Intelligence brief

German Energy Asset Change Intelligence — 2026-10-05

A curated, source-traceable view of registered MaStR asset updates.

Coverage: 02 Oct → 05 Oct 2026Latest MaStR snapshot: 5 Oct 2026Snapshots compared: 2

Covers several days. Do not compare its counts with daily or weekly reports.

Source coverageLatest MaStR snapshot: 5 Oct 2026Brief generated: 5 Oct 2026
8Top opportunities shown
The diversified selection shown in the Top section. 76 grouped events score above the investigation threshold in total. A registry signal only: it does not establish procurement activity or buyer intent.
63New development signals
8Major schedule shifts
4Operator changes
5Commissioning events
1.47 GWNewly planned capacity

81 grouped events (units merged into likely site groups; not confirmed projects). Unit-level records: 273 registry changes across 273 registrations, 1.8 GW registered capacity.

Start here

  1. 80New planned wind development signal — 15 units / 90 MW · Wedemark, Niedersachsen
  2. 75New planned wind units — 11 units / 79.2 MW · Werneuchen, Brandenburg
  3. 75New planned wind development signal — 8 units / 53.3 MW · Prenzlau, Brandenburg
  4. 75New planned wind development signal — 8 units / 48 MW · Uckerland, Brandenburg
  5. 71Commissioning delayed by up to 278 days — 7 units / 43.4 MW · Bad Berleburg, Nordrhein-Westfalen

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

Top opportunities to investigate (8)

Selected from the highest-scoring investigation signals, with category diversification to avoid repetitive results. Cards are ordered by opportunity score; a higher-scoring signal of an already well-represented type may appear in a section below. Scores are deterministic and are not probabilities. Everything here is a starting point for verification, not evidence of demand.

New planned asset
80Lead relevance · Very high

Why this ranks high. Large 90 MW multi-unit signal, 15 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance80

  • Project scale (MW)23
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence9

Signal materiality53

  • Event type20
  • MW affected18
  • Units affected15

New planned wind development signal — 15 units / 90 MW

Wedemark, Niedersachsen · Operator: enercity Erneuerbare Projekte GmbH & Co. KG

15 planned units · 90 MW · First observed 05 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Mar 2029

15 new planned wind units totalling 90 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
15
Total registered capacity
90 MW
Capacity per unit
6 MW each
First observed in MaStR snapshot
05 Oct 2026
Planned commissioning
31 Mar 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 15 registered MaStR units
Snapshot transition: First tracked snapshot → 5 Oct 2026
MaStR unit IDs: SEE923204127666, SEE925495710510, SEE929685830927, SEE933695925719, SEE944728701927, SEE984735409928, SEE986137951142, SEE990224736680, SEE990607072633, SEE992996000013, SEE961214323166, SEE967149497125, SEE969928819470, SEE971781082830, SEE973642474112
Commercial signals (15): cmuvj7xi90y3awtd4yhgsv1sc, cmuvj7xi90y3gwtd4hahtor5s, cmuvj7xia0y3pwtd4205sg4ij, cmuvj7xia0y3xwtd4ua3060fd, cmuvj7xib0y4mwtd44efl6lhn, cmuvj7xig0y7ywtd49o6c9b8n, cmuvj7xig0y80wtd4pcpwm7zx, cmuvj7xig0y89wtd4chy661fo, cmuvj7xig0y8cwtd4laercppk, cmuvj7xih0y8nwtd4u387e01a, cmuvj7xid0y5twtd4pooq49rz, cmuvj7xie0y6gwtd4d6twpthf, cmuvj7xie0y6owtd4qgv0kixh, cmuvj7xie0y6twtd4hti0cw18, cmuvj7xif0y71wtd47c2vritx

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
75Lead relevance · Very high

Why this ranks high. Large 79.2 MW multi-unit signal, 11 registrations moving together, freshly registered planned asset and the registered operator is known. The grouping evidence is limited.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance75

  • Project scale (MW)22
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5

Signal materiality52

  • Event type20
  • MW affected17
  • Units affected15

New planned wind units — 11 units / 79.2 MW

Werneuchen, Brandenburg · Operator: ENERTRAG SE

11 planned units · 79.2 MW · First observed 05 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 15 May – 15 Sept 2029

11 new planned wind units totalling 79.2 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
11
Total registered capacity
79.2 MW
Capacity per unit
7.2 MW each
First observed in MaStR snapshot
05 Oct 2026
Planned commissioning between
15 May – 15 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Conservative group — Identical registered capacity
Presentation group: 11 registered MaStR units
Snapshot transition: First tracked snapshot → 5 Oct 2026
MaStR unit IDs: SEE910842512886, SEE938485552335, SEE947948554434, SEE900940443601, SEE908882090136, SEE990754448695, SEE958864773151, SEE961887820108, SEE964604442171, SEE971740420024, SEE981069060115
Commercial signals (11): cmuvj7xi80y2mwtd4r4mkhlwx, cmuvj7xia0y46wtd4e5tm03la, cmuvj7xic0y4zwtd4m2vzd8hi, cmuvj7xi70y1qwtd4iwgnukvf, cmuvj7xi80y2fwtd4wfh9mvgk, cmuvj7xih0y8ewtd4wgq19m7q, cmuvj7xic0y5nwtd4c251dtq1, cmuvj7xid0y5ywtd4j2g69j3l, cmuvj7xid0y63wtd4y2uvbbf8, cmuvj7xie0y6swtd4m2onr1dy, cmuvj7xig0y7rwtd4p2bt9r8p

