Intelligence brief

German Energy Asset Change Intelligence — 2026-09-28

A curated, source-traceable view of registered MaStR asset updates.

Coverage: 25 Sept → 28 Sept 2026Latest MaStR snapshot: 28 Sept 2026Snapshots compared: 2

Covers several days. Do not compare its counts with daily or weekly reports.

Source coverageLatest MaStR snapshot: 28 Sept 2026Brief generated: 28 Sept 2026
8Top opportunities shown
The diversified selection shown in the Top section. 15 grouped events score above the investigation threshold in total. A registry signal only: it does not establish procurement activity or buyer intent.
7New development signals
4Major schedule shifts
2Operator changes
6Commissioning events
89.6 MWNewly planned capacity

21 grouped events (units merged into likely site groups; not confirmed projects). Unit-level records: 36 registry changes across 35 registrations, 246.78 MW registered capacity.

Start here

  1. 68New planned wind development signal — 3 units / 21 MW · Aerzen, Niedersachsen
  2. 67Registered wind capacity increased (+6.6 MW) — 3 units / 21 MW · Wittenbergen, Schleswig-Holstein
  3. 65Commissioning delayed by up to 324 days — 3 units / 21 MW · Marienmünster, Nordrhein-Westfalen
  4. 62New planned wind development signal — 3 units / 21 MW · Pockau-Lengefeld, Sachsen
  5. 62New planned wind units — 2 units / 13.2 MW · Greußen, Thüringen

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

Top opportunities to investigate (8)

Selected from the highest-scoring investigation signals, with category diversification to avoid repetitive results. Cards are ordered by opportunity score; a higher-scoring signal of an already well-represented type may appear in a section below. Scores are deterministic and are not probabilities. Everything here is a starting point for verification, not evidence of demand.

New planned asset
68Lead relevance · High

Why this ranks high. Mid-sized 21 MW signal, 3 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance68

  • Project scale (MW)15
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind development signal — 3 units / 21 MW

Aerzen, Niedersachsen · Operator: Bürger-Energie Hummetal eG

3 planned units · 21 MW · First observed 28 Sept 2026

Wind · Wind turbine (vertical-axis)

Planned commissioning: 31 Dec 2029

3 new planned wind units totalling 21 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
21 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
28 Sept 2026
Planned commissioning
31 Dec 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“grießem…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 28 Sept 2026
MaStR unit IDs: SEE971568230867, SEE911453709467, SEE954520589524
Commercial signals (3): cmuln98zx114ywtuscyeamkot, cmuln98zx115awtusbrmnxsi4, cmuln98zy115qwtus7qgn10o8

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“grießem…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Capacity change
67Lead relevance · High

Why this ranks high. Mid-sized 21 MW signal, 3 registrations moving together and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance67

  • Project scale (MW)15
  • Event type14
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5
  • Size of change5

Signal materiality55

  • Event type18
  • Size of change18
  • MW affected11
  • Units affected8

Registered wind capacity increased (+6.6 MW) — 3 units / 21 MW

Wittenbergen, Schleswig-Holstein · Operator: Bürgerwindpark Wittenbergen GmbH & Co. KG

3 units · 21 MW

Wind · Wind turbine (horizontal-axis)

3 wind units registered a capacity change; combined registered capacity moved from 14.4 MW to 21 MW (+6.6 MW).

A larger registered capacity may indicate a changed project design, turbine or equipment choice, or grid-connection scope, and could affect engineering and equipment requirements.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Design / technologyGrid connectionEngineeringEquipment sizing
Design change?Permit & grid documentsDeveloper updates
Facts, hypotheses and how to verify
Per-unit change
3 units changed from 4.8 MW to 7 MW each
Combined registered capacity now
21 MW
Combined change
+6.6 MW (+46%)
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Check whether the change reflects a design or turbine-model change
  • Compare with permit and grid-connection documents
  • Look for recent developer announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: 25 Sept 2026 → 28 Sept 2026
MaStR unit IDs: SEE957201736248, SEE999376006917, SEE935290406266
Commercial signals (3): cmuln98zy115twtus65lbyqk9, cmuln98zy115rwtusfke1ijte, cmuln98zy115lwtusr81z9lrv

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
65Lead relevance · High

Why this ranks high. Mid-sized 21 MW signal, 3 registrations moving together, unusually large schedule shift (324 days) and the registered operator is known. It may still reflect a registry correction rather than a new commercial need.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance65

