71Lead relevance · High
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance71
- Project scale (MW)19
- Event type12
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence7
- Size of change5
Signal materiality62
- Event type16
- Size of change20
- MW affected14
- Units affected12
Commissioning delayed by up to 278 days — 7 units / 43.4 MW
Bad Berleburg, Nordrhein-Westfalen · Operator: Windpark Hermannstein GmbH & Co. KG
7 units · 43.4 MW
- MaStR evidence: HIGH
- Registry only · external search not performed
What changed
7 wind units registered a later planned commissioning date (+278 days).
Why this ranks high. Mid-sized 43.4 MW signal, 7 registrations moving together, unusually large schedule shift (278 days) and the registered operator is known. It may still reflect a registry correction rather than a new commercial need.
Why it may matter
Possible relevance
Investigation hypotheses only. They are not evidence that any of these needs currently exist.
- Project development or development-management services
- Engineering and environmental services
Verify next
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Change summary
- Units with a new planned date
- 7
- Planned commissioning (same for every unit)
- Sept 2026 → Jul 2027 (+278 days)
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (7)
SEE967108536407View official MaStR record ↗SEE993604411979View official MaStR record ↗SEE998848149244View official MaStR record ↗SEE946178507371View official MaStR record ↗SEE965745865942View official MaStR record ↗SEE917315601764View official MaStR record ↗SEE959293887617View official MaStR record ↗
Grouping basis
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
MaStR technical details
- Asset type (MaStR)
- Horizontalläufer
- Energy carrier (MaStR)
- Wind
- Operating status (MaStR)
- In Planung
Evidence confidence
MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.
Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.
Snapshot transition
2 Oct 2026 → 5 Oct 2026