Grouping basisConservative group
Supporting registry evidence: Identical registered capacity
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
75Lead relevance · Very high

Why this ranks high. Large 53.3 MW multi-unit signal, 8 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance75

  • Project scale (MW)20
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence7

Signal materiality48

  • Event type20
  • MW affected15
  • Units affected13

New planned wind development signal — 8 units / 53.3 MW

Prenzlau, Brandenburg · Operator: Denker & Wulf AG

8 planned units · 53.3 MW · First observed 05 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Sept 2029

8 new planned wind units totalling 53.3 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
8
Total registered capacity
53.3 MW
Capacity per unit
5.7–6.8 MW per unit
First observed in MaStR snapshot
05 Oct 2026
Planned commissioning
30 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“klinkow…”); Same planned/commissioning date on every unit
Presentation group: 8 registered MaStR units
Snapshot transition: First tracked snapshot → 5 Oct 2026
MaStR unit IDs: SEE915528647494, SEE926660470154, SEE945328682050, SEE946805941325, SEE949430444445, SEE993569694714, SEE969302871469, SEE970027004919
Commercial signals (8): cmuvj7xi80y2uwtd4bfcmngp8, cmuvj7xi90y3iwtd4ntcq4lsz, cmuvj7xib0y4qwtd4wiwqfvhz, cmuvj7xib0y4vwtd4h09cf2jl, cmuvj7xic0y53wtd4sm4yausv, cmuvj7xih0y8owtd4pbwnjfb4, cmuvj7xie0y6lwtd4g8vwte8a, cmuvj7xie0y6pwtd45tfcdgh4

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“klinkow…”); Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
75Lead relevance · Very high

Why this ranks high. Large 48 MW multi-unit signal, 8 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance75

  • Project scale (MW)20
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence7

Signal materiality48

  • Event type20
  • MW affected15
  • Units affected13

New planned wind development signal — 8 units / 48 MW

Uckerland, Brandenburg · Operator: TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH

8 planned units · 48 MW · First observed 05 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 May 2029

8 new planned wind units totalling 48 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
8
Total registered capacity
48 MW
Capacity per unit
6 MW each
First observed in MaStR snapshot
05 Oct 2026
Planned commissioning
01 May 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wea rep…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 8 registered MaStR units
Snapshot transition: First tracked snapshot → 5 Oct 2026
MaStR unit IDs: SEE920241098973, SEE923079053701, SEE946673673847, SEE949169917340, SEE900923945313, SEE905225034765, SEE990635737801, SEE959868309025
Commercial signals (8): cmuvj7xi90y34wtd4t6jjhnyk, cmuvj7xi90y38wtd4dt0oaiyx, cmuvj7xib0y4uwtd48yu9gxiw, cmuvj7xic0y52wtd4hep0i72x, cmuvj7xi70y1pwtd44ag2yd8r, cmuvj7xi80y29wtd4gc8ziolg, cmuvj7xih0y8dwtd4jgzyyq55, cmuvj7xid0y5qwtd4zzlyqx5g

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wea rep…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
71Lead relevance · High

Why this ranks high. Mid-sized 43.4 MW signal, 7 registrations moving together, unusually large schedule shift (278 days) and the registered operator is known. It may still reflect a registry correction rather than a new commercial need.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance71

  • Project scale (MW)19
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence7
  • Size of change5

Signal materiality62

  • Event type16
  • Size of change20
  • MW affected14
  • Units affected12

Commissioning delayed by up to 278 days — 7 units / 43.4 MW

Bad Berleburg, Nordrhein-Westfalen · Operator: Windpark Hermannstein GmbH & Co. KG

7 units · 43.4 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Sept 2026 → Jul 2027 (+278 days)

7 wind units registered a later planned commissioning date (+278 days).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
7
Planned commissioning (same for every unit)
Sept 2026 → Jul 2027 (+278 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 7 registered MaStR units
Snapshot transition: 2 Oct 2026 → 5 Oct 2026
MaStR unit IDs: SEE967108536407, SEE993604411979, SEE998848149244, SEE946178507371, SEE965745865942, SEE917315601764, SEE959293887617
Commercial signals (7): cmuvj7xie0y6fwtd4aytbgthn, cmuvj7xih0y8pwtd47j6txauu, cmuvj7xii0y94wtd4nn6qo3yv, cmuvj7xib0y4twtd4q0u3x6qd, cmuvj7xie0y6cwtd4vd3g3tjn, cmuvj7xi90y2xwtd4dabd0ru9, cmuvj7xid0y5owtd49iyyqbei

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
69Lead relevance · High

Why this ranks high. Mid-sized 34 MW signal, 5 registrations moving together, unusually large schedule shift (285 days) and the registered operator is known. It may still reflect a registry correction rather than a new commercial need.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance69

  • Project scale (MW)18
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6
  • Size of change5

Signal materiality61

  • Event type16
  • Size of change21
  • MW affected13
  • Units affected11

Commissioning rescheduled — 5 units / 34 MW

Bad Driburg, Nordrhein-Westfalen · Operator: Bürgerwind Dringenberg GmbH & Co. KG

5 units · 34 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 18 Sept 2026 – 20 Mar 2028

