwtj4yai8oocz, cmuqgo2wl1uwawtj4ye3g7bif, cmuqgo2wl1uwdwtj4xydgdgyb
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Planned/commissioning dates within 24 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (4)
New planned asset68Lead relevance · High
Why this ranks high. Mid-sized 42 MW signal, 6 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance68
- Project scale (MW)19
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified4
- Multi-unit evidence7
Signal materiality46
- Event type20
- MW affected14
- Units affected12
New planned wind development signal — 6 units / 42 MW
Wielen, Niedersachsen · Operator: Registered operator name not resolved
6 planned units · 42 MW · First observed 02 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 31 Mar 2028
What changed
6 new planned wind units totalling 42 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 6
- Total registered capacity
- 42 MW
- Capacity per unit
- 7 MW each
- First observed in MaStR snapshot
- 02 Oct 2026
- Planned commissioning
- 31 Mar 2028
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wielen…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 6 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE980230459451, SEE964179620547, SEE917630343967, SEE920022731310, SEE921077129367, SEE945849327812
Commercial signals (6): cmuqgo2wk1uvgwtj4bww3im9a, cmuqgo2wn1ux7wtj4hnpw10xr, cmuqgo2wl1uvvwtj4lhm9nosd, cmuqgo2wl1uvzwtj4ctwwx8kw, cmuqgo2wl1uw1wtj4di67bfg8, cmuqgo2wm1uwswtj4hgccvijt
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wielen…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (6)
New planned asset67Lead relevance · High
Why this ranks high. Mid-sized 18.12 MW signal, 3 registrations moving together, freshly registered planned asset and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance67
- Project scale (MW)14
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence5
Signal materiality39
- Event type20
- MW affected11
- Units affected8
New planned wind development signal — 3 units / 18.12 MW
Röttingen, Bayern · Operator: enerlogo GmbH & Co. KG
3 planned units · 18.12 MW · First observed 02 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 31 Mar 2028
What changed
3 new planned wind units totalling 18.12 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 3
- Total registered capacity
- 18.12 MW
- Capacity per unit
- 5.56–7 MW per unit
- First observed in MaStR snapshot
- 02 Oct 2026
- Planned commissioning
- 31 Mar 2028
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“windpark strüth wea…”); Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE961780714788, SEE923466424220, SEE939404285716
Commercial signals (3): cmuqgo2wn1ux6wtj4bmfy1zc9, cmuqgo2wl1uw5wtj43zndl9k7, cmuqgo2wm1uwjwtj4c2c4p2qx
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“windpark strüth wea…”); Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (3)
New planned asset64Lead relevance · High
Why this ranks high. 3 registrations moving together, freshly registered planned asset and the registered operator is known. Small combined capacity (10.35 MW).
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance64
- Project scale (MW)11
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence5
Signal materiality36
- Event type20
- MW affected8
- Units affected8
New planned wind development signal — 3 units / 10.35 MW
Fürstenwalde/Spree, Brandenburg · Operator: MLK Brandenburg Windpark Entwicklungs GmbH & Co. KG
3 planned units · 10.35 MW · First observed 02 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 31 Dec 2026 – 31 Dec 2028
What changed
3 new planned wind units totalling 10.35 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 3
- Total registered capacity
- 10.35 MW
- Capacity per unit
- 3.45 MW each
- First observed in MaStR snapshot
- 02 Oct 2026
- Planned commissioning between
- 31 Dec 2026 – 31 Dec 2028
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“w wp palmnicken…”); Identical registered capacity
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE945006347301, SEE910620870788, SEE901037716912
Commercial signals (3): cmuqgo2wm1uwpwtj45y7eibuw, cmuqgo2wk1uvpwtj45udxb5si, cmuqgo2wk1uvhwtj495pp167q
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“w wp palmnicken…”); Identical registered capacity
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (3)
New planned asset63Lead relevance · High
Why this ranks high. Freshly registered planned asset and the registered operator is known. Small combined capacity (12 MW).