  • Project scale (MW)15
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5
  • Size of change5

Signal materiality56

  • Event type16
  • Size of change21
  • MW affected11
  • Units affected8

Commissioning delayed by up to 324 days — 3 units / 21 MW

Marienmünster, Nordrhein-Westfalen · Operator: Windenergie Marienmünster/Altenbergen GmbH & Co. KG

3 units · 21 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Sept 2026 → Jul 2027 (+324 days)

3 wind units registered a later planned commissioning date (+324 days).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
3
Planned commissioning (same for every unit)
Sept 2026 → Jul 2027 (+324 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: 25 Sept 2026 → 28 Sept 2026
MaStR unit IDs: SEE976339457269, SEE917304317096, SEE909122124024
Commercial signals (3): cmuln98zx1150wtus5x9pcziy, cmuln98zy115dwtus2o323l12, cmuln98zx1159wtus5rv2bdhf

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
62Lead relevance · High

Why this ranks high. Mid-sized 21 MW signal, 3 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance62

  • Project scale (MW)15
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence5

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind development signal — 3 units / 21 MW

Pockau-Lengefeld, Sachsen · Operator: Registered operator name not resolved

3 planned units · 21 MW · First observed 28 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Dec 2029

3 new planned wind units totalling 21 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
21 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
28 Sept 2026
Planned commissioning
31 Dec 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wp lip…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 28 Sept 2026
MaStR unit IDs: SEE901392943039, SEE934991479166, SEE971658744359
Commercial signals (3): cmuln98zx1158wtusazpluw4j, cmuln98zy115kwtusavolwhtd, cmuln98zx114zwtus6qgrhb0f

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp lip…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
62Lead relevance · High

Why this ranks high. Freshly registered planned asset and the registered operator is known. Small combined capacity (13.2 MW); the grouping evidence is limited.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance62

  • Project scale (MW)12
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence2

Signal materiality34

  • Event type20
  • MW affected9
  • Units affected5

New planned wind units — 2 units / 13.2 MW

Greußen, Thüringen · Operator: BOREAS Energie GmbH

2 planned units · 13.2 MW · First observed 28 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Dec 2028

2 new planned wind units totalling 13.2 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
13.2 MW
Capacity per unit
6–7.2 MW per unit
First observed in MaStR snapshot
28 Sept 2026
Planned commissioning
31 Dec 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Conservative group — Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 28 Sept 2026
MaStR unit IDs: SEE988229123277, SEE950092867503
Commercial signals (2): cmuln98zx1151wtus5shriah3, cmuln98zy115pwtusvzb5s1z7

Grouping basisConservative group
Supporting registry evidence: Same planned/commissioning date on every unit
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
58Lead relevance · Moderate

Why this ranks here. Mid-sized 14.4 MW signal and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance58

  • Project scale (MW)13
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence3

Signal materiality35

  • Event type20
  • MW affected10
  • Units affected5

New planned wind development signal — 2 units / 14.4 MW

Diemelstadt, Hessen · Operator: Registered operator name not resolved

2 planned units · 14.4 MW · First observed 28 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 25 Sept 2028

2 new planned wind units totalling 14.4 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
14.4 MW
Capacity per unit
7.2 MW each
First observed in MaStR snapshot
28 Sept 2026
Planned commissioning
25 Sept 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 28 Sept 2026
MaStR unit IDs: SEE988237470554, SEE919926771614
Commercial signals (2): cmuln98zx1153wtusxomcfhe5, cmuln98zy115ewtus78iuhnxi

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Capacity change
56Lead relevance · Moderate

Why this ranks here. The registered operator is known. It affects only one 7 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance56

  • Project scale (MW)9
  • Event type14
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change5

Signal materiality45

  • Event type18
  • Size of change20
  • MW affected7

Registered wind capacity increased (+2.74 MW) — 7 MW

Hattgenstein, Rheinland-Pfalz · Operator: GERES Power III GmbH

1 unit · 7 MW

Wind · Wind turbine (horizontal-axis)

Registered capacity changed from 4.26 MW to 7 MW (+2.74 MW, +64%).