5 wind units registered a changed planned commissioning date (-264 days to +285 days).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
5
Planned commissioning before
18 Sept 2026 – 20 Mar 2028
Planned commissioning now
30 Jun 2027
Shift per unit
-264 to +285 days
Direction
2 later, 3 earlier
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 5 registered MaStR units
Snapshot transition: 2 Oct 2026 → 5 Oct 2026
MaStR unit IDs: SEE923915921898, SEE919285310028, SEE912318515476, SEE901544695083, SEE942490703323
Commercial signals (5): cmuvj7xi90y3dwtd4una5ddyf, cmuvj7xi90y30wtd4jcligf0q, cmuvj7xi80y2owtd40bm0a771, cmuvj7xi70y1uwtd4hfrbbfs0, cmuvj7xib0y4ewtd4m4y09wxi

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Operator change
64Lead relevance · High

Why this ranks high. Large 64.8 MW multi-unit signal and 9 registrations moving together. Operator identity is unresolved, which reduces immediate actionability.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance64

  • Project scale (MW)21
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence8

Signal materiality44

  • Event type14
  • MW affected16
  • Units affected14

Registered operator changed on 9 wind units — 9 units / 64.8 MW

Spantekow, Mecklenburg-Vorpommern · Operator: Registered operator name not resolved

9 units · 64.8 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 9 wind units.

A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligence
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Units with an operator change
9
Previous registered operator
PROKON Regenerative Energien eG
New registered operator
Operator ID ABR949290851247 (name not resolved)
  • Project development or development-management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“dennin ii…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 9 registered MaStR units
Snapshot transition: 2 Oct 2026 → 5 Oct 2026
MaStR unit IDs: SEE994011096100, SEE966198283345, SEE991126162188, SEE983498089514, SEE902019207794, SEE944033216543, SEE969902460988, SEE954023618585, SEE912715034600
Commercial signals (9): cmuvj7xih0y8rwtd407avhw2w, cmuvj7xie0y6dwtd4gp4yz50u, cmuvj7xih0y8fwtd4apad3t3u, cmuvj7xig0y7vwtd4g8q1hj0i, cmuvj7xi70y1zwtd4ropw4ym9, cmuvj7xib0y4jwtd47wia6qwp, cmuvj7xie0y6nwtd4qpk5m58h, cmuvj7xic0y5awtd4beriq3sf, cmuvj7xi80y2pwtd4obyrzp7r

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“dennin ii…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Capacity change
53Lead relevance · Moderate

Why this ranks here. The registered operator is known. It affects only one 5.56 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance53

  • Project scale (MW)8
  • Event type14
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change3

Signal materiality35

  • Event type18
  • Size of change11
  • MW affected6

Registered wind capacity reduced (-1.24 MW) — 5.56 MW

Altenbeken, Nordrhein-Westfalen · Operator: Olor Wind GmbH & Co. KG

1 unit · 5.56 MW

Wind · Wind turbine (horizontal-axis)

Registered capacity changed from 6.8 MW to 5.56 MW (-1.24 MW, -18%).

A smaller registered capacity may indicate a scaled-back or redesigned project, which could change the scope of engineering and equipment requirements.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Design / technologyGrid connectionEngineeringEquipment sizing
Design change?Permit & grid documentsDeveloper updates
Facts, hypotheses and how to verify
Registered capacity
6.8 MW → 5.56 MW (-1.24 MW / -18%)
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Check whether the change reflects a design or turbine-model change
  • Compare with permit and grid-connection documents
  • Look for recent developer announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 2 Oct 2026 → 5 Oct 2026
MaStR unit IDs: SEE960160907789
Commercial signals (1): cmuvj7xid0y5rwtd4hm2ujcsh

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

New developments (12)

New planned asset
74Lead relevance · High

Why this ranks high. Mid-sized 42 MW signal, 6 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance74

  • Project scale (MW)19
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence7

Signal materiality46

  • Event type20
  • MW affected14
  • Units affected12

New planned wind development signal — 6 units / 42 MW

Jardelund, Schleswig-Holstein · Operator: Bürgerwindpark Medelby 2 GmbH & Co. KG

6 planned units · 42 MW · First observed 05 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 02 Oct 2029

6 new planned wind units totalling 42 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
6
Total registered capacity
42 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
05 Oct 2026
Planned commissioning
02 Oct 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 6 registered MaStR units
Snapshot transition: First tracked snapshot → 5 Oct 2026
MaStR unit IDs: SEE901497897046, SEE903599740176, SEE904533207991, SEE990400295543, SEE962726293947, SEE964917305651
Commercial signals (6): cmuvj7xi70y1twtd4304pvqw7, cmuvj7xi80y25wtd4rks9zotk, cmuvj7xi80y27wtd4yiv44fyr, cmuvj7xig0y8awtd4jhcc0fy8, cmuvj7xid0y5zwtd4hy2700ca, cmuvj7xid0y67wtd4oev4og3h

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
74Lead relevance · High

Why this ranks high. Mid-sized 42 MW signal, 6 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance74

  • Project scale (MW)19
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence7

Signal materiality46

  • Event type20
  • MW affected14
  • Units affected12

New planned wind development signal — 6 units / 42 MW

Lemgow, Niedersachsen · Operator: NxW Schweskau GmbH

6 planned units · 42 MW · First observed 05 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Nov 2028

