Schedule change66Lead relevance · High
Why this ranks high. Mid-sized 18 MW signal, 4 registrations moving together, unusually large schedule shift (397 days) and the registered operator is known. It may still reflect a registry correction rather than a new commercial need.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance66
- Project scale (MW)14
- Event type12
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence6
- Size of change6
Signal materiality59
- Event type16
- Size of change22
- MW affected11
- Units affected10
Commissioning delayed by up to 397 days — 4 units / 18 MW
Olsberg, Nordrhein-Westfalen · Operator: Windpark Olsberg GmbH & Co. KG
4 units · 18 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: Oct 2027 → Dec 2028 (+397 days)
What changed
4 wind units registered a later planned commissioning date (+397 days).
Why it may matter
A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 4
- Planned commissioning (same for every unit)
- Oct 2027 → Dec 2028 (+397 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 4 registered MaStR units
Snapshot transition: 28 Oct 2026 → 3 Nov 2026
MaStR unit IDs: SEE917426735488, SEE919438590697, SEE952886224813, SEE962305753411
Commercial signals (4): cmw0azqhk13eywtvoks2spsu0, cmw0azqhk13f2wtvomwvaq26z, cmw0azqhm13g7wtvoeattmr0k, cmw0azqhm13gjwtvon1jsmv0f
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (4)
Schedule change66Lead relevance · High
Why this ranks high. Mid-sized 27.2 MW signal, 4 registrations moving together and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance66
- Project scale (MW)16
- Event type12
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence6
- Size of change4
Signal materiality55