A larger registered capacity may indicate a changed project design, turbine or equipment choice, or grid-connection scope, and could affect engineering and equipment requirements.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Design / technologyGrid connectionEngineeringEquipment sizing
Design change?Permit & grid documentsDeveloper updates
Facts, hypotheses and how to verify
Registered capacity
4.26 MW → 7 MW (+2.74 MW / +64%)
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Check whether the change reflects a design or turbine-model change
  • Compare with permit and grid-connection documents
  • Look for recent developer announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 25 Sept 2026 → 28 Sept 2026
MaStR unit IDs: SEE947916503273
Commercial signals (1): cmuln98zy115owtus6mrsk9p9

Grouping basisSingle unit
A single MaStR registration.
Schedule change
48Lead relevance · Moderate

Why this ranks here. The registered operator is known. Small combined capacity (3.12 MW); no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance48

  • Project scale (MW)6
  • Event type8
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3
  • Size of change3

Signal materiality36

  • Event type16
  • Size of change10
  • MW affected5
  • Units affected5

Commissioning delayed by up to 44 days — 2 units / 3.12 MW

Lauchringen, Baden-Württemberg · Operator: Schwab Energie GmbH

2 units · 3.12 MW

Biomass · Verbrennungsmotor

Planned commissioning: 01 Sept 2026 → 15 Oct 2026 (+44 days)

2 biomass units registered a later planned commissioning date (+44 days).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
2
Planned commissioning (same for every unit)
01 Sept 2026 → 15 Oct 2026 (+44 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“schwab energie gmbh satellit bhkw…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 25 Sept 2026 → 28 Sept 2026
MaStR unit IDs: SEE977055597413, SEE921553748501
Commercial signals (2): cmuln98zx1152wtusnl5m9edy, cmuln98zy115fwtusxy5otiip

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“schwab energie gmbh satellit bhkw…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

New developments (3)

New planned asset
57Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset and the registered operator is known. It affects only one 7 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance57

  • Project scale (MW)9
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality27

  • Event type20
  • MW affected7

New planned wind unit — 7 MW — MaStR SEE922388529358

Altenbeken, Nordrhein-Westfalen · Operator: HBB GmbH & Co. KG

1 planned unit · 7 MW · First observed 28 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Jun 2028

A new planned wind unit of 7 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
7 MW
First observed in MaStR snapshot
28 Sept 2026
Planned commissioning
30 Jun 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 28 Sept 2026
MaStR unit IDs: SEE922388529358
Commercial signals (1): cmuln98zy115gwtus9pg95rpe

Grouping basisSingle unit
A single MaStR registration.
New planned asset
57Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset and the registered operator is known. It affects only one 7 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance57

  • Project scale (MW)9
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality27

  • Event type20
  • MW affected7

New planned wind unit — 7 MW — MaStR SEE911995436272

Altenbeken, Nordrhein-Westfalen · Operator: BKV Windgemeinschaft GmbH & Co. KG

1 planned unit · 7 MW · First observed 28 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Jun 2028

A new planned wind unit of 7 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
7 MW
First observed in MaStR snapshot
28 Sept 2026
Planned commissioning
30 Jun 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 28 Sept 2026
MaStR unit IDs: SEE911995436272
Commercial signals (1): cmuln98zx115bwtusqfasbgko

Grouping basisSingle unit
A single MaStR registration.
New planned asset
56Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset and the registered operator is known. It affects only one 6 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance56

  • Project scale (MW)8
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality27

  • Event type20
  • MW affected7

New planned wind unit — 6 MW

Eslohe (Sauerland), Nordrhein-Westfalen · Operator: Ketten Wulf Betriebs GmbH

1 planned unit · 6 MW · First observed 28 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 06 Dec 2028

A new planned wind unit of 6 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
6 MW
First observed in MaStR snapshot
28 Sept 2026
Planned commissioning
06 Dec 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 28 Sept 2026
MaStR unit IDs: SEE960768040505
Commercial signals (1): cmuln98zy115uwtussba617nt

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Major schedule changes (2)

Schedule change
48Lead relevance · Moderate

Why this ranks here. The registered operator is known. It affects only one 7.2 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance48

  • Project scale (MW)9
  • Event type8
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change3

Signal materiality35

  • Event type16
  • Size of change12
  • MW affected7

Commissioning delayed by 67 days — 7.2 MW

Raesfeld, Nordrhein-Westfalen · Operator: Windenergie Erler Bruch GmbH & Co. KG

1 unit · 7.2 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Sept 2026 → Nov 2026 (+67 days)