6 new planned wind units totalling 42 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
6
Total registered capacity
42 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
05 Oct 2026
Planned commissioning
01 Nov 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wea swk i…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 6 registered MaStR units
Snapshot transition: First tracked snapshot → 5 Oct 2026
MaStR unit IDs: SEE930518477905, SEE901273788834, SEE986303871557, SEE963648490926, SEE999738246982, SEE979053950436
Commercial signals (6): cmuvj7xia0y3qwtd4qu38iw0k, cmuvj7xi70y1swtd4tk7t273e, cmuvj7xig0y82wtd4doseisnl, cmuvj7xid0y61wtd4lsdpvl5n, cmuvj7xi70y1mwtd49id8sd3f, cmuvj7xif0y7iwtd46k7aa2rs

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wea swk i…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
72Lead relevance · High

Why this ranks high. Mid-sized 36 MW signal, 5 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance72

  • Project scale (MW)18
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality45

  • Event type20
  • MW affected14
  • Units affected11

New planned wind development signal — 5 units / 36 MW

Agathenburg, Niedersachsen · Operator: PNE AG

5 planned units · 36 MW · First observed 05 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Jun 2028

5 new planned wind units totalling 36 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
5
Total registered capacity
36 MW
Capacity per unit
7.2 MW each
First observed in MaStR snapshot
05 Oct 2026
Planned commissioning
30 Jun 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wp agathenburg repowering…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 5 registered MaStR units
Snapshot transition: First tracked snapshot → 5 Oct 2026
MaStR unit IDs: SEE910523353159, SEE934238533927, SEE991858228657, SEE966759611181, SEE971085712693
Commercial signals (5): cmuvj7xi80y2lwtd4hvujzcx1, cmuvj7xia0y3zwtd4noh9ny13, cmuvj7xih0y8hwtd4a6j32keh, cmuvj7xie0y6ewtd444jt2b8v, cmuvj7xie0y6rwtd42tqaznp9

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp agathenburg repowering…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
72Lead relevance · High

Why this ranks high. Mid-sized 35 MW signal, 5 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance72

  • Project scale (MW)18
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality44

  • Event type20
  • MW affected13
  • Units affected11

New planned wind development signal — 5 units / 35 MW

Wardenburg, Niedersachsen · Operator: WindStrom Erneuerbare Energien GmbH & Co. KG

5 planned units · 35 MW · First observed 05 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Dec 2028

5 new planned wind units totalling 35 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
5
Total registered capacity
35 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
05 Oct 2026
Planned commissioning
31 Dec 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wea re…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 5 registered MaStR units
Snapshot transition: First tracked snapshot → 5 Oct 2026
MaStR unit IDs: SEE917336374777, SEE989401081125, SEE992342219656, SEE961665097524, SEE969003509531
Commercial signals (5): cmuvj7xi90y2ywtd4n17apwk8, cmuvj7xig0y86wtd4g8n8gobk, cmuvj7xih0y8kwtd45crlf2jn, cmuvj7xid0y5wwtd4cx1crx0e, cmuvj7xie0y6kwtd42ehg0y03

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wea re…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
71Lead relevance · High

Why this ranks high. Large 64.8 MW multi-unit signal, 9 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance71

  • Project scale (MW)21
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence8

Signal materiality50

  • Event type20
  • MW affected16
  • Units affected14

New planned wind development signal — 9 units / 64.8 MW

Schenkendöbern, Brandenburg · Operator: Registered operator name not resolved

9 planned units · 64.8 MW · First observed 05 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 17 Apr 2029

9 new planned wind units totalling 64.8 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
9
Total registered capacity
64.8 MW
Capacity per unit
7.2 MW each
First observed in MaStR snapshot
05 Oct 2026
Planned commissioning
17 Apr 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 9 registered MaStR units
Snapshot transition: First tracked snapshot → 5 Oct 2026
MaStR unit IDs: SEE915751748029, SEE919684889644, SEE927343818447, SEE947106213708, SEE907593783740, SEE994623721094, SEE998948680982, SEE953113625199, SEE961234886344
Commercial signals (9): cmuvj7xi90y2vwtd4fndunds9, cmuvj7xi90y32wtd4tkt7egz9, cmuvj7xi90y3jwtd4ocxsbzq3, cmuvj7xib0y4wwtd4aegs2xmz, cmuvj7xi80y2ewtd4gza4r37l, cmuvj7xih0y8twtd45vxk5zta, cmuvj7xii0y95wtd4no2435pd, cmuvj7xic0y59wtd44rjeptat, cmuvj7xid0y5uwtd4kqva2xhp

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
71Lead relevance · High

Why this ranks high. Large 63 MW multi-unit signal, 10 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance71

  • Project scale (MW)21
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence8

Signal materiality50

  • Event type20
  • MW affected16
  • Units affected14

New planned wind development signal — 10 units / 63 MW

Diemelstadt, Hessen · Operator: Registered operator name not resolved

10 planned units · 63 MW · First observed 05 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 29 Sept 2030