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance63
- Project scale (MW)12
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence3
Signal materiality34
- Event type20
- MW affected9
- Units affected5
New planned wind development signal — 2 units / 12 MW
Rehna, Mecklenburg-Vorpommern · Operator: KNE Windpark Nr. 17 GmbH & Co. KG
2 planned units · 12 MW · First observed 02 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 01 Oct 2029
What changed
2 new planned wind units totalling 12 MW were first observed in this MaStR snapshot.
Why it may matter
A newly registered planned asset may be an early sign of a development worth a quick look.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 2
- Total registered capacity
- 12 MW
- Capacity per unit
- 6 MW each
- First observed in MaStR snapshot
- 02 Oct 2026
- Planned commissioning
- 01 Oct 2029
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE954780137497, SEE928866509119
Commercial signals (2): cmuqgo2wn1ux4wtj4aa0tkdbs, cmuqgo2wl1uw7wtj43elfsxcj
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (2)
New planned asset62Lead relevance · High
Why this ranks high. Freshly registered planned asset and the registered operator is known. Small combined capacity (11.56 MW); the grouping evidence is limited.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance62
- Project scale (MW)12
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence2
Signal materiality34
- Event type20
- MW affected9
- Units affected5
New planned wind units — 2 units / 11.56 MW
Büren, Nordrhein-Westfalen · Operator: Wewelsburger Windenergie GmbH & Co. KG
2 planned units · 11.56 MW · First observed 02 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 28 Sept 2030
What changed
2 new planned wind units totalling 11.56 MW were first observed in this MaStR snapshot.
Why it may matter
A newly registered planned asset may be an early sign of a development worth a quick look.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 2
- Total registered capacity
- 11.56 MW
- Capacity per unit
- 5.56–6 MW per unit
- First observed in MaStR snapshot
- 02 Oct 2026
- Planned commissioning
- 28 Sept 2030
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Conservative group — Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE953863479905, SEE978828543033
Commercial signals (2): cmuqgo2wn1ux2wtj4bxjmcsvk, cmuqgo2wn1uxjwtj4q020totp
Grouping basisConservative group
Supporting registry evidence: Same planned/commissioning date on every unit
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Underlying registrations (2)
New planned asset61Lead relevance · High
Why this ranks high. Mid-sized 16.8 MW signal, 3 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance61
- Project scale (MW)14
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified4
- Multi-unit evidence5
Signal materiality38
- Event type20
- MW affected10
- Units affected8
New planned wind development signal — 3 units / 16.8 MW
Emmendorf, Niedersachsen · Operator: Registered operator name not resolved
3 planned units · 16.8 MW · First observed 02 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 02 Mar 2030
What changed
3 new planned wind units totalling 16.8 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 3
- Total registered capacity
- 16.8 MW
- Capacity per unit
- 5.6 MW each
- First observed in MaStR snapshot
- 02 Oct 2026
- Planned commissioning
- 02 Mar 2030
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“hy hoystorf…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE990733332908, SEE909875564245, SEE919254006778
Commercial signals (3): cmuqgo2wk1uvawtj4adnf6f9a, cmuqgo2wk1uvowtj49lg6xv4f, cmuqgo2wl1uvywtj46oitmge4
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“hy hoystorf…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (3)
New planned asset58Lead relevance · Moderate
Why this ranks here. Mid-sized 14.4 MW signal and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance58
- Project scale (MW)13
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified4
- Multi-unit evidence3
Signal materiality35
- Event type20
- MW affected10
- Units affected5
New planned wind development signal — 2 units / 14.4 MW
Wildeshausen, Niedersachsen · Operator: Registered operator name not resolved
2 planned units · 14.4 MW · First observed 02 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 13 Jul 2029
What changed
2 new planned wind units totalling 14.4 MW were first observed in this MaStR snapshot.
Why it may matter
A newly registered planned asset may be an early sign of a development worth a quick look.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 2
- Total registered capacity
- 14.4 MW
- Capacity per unit
- 7.2 MW each
- First observed in MaStR snapshot
- 02 Oct 2026
- Planned commissioning
- 13 Jul 2029
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wea kleinenkneten…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE917527349737, SEE922289968935
Commercial signals (2): cmuqgo2wl1uvuwtj4fankgoln, cmuqgo2wl1uw4wtj4b8ehub2r
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wea kleinenkneten…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (2)
New planned asset58Lead relevance · Moderate
Why this ranks here. Mid-sized 14 MW signal and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance58
- Project scale (MW)13
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified4
- Multi-unit evidence3
Signal materiality34
- Event type20
- MW affected9
- Units affected5
New planned wind development signal — 2 units / 14 MW
Barnstorf, Niedersachsen · Operator: Registered operator name not resolved
2 planned units · 14 MW · First observed 02 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 30 Sept 2029
What changed
2 new planned wind units totalling 14 MW were first observed in this MaStR snapshot.