The registered planned commissioning date moved by +67 days (Sept 2026 → Nov 2026).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Planned commissioning
Sept 2026 → Nov 2026 (+67 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 25 Sept 2026 → 28 Sept 2026
MaStR unit IDs: SEE962389665044
Commercial signals (1): cmuln98zx114vwtus1ssmm1yz

Grouping basisSingle unit
A single MaStR registration.
Schedule change
48Lead relevance · Moderate

Why this ranks here. The registered operator is known. It affects only one 7.2 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance48

  • Project scale (MW)9
  • Event type8
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change3

Signal materiality34

  • Event type16
  • Size of change11
  • MW affected7

Commissioning delayed by 50 days — 7.2 MW

Borken, Nordrhein-Westfalen · Operator: Windenergie Hee GmbH & Co. KG

1 unit · 7.2 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 10 Sept 2026 → 30 Oct 2026 (+50 days)

The registered planned commissioning date moved by +50 days (10 Sept 2026 → 30 Oct 2026).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Planned commissioning
10 Sept 2026 → 30 Oct 2026 (+50 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 25 Sept 2026 → 28 Sept 2026
MaStR unit IDs: SEE931482209714
Commercial signals (1): cmuln98zy115hwtus60qkt38e

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Operator / company changes (2)

Multiple changes
47Lead relevance · Moderate

Why this ranks here. Operator and commissioning changes recorded together on the same units and the registered operator is known. It affects only one 4.26 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance47

  • Project scale (MW)7
  • Event type13
  • Lifecycle stage4
  • Recency8
  • Operator identified10
  • Several changes together5

Signal materiality26

  • Event type14
  • MW affected6
  • Several changes together6

Multiple registry changes (operator + commissioning) — 4.26 MW

Brilon, Nordrhein-Westfalen · Operator: Windfang Energie eG

1 unit · 4.26 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 1 wind unit. 1 wind unit (4.26 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 25 Sept 2026.

Several registry changes were recorded together on the same units. That may indicate a substantive update to the project rather than a routine correction, and is worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligenceO&M
Company registerSale / restructuring newsRelated entities?MaStR record
Facts, hypotheses and how to verify
Previous registered operator
Windfang Planungs- Betriebs- und Infrastruktur GmbH & Co. KG
New registered operator
Windfang Energie eG
Registered capacity
4.26 MW
Commissioning date
25 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Confirm operating status and commissioning date in the official MaStR record
  • Check whether the previous and new operators are related entities
  • Identify the operating company and public information on service arrangements
  • Search for announcements of a sale, financing or restructuring
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 25 Sept 2026 → 28 Sept 2026
MaStR unit IDs: SEE967436681510
Commercial signals (2): cmuln98zx114xwtusjz7ivdit, cmuln98zx114wwtuspfxudn7r

Grouping basisSingle unit
Stable MaStR location ID: SEL944870306445
A single MaStR registration.
Operator change
43Lead relevance · Low

Why this ranks here. Operator identity is unresolved, which reduces immediate actionability; it affects only one 5.7 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance43

  • Project scale (MW)8
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified4

Signal materiality21

  • Event type14
  • MW affected7

Registered operator changed on a wind unit — 5.7 MW

Möhnesee, Nordrhein-Westfalen · Operator: Registered operator name not resolved

1 unit · 5.7 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 1 wind unit.

A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligence
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Previous registered operator
Schlotweg Wind GbR
New registered operator
Operator ID ABR949961155872 (name not resolved)
  • Project development or development-management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 25 Sept 2026 → 28 Sept 2026
MaStR unit IDs: SEE993759158583
Commercial signals (1): cmuln98zx1156wtusm9t9wi1s

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Recently commissioned assets (5)

Commissioned asset
46Lead relevance · Moderate

Why this ranks here. Mid-sized 17.1 MW signal, 3 registrations moving together and the registered operator is known. Already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance46

  • Project scale (MW)14
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10
  • Multi-unit evidence5

Signal materiality30

  • Event type12
  • MW affected10
  • Units affected8

3 wind units commissioned — 3 units / 17.1 MW

Loop, Schleswig-Holstein · Operator: Windpark Loop-Schönbek GmbH & Co. KG

3 units · 17.1 MW

Wind · Wind turbine (horizontal-axis)

3 wind units (17.1 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 24 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Units commissioned
3
Total registered capacity
17.1 MW
Commissioning date
24 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“loop schönbek…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: 25 Sept 2026 → 28 Sept 2026
MaStR unit IDs: SEE942485897464, SEE993155203030, SEE939131563668
Commercial signals (3): cmuln98zy115nwtusgbc84gme, cmuln98zx1155wtuslhpm9kfb, cmuln98zy115mwtus876j65zv