10 new planned wind units totalling 63 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
10
Total registered capacity
63 MW
Capacity per unit
6.3 MW each
First observed in MaStR snapshot
05 Oct 2026
Planned commissioning
29 Sept 2030
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“rhoder forst…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 10 registered MaStR units
Snapshot transition: First tracked snapshot → 5 Oct 2026
MaStR unit IDs: SEE910997948967, SEE938166892330, SEE943446592404, SEE943842087382, SEE902219772023, SEE983397095586, SEE984970713965, SEE997271514032, SEE997556131855, SEE957189833243
Commercial signals (10): cmuvj7xi80y2nwtd4an25n3mn, cmuvj7xia0y45wtd45ftoee2i, cmuvj7xib0y4hwtd4gojigu5v, cmuvj7xib0y4iwtd4hrv91w9j, cmuvj7xi70y20wtd4n1mny2ut, cmuvj7xig0y7uwtd4hz7lxix7, cmuvj7xig0y7zwtd48a74th8c, cmuvj7xih0y8zwtd4zoe4oxvu, cmuvj7xii0y92wtd4hiewqv1h, cmuvj7xic0y5iwtd4zh8dbqgk

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“rhoder forst…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
71Lead relevance · High

Why this ranks high. Mid-sized 30.68 MW signal, 5 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance71

  • Project scale (MW)17
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality44

  • Event type20
  • MW affected13
  • Units affected11

New planned wind development signal — 5 units / 30.68 MW

Lähden, Niedersachsen · Operator: Pieper Öko-Strom Verwaltungsgesellschaft mbH

5 planned units · 30.68 MW · First observed 05 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 May 2029

5 new planned wind units totalling 30.68 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
5
Total registered capacity
30.68 MW
Capacity per unit
5.56–7 MW per unit
First observed in MaStR snapshot
05 Oct 2026
Planned commissioning
01 May 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“lähden rep…”); Same planned/commissioning date on every unit
Presentation group: 5 registered MaStR units
Snapshot transition: First tracked snapshot → 5 Oct 2026
MaStR unit IDs: SEE919242130171, SEE924424884636, SEE942267087014, SEE986187982769, SEE989679106018
Commercial signals (5): cmuvj7xi90y2zwtd47ffk467t, cmuvj7xi90y3ewtd4bo1azom4, cmuvj7xib0y4cwtd4keeixttu, cmuvj7xig0y81wtd4crp73uld, cmuvj7xig0y87wtd4rvcnxtuh

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“lähden rep…”); Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
71Lead relevance · High

Why this ranks high. Mid-sized 28 MW signal, 4 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance71

  • Project scale (MW)17
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality42

  • Event type20
  • MW affected12
  • Units affected10

New planned wind development signal — 4 units / 28 MW

Osterby, Schleswig-Holstein · Operator: Bürgerwindpark im Kirchspiel Medelby GmbH & Co. KG

4 planned units · 28 MW · First observed 05 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 09 Sept 2029

4 new planned wind units totalling 28 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
4
Total registered capacity
28 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
05 Oct 2026
Planned commissioning
09 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 4 registered MaStR units
Snapshot transition: First tracked snapshot → 5 Oct 2026
MaStR unit IDs: SEE944241200709, SEE951230068615, SEE909106309379, SEE980350343074
Commercial signals (4): cmuvj7xib0y4kwtd436uaz94h, cmuvj7xic0y55wtd4lzrwn39q, cmuvj7xi80y2gwtd4skvar451, cmuvj7xif0y7nwtd4245om4tv

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
70Lead relevance · High

Why this ranks high. Mid-sized 27.2 MW signal, 4 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance70

  • Project scale (MW)16
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality42

  • Event type20
  • MW affected12
  • Units affected10

New planned wind development signal — 4 units / 27.2 MW

Sundern (Sauerland), Nordrhein-Westfalen · Operator: NATURWERK Windenergie GmbH

4 planned units · 27.2 MW · First observed 05 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Oct 2028

4 new planned wind units totalling 27.2 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
4
Total registered capacity
27.2 MW
Capacity per unit
6.8 MW each
First observed in MaStR snapshot
05 Oct 2026
Planned commissioning
31 Oct 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 4 registered MaStR units
Snapshot transition: First tracked snapshot → 5 Oct 2026
MaStR unit IDs: SEE916883910681, SEE923111187753, SEE936865088412, SEE992946805422
Commercial signals (4): cmuvj7xi90y2wwtd4je7msllh, cmuvj7xi90y39wtd4fe29l28r, cmuvj7xia0y42wtd4pd8qm260, cmuvj7xih0y8mwtd4uy97nigt

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
68Lead relevance · High

Why this ranks high. Mid-sized 42 MW signal, 7 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance68

  • Project scale (MW)19
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence7

Signal materiality46

  • Event type20
  • MW affected14
  • Units affected12

New planned wind development signal — 7 units / 42 MW

Groß Kiesow, Mecklenburg-Vorpommern · Operator: Registered operator name not resolved

7 planned units · 42 MW · First observed 05 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Jan 2028

7 new planned wind units totalling 42 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
7
Total registered capacity
42 MW
Capacity per unit
6 MW each
First observed in MaStR snapshot
05 Oct 2026
Planned commissioning
01 Jan 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 7 registered MaStR units
Snapshot transition: First tracked snapshot → 5 Oct 2026
MaStR unit IDs: SEE903237204008, SEE904071916997, SEE904537864534, SEE905943702724, SEE997391413154, SEE973026635375, SEE974323630605
Commercial signals (7): cmuvj7xi70y24wtd4w1lu95zy, cmuvj7xi80y26wtd4f70sakza, cmuvj7xi80y28wtd4hc4smuny, cmuvj7xi80y2bwtd4qxct476f, cmuvj7xii0y90wtd4k6m0us5b, cmuvj7xie0y6ywtd4ri88uzqa, cmuvj7xif0y74wtd4anxmc1oc

