Capacity change
53Lead relevance · Moderate

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance53

  • Project scale (MW)8
  • Event type14
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change3

Signal materiality35

  • Event type18
  • Size of change11
  • MW affected6

Registered wind capacity reduced (-1.24 MW) — 5.56 MW

Altenbeken, Nordrhein-Westfalen · Operator: Olor Wind GmbH & Co. KG

1 unit · 5.56 MW

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorOlor Wind GmbH & Co. KG

Registered capacity changed from 6.8 MW to 5.56 MW (-1.24 MW, -18%).

Why this ranks here. The registered operator is known. It affects only one 5.56 MW unit; no external evidence yet.

A smaller registered capacity may indicate a scaled-back or redesigned project, which could change the scope of engineering and equipment requirements.
Developer servicesGrid & electricalEngineering

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Registered capacity
6.8 MW → 5.56 MW (-1.24 MW / -18%)

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisSingle unit
A single MaStR registration.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

2 Oct 2026 → 5 Oct 2026