61Lead relevance · High
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance61
- Project scale (MW)14
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified4
- Multi-unit evidence5
Signal materiality38
- Event type20
- MW affected10
- Units affected8
New planned wind development signal — 3 units / 16.8 MW
Emmendorf, Niedersachsen · Operator: Operator ID ABR950070151648 (name not resolved)
3 planned units · 16.8 MW · First observed 02 Oct 2026
- MaStR evidence: HIGH
- Registry only · external search not performed
What changed
3 new planned wind units totalling 16.8 MW were first observed in this MaStR snapshot.
Why this ranks high. Mid-sized 16.8 MW signal, 3 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.
Why it may matter
Possible relevance
Investigation hypotheses only. They are not evidence that any of these needs currently exist.
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
Verify next
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Change summary
- Planned units first observed
- 3
- Total registered capacity
- 16.8 MW
- Capacity per unit
- 5.6 MW each
- First observed in MaStR snapshot
- 02 Oct 2026
- Planned commissioning
- 02 Mar 2030
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (3)
SEE990733332908View official MaStR record ↗SEE909875564245View official MaStR record ↗SEE919254006778View official MaStR record ↗
Grouping basis
Supporting registry evidence: Shared unit-name pattern (“hy hoystorf…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
MaStR technical details
- Asset type (MaStR)
- Horizontalläufer
- Energy carrier (MaStR)
- Wind
- Operating status (MaStR)
- In Planung
Evidence confidence
MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.
Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.
Snapshot transition
First tracked snapshot → 2 Oct 2026