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
68Lead relevance · High

Why this ranks high. Mid-sized 42 MW signal, 6 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance68

  • Project scale (MW)19
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence7

Signal materiality46

  • Event type20
  • MW affected14
  • Units affected12

New planned wind development signal — 6 units / 42 MW

Heretsried, Bayern · Operator: Registered operator name not resolved

6 planned units · 42 MW · First observed 05 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Dec 2026 – 31 Dec 2029

6 new planned wind units totalling 42 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
6
Total registered capacity
42 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
05 Oct 2026
Planned commissioning between
31 Dec 2026 – 31 Dec 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“emersacker heretsried wea h…”); Identical registered capacity
Presentation group: 6 registered MaStR units
Snapshot transition: First tracked snapshot → 5 Oct 2026
MaStR unit IDs: SEE931465668194, SEE945902277566, SEE958336942887, SEE964895947058, SEE965003467741, SEE968005060675
Commercial signals (6): cmuvj7xia0y3twtd4hkcghz10, cmuvj7xib0y4swtd4tbcoq5jt, cmuvj7xic0y5lwtd4gt895pol, cmuvj7xid0y66wtd40mcqfaxk, cmuvj7xid0y68wtd41xsaktpm, cmuvj7xie0y6jwtd4l33tny08

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“emersacker heretsried wea h…”); Identical registered capacity
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
68Lead relevance · High

Why this ranks high. Mid-sized 42 MW signal, 7 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance68

  • Project scale (MW)19
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence7

Signal materiality46

  • Event type20
  • MW affected14
  • Units affected12

New planned wind development signal — 7 units / 42 MW

Oetzen, Niedersachsen · Operator: Registered operator name not resolved

7 planned units · 42 MW · First observed 05 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 16 Mar 2029

7 new planned wind units totalling 42 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
7
Total registered capacity
42 MW
Capacity per unit
6 MW each
First observed in MaStR snapshot
05 Oct 2026
Planned commissioning
16 Mar 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 7 registered MaStR units
Snapshot transition: First tracked snapshot → 5 Oct 2026
MaStR unit IDs: SEE933132020168, SEE945175889909, SEE947568978498, SEE901090081088, SEE905396780409, SEE956212996962, SEE979162193946
Commercial signals (7): cmuvj7xia0y3wwtd4yhy4xxrp, cmuvj7xib0y4pwtd4m70qanw3, cmuvj7xib0y4xwtd4pay7ax1q, cmuvj7xi70y1rwtd4ob43wiwe, cmuvj7xi80y2awtd473rkdefu, cmuvj7xic0y5fwtd4dq6aq768, cmuvj7xif0y7jwtd4tk2m7fqh

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
↑ Back to top

Major schedule changes (6)

Schedule change
64Lead relevance · High

Why this ranks high. Mid-sized 37.2 MW signal, 6 registrations moving together and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance64

  • Project scale (MW)18
  • Event type8
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence7
  • Size of change3

Signal materiality52

  • Event type16
  • Size of change10
  • MW affected14
  • Units affected12

Commissioning delayed by up to 41 days — 6 units / 37.2 MW

Bad Berleburg, Nordrhein-Westfalen · Operator: K E Energy Holding GmbH & Co. KG

6 units · 37.2 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 15 Mar 2028 → 25 Apr 2028 (+41 days)

6 wind units registered a later planned commissioning date (+41 days).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
6
Planned commissioning (same for every unit)
15 Mar 2028 → 25 Apr 2028 (+41 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“bärenkopf…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 6 registered MaStR units
Snapshot transition: 2 Oct 2026 → 5 Oct 2026
MaStR unit IDs: SEE972213049179, SEE975305836329, SEE996019448844, SEE961059275255, SEE994138283353, SEE936013108597
Commercial signals (6): cmuvj7xie0y6xwtd4iwwbpm76, cmuvj7xif0y79wtd44opoikwc, cmuvj7xih0y8vwtd41hzkuakq, cmuvj7xid0y5swtd4c41ivnre, cmuvj7xih0y8swtd4l63js81p, cmuvj7xia0y41wtd4vwt8vzvi

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“bärenkopf…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
59Lead relevance · Moderate

Why this ranks here. Mid-sized 20.4 MW signal, 3 registrations moving together and the registered operator is known. No external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance59

  • Project scale (MW)15
  • Event type8
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5
  • Size of change3

Signal materiality45

  • Event type16
  • Size of change10
  • MW affected11
  • Units affected8

Commissioning delayed by up to 46 days — 3 units / 20.4 MW

Marienmünster, Nordrhein-Westfalen · Operator: Bürgerwind Marienmünster I GmbH & Co. KG

3 units · 20.4 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 14 Sept 2026 → 30 Oct 2026 (+46 days)

3 wind units registered a later planned commissioning date (+46 days).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
3
Planned commissioning (same for every unit)
14 Sept 2026 → 30 Oct 2026 (+46 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: 2 Oct 2026 → 5 Oct 2026
MaStR unit IDs: SEE964835940767, SEE981050560624, SEE900433381939
Commercial signals (3): cmuvj7xid0y65wtd4hpmqt96o, cmuvj7xig0y7qwtd44125e8zu, cmuvj7xi70y1owtd4uhbg5ehb