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“loop schönbek…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Commissioned asset
42Lead relevance · Low

Why this ranks here. The registered operator is known. Small combined capacity (11.4 MW); already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance42

  • Project scale (MW)12
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10
  • Multi-unit evidence3

Signal materiality26

  • Event type12
  • MW affected9
  • Units affected5

2 wind units commissioned — 2 units / 11.4 MW

Schönbek, Schleswig-Holstein · Operator: Windpark Loop-Schönbek GmbH & Co. KG

2 units · 11.4 MW

Wind · Wind turbine (horizontal-axis)

2 wind units (11.4 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 24 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Units commissioned
2
Total registered capacity
11.4 MW
Commissioning date
24 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“loop schönbek…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 25 Sept 2026 → 28 Sept 2026
MaStR unit IDs: SEE988240479391, SEE932692668735
Commercial signals (2): cmuln98zx1154wtusf1t2bl63, cmuln98zy115iwtusp3lwe0l1

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“loop schönbek…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Commissioned asset
40Lead relevance · Low

Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance40

  • Project scale (MW)13
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality22

  • Event type12
  • MW affected10

Wind unit commissioned — 15 MW — MaStR SEE934554297022

Ausschließliche Wirtschaftszone · Operator: Windanker GmbH

1 unit · 15 MW

Wind · Wind turbine (horizontal-axis)

1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 08 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
15 MW
Commissioning date
08 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 25 Sept 2026 → 28 Sept 2026
MaStR unit IDs: SEE934554297022
Commercial signals (1): cmuln98zy115jwtusx64yw7q9

Grouping basisSingle unit
Stable MaStR location ID: SEL911145429963
A single MaStR registration.
Commissioned asset
40Lead relevance · Low

Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance40

  • Project scale (MW)13
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality22

  • Event type12
  • MW affected10

Wind unit commissioned — 15 MW — MaStR SEE901006060237

Ausschließliche Wirtschaftszone · Operator: Windanker GmbH

1 unit · 15 MW

Wind · Wind turbine (horizontal-axis)

1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 02 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
15 MW
Commissioning date
02 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 25 Sept 2026 → 28 Sept 2026
MaStR unit IDs: SEE901006060237
Commercial signals (1): cmuln98zx1157wtusv9zq5l0z

Grouping basisSingle unit
Stable MaStR location ID: SEL947856691825
A single MaStR registration.
Commissioned asset
40Lead relevance · Low

Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance40

  • Project scale (MW)13
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality22

  • Event type12
  • MW affected10

Wind unit commissioned — 15 MW — MaStR SEE956742892048

Ausschließliche Wirtschaftszone · Operator: Windanker GmbH

1 unit · 15 MW

Wind · Wind turbine (horizontal-axis)

1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 29 Aug 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
15 MW
Commissioning date
29 Aug 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 25 Sept 2026 → 28 Sept 2026
MaStR unit IDs: SEE956742892048
Commercial signals (1): cmuln98zy115swtusearoldby

Grouping basisSingle unit
Stable MaStR location ID: SEL999501950382
A single MaStR registration.
↑ Back to top

Other registry changes (1)

Smaller registry changes, listed for completeness.

Schedule change
42Lead relevance · Low

Why this ranks here. The registered operator is known. It affects only one 7.2 MW unit; short date shifts are common registry maintenance; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance42

  • Project scale (MW)9
  • Event type4
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change1

Signal materiality25

  • Event type16
  • Size of change2
  • MW affected7

Commissioning delayed by 4 days — 7.2 MW

Borken, Nordrhein-Westfalen · Operator: Windenergie Schlatt GmbH & Co. KG

1 unit · 7.2 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 24 Sept 2026 → 28 Sept 2026 (+4 days)

The registered planned commissioning date moved by +4 days (24 Sept 2026 → 28 Sept 2026).

A short date shift is common and may be routine registry maintenance. Worth attention mainly if it is part of a wider pattern.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Planned commissioning
24 Sept 2026 → 28 Sept 2026 (+4 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 25 Sept 2026 → 28 Sept 2026
MaStR unit IDs: SEE915492311551
Commercial signals (1): cmuln98zx115cwtuswodeww6k

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.