Why it may matter
A newly registered planned asset may be an early sign of a development worth a quick look.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 2
- Total registered capacity
- 14 MW
- Capacity per unit
- 7 MW each
- First observed in MaStR snapshot
- 02 Oct 2026
- Planned commissioning
- 30 Sept 2029
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wp aldorf…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE989593942730, SEE947890542817
Commercial signals (2): cmuqgo2wk1uvcwtj41si729p4, cmuqgo2wm1uwwwtj4hwpuzkh2
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp aldorf…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (2)
New planned asset58Lead relevance · Moderate
Why this ranks here. Mid-sized 14 MW signal and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance58
- Project scale (MW)13
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified4
- Multi-unit evidence3
Signal materiality34
- Event type20
- MW affected9
- Units affected5
New planned wind development signal — 2 units / 14 MW
Hehlen, Niedersachsen · Operator: Registered operator name not resolved
2 planned units · 14 MW · First observed 02 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 31 Dec 2028
What changed
2 new planned wind units totalling 14 MW were first observed in this MaStR snapshot.
Why it may matter
A newly registered planned asset may be an early sign of a development worth a quick look.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 2
- Total registered capacity
- 14 MW
- Capacity per unit
- 7 MW each
- First observed in MaStR snapshot
- 02 Oct 2026
- Planned commissioning
- 31 Dec 2028
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE961157713871, SEE938413537212
Commercial signals (2): cmuqgo2wn1ux5wtj4a0ds4wxp, cmuqgo2wm1uwiwtj4rtvyw0x3
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (2)
New planned asset58Lead relevance · Moderate
Why this ranks here. Mid-sized 14 MW signal and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance58
- Project scale (MW)13
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified4
- Multi-unit evidence3
Signal materiality34
- Event type20
- MW affected9
- Units affected5
New planned wind development signal — 2 units / 14 MW
Hünxe, Nordrhein-Westfalen · Operator: Registered operator name not resolved
2 planned units · 14 MW · First observed 02 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 01 Dec 2028
What changed
2 new planned wind units totalling 14 MW were first observed in this MaStR snapshot.
Why it may matter
A newly registered planned asset may be an early sign of a development worth a quick look.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 2
- Total registered capacity
- 14 MW
- Capacity per unit
- 7 MW each
- First observed in MaStR snapshot
- 02 Oct 2026
- Planned commissioning
- 01 Dec 2028
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE954154374251, SEE985195152904
Commercial signals (2): cmuqgo2wn1ux3wtj43g50udnr, cmuqgo2wm1uwkwtj4fslfkwdc
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (2)
New planned asset58Lead relevance · Moderate
Why this ranks here. Mid-sized 13.6 MW signal and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance58
- Project scale (MW)13
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified4
- Multi-unit evidence3
Signal materiality34
- Event type20
- MW affected9
- Units affected5
New planned wind development signal — 2 units / 13.6 MW
Grevesmühlen, Mecklenburg-Vorpommern · Operator: Registered operator name not resolved
2 planned units · 13.6 MW · First observed 02 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 29 Sept 2031
What changed
2 new planned wind units totalling 13.6 MW were first observed in this MaStR snapshot.
Why it may matter
A newly registered planned asset may be an early sign of a development worth a quick look.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 2
- Total registered capacity
- 13.6 MW
- Capacity per unit
- 6.8 MW each
- First observed in MaStR snapshot
- 02 Oct 2026
- Planned commissioning
- 29 Sept 2031
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 2 Oct 2026
MaStR unit IDs: SEE988583929515, SEE921438294345
Commercial signals (2): cmuqgo2wk1uvfwtj4ydrk0sxk, cmuqgo2wl1uw3wtj4q6xtm4pi
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (2)