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
57Lead relevance · Moderate

Why this ranks here. Mid-sized 18 MW signal, 3 registrations moving together and the registered operator is known. No external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance57

  • Project scale (MW)14
  • Event type8
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5
  • Size of change2

Signal materiality44

  • Event type16
  • Size of change9
  • MW affected11
  • Units affected8

Commissioning delayed by up to 39 days — 3 units / 18 MW

Kirchhundem, Nordrhein-Westfalen · Operator: Windpark Kirchhundem GmbH

3 units · 18 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 18 Sept 2026 → 27 Oct 2026 (+39 days)

3 wind units registered a later planned commissioning date (+39 days).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
3
Planned commissioning (same for every unit)
18 Sept 2026 → 27 Oct 2026 (+39 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wp kirchhundem…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: 2 Oct 2026 → 5 Oct 2026
MaStR unit IDs: SEE945889137327, SEE974438431579, SEE989205288843
Commercial signals (3): cmuvj7xib0y4rwtd4xjlqp83y, cmuvj7xif0y76wtd4mmzbs2gc, cmuvj7xig0y85wtd41rpol338

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp kirchhundem…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
55Lead relevance · Moderate

Why this ranks here. Unusually large schedule shift (731 days) and the registered operator is known. It affects only one 7 MW unit; it may still reflect a registry correction rather than a new commercial need; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance55

  • Project scale (MW)9
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change6

Signal materiality48

  • Event type16
  • Size of change25
  • MW affected7

Commissioning delayed by 731 days — 7 MW

Winterberg, Nordrhein-Westfalen · Operator: VERBUND Green Power Deutschland GmbH

1 unit · 7 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Dec 2026 → Dec 2028 (+731 days)

The registered planned commissioning date moved by +731 days (Dec 2026 → Dec 2028).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Planned commissioning
Dec 2026 → Dec 2028 (+731 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 2 Oct 2026 → 5 Oct 2026
MaStR unit IDs: SEE965044431794
Commercial signals (1): cmuvj7xid0y69wtd4rygjeitk

Grouping basisSingle unit
A single MaStR registration.
Schedule change
54Lead relevance · Moderate

Why this ranks here. Unusually large schedule shift (264 days) and the registered operator is known. It affects only one 6.8 MW unit; it may still reflect a registry correction rather than a new commercial need; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance54

  • Project scale (MW)9
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change5

Signal materiality43

  • Event type16
  • Size of change20
  • MW affected7

Commissioning moved forward by 264 days — 6.8 MW

Brakel, Nordrhein-Westfalen · Operator: Bürgerwind Dringenberg GmbH & Co. KG

1 unit · 6.8 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Mar 2028 → Jun 2027 (-264 days)

The registered planned commissioning date moved by -264 days (Mar 2028 → Jun 2027).

An earlier registered commissioning date may indicate a compressed delivery window and could bring supplier or service requirements forward. It may also be a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Planned commissioning
Mar 2028 → Jun 2027 (-264 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 2 Oct 2026 → 5 Oct 2026
MaStR unit IDs: SEE983111564473
Commercial signals (1): cmuvj7xig0y7twtd4kpfxiiwn

Grouping basisSingle unit
A single MaStR registration.
Schedule change
48Lead relevance · Moderate

Why this ranks here. The registered operator is known. It affects only one 6.8 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance48

  • Project scale (MW)9
  • Event type8
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change3

Signal materiality33

  • Event type16
  • Size of change10
  • MW affected7

Commissioning delayed by 46 days — 6.8 MW

Marienmünster, Nordrhein-Westfalen · Operator: Bürgerwind Marienmünster II GmbH & Co. KG

1 unit · 6.8 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 14 Sept 2026 → 30 Oct 2026 (+46 days)

The registered planned commissioning date moved by +46 days (14 Sept 2026 → 30 Oct 2026).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Planned commissioning
14 Sept 2026 → 30 Oct 2026 (+46 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 2 Oct 2026 → 5 Oct 2026
MaStR unit IDs: SEE923394966250
Commercial signals (1): cmuvj7xi90y3bwtd4flgv345k

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Operator / company changes (3)

Operator change
51Lead relevance · Moderate

Why this ranks here. Mid-sized 14 MW signal. Operator identity is unresolved, which reduces immediate actionability; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance51

  • Project scale (MW)13
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence3

Signal materiality28

  • Event type14
  • MW affected9
  • Units affected5

Registered operator changed on 2 wind units — 2 units / 14 MW

Haren (Ems), Niedersachsen · Operator: Registered operator name not resolved

2 units · 14 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 2 wind units.

A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligence
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Units with an operator change
2
Previous registered operator
BW Bürgerwindpark Fehndorf/Lindloh GmbH & Co. KG
New registered operator
Operator ID ABR992375083385 (name not resolved)
  • Project development or development-management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 2 Oct 2026 → 5 Oct 2026
MaStR unit IDs: SEE928470628633, SEE901911283783
Commercial signals (2): cmuvj7xia0y3mwtd4q6xpnnp4, cmuvj7xi70y1xwtd4pw6uq7aq

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Operator change
49Lead relevance · Moderate

Why this ranks here. The registered operator is known. It affects only one 6.2 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance49

  • Project scale (MW)8
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality21

  • Event type14
  • MW affected7

Registered operator changed on a wind unit — 6.2 MW

Bad Wünnenberg, Nordrhein-Westfalen · Operator: Hirseohre GmbH & Co. KG

1 unit · 6.2 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 1 wind unit.

A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligence
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Previous registered operator
Energieplan Ost West GmbH & Co. KG
New registered operator
Hirseohre GmbH & Co. KG
  • Project development or development-management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 2 Oct 2026 → 5 Oct 2026
MaStR unit IDs: SEE996176705972
Commercial signals (1): cmuvj7xih0y8wwtd4w69y5l6c

Grouping basisSingle unit
A single MaStR registration.
Operator change
48Lead relevance · Moderate

Why this ranks here. The registered operator is known. It affects only one 4.5 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance48

  • Project scale (MW)7
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality20

  • Event type14
  • MW affected6

Registered operator changed on a wind unit — 4.5 MW

Alsdorf, Nordrhein-Westfalen · Operator: Windenergie Jansen GmbH

1 unit · 4.5 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 1 wind unit.

A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligence
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Previous registered operator
Operator ID ABR989202009403 (name not resolved)
New registered operator
Windenergie Jansen GmbH
  • Project development or development-management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 2 Oct 2026 → 5 Oct 2026
MaStR unit IDs: SEE949167843115
Commercial signals (1): cmuvj7xic0y51wtd4bqev7dx1

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Recently commissioned assets (5)

Commissioned asset
40Lead relevance · Low

Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance40

  • Project scale (MW)13
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality22

  • Event type12
  • MW affected10

Wind unit commissioned — 15 MW — MaStR SEE954361698188

Ausschließliche Wirtschaftszone · Operator: Nordseecluster A GmbH & Co. KG

1 unit · 15 MW

Wind · Wind turbine (horizontal-axis)

1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 15 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
15 MW
Commissioning date
15 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 2 Oct 2026 → 5 Oct 2026
MaStR unit IDs: SEE954361698188
Commercial signals (1): cmuvj7xic0y5bwtd4yu6f2orj

Grouping basisSingle unit
Stable MaStR location ID: SEL908169772991
A single MaStR registration.
Commissioned asset
40Lead relevance · Low

Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance40

  • Project scale (MW)13
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality22

  • Event type12
  • MW affected10

Wind unit commissioned — 15 MW — MaStR SEE941400067531

Ausschließliche Wirtschaftszone · Operator: Nordseecluster A GmbH & Co. KG

1 unit · 15 MW

Wind · Wind turbine (horizontal-axis)

1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 27 Jul 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
15 MW
Commissioning date
27 Jul 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 2 Oct 2026 → 5 Oct 2026
MaStR unit IDs: SEE941400067531
Commercial signals (1): cmuvj7xib0y4awtd4ml8aq336

Grouping basisSingle unit
Stable MaStR location ID: SEL924242936975
A single MaStR registration.
Commissioned asset
40Lead relevance · Low

Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance40

  • Project scale (MW)13
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality22

  • Event type12
  • MW affected10

Wind unit commissioned — 15 MW — MaStR SEE973268043396

Ausschließliche Wirtschaftszone · Operator: Nordseecluster A GmbH & Co. KG

1 unit · 15 MW

Wind · Wind turbine (horizontal-axis)

1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 11 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
15 MW
Commissioning date
11 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 2 Oct 2026 → 5 Oct 2026
MaStR unit IDs: SEE973268043396
Commercial signals (1): cmuvj7xie0y6zwtd480a1p5cw

Grouping basisSingle unit
Stable MaStR location ID: SEL931765702802
A single MaStR registration.
Commissioned asset
40Lead relevance · Low

Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance40

  • Project scale (MW)13
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality22

  • Event type12
  • MW affected10

Wind unit commissioned — 15 MW — MaStR SEE973769363061

Ausschließliche Wirtschaftszone · Operator: Nordseecluster A GmbH & Co. KG

1 unit · 15 MW

Wind · Wind turbine (horizontal-axis)

1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 11 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
15 MW
Commissioning date
11 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 2 Oct 2026 → 5 Oct 2026
MaStR unit IDs: SEE973769363061
Commercial signals (1): cmuvj7xif0y72wtd4dsxzzj0i

Grouping basisSingle unit
Stable MaStR location ID: SEL979797123547
A single MaStR registration.
Commissioned asset
34Lead relevance · Low

Why this ranks here. The registered operator is known. It affects only one 4.26 MW unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance34

  • Project scale (MW)7
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality18

  • Event type12
  • MW affected6

Wind unit commissioned — 4.26 MW

Wittbek, Schleswig-Holstein · Operator: Falkenboe Windkraftanlage 3 GmbH & Co. KG

1 unit · 4.26 MW

Wind · Wind turbine (horizontal-axis)

1 wind unit (4.26 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 28 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
4.26 MW
Commissioning date
28 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 2 Oct 2026 → 5 Oct 2026
MaStR unit IDs: SEE984336058136
Commercial signals (1): cmuvj7xig0y7xwtd4ud7tks2m

Grouping basisSingle unit
Stable MaStR location ID: SEL997314965722
A single MaStR registration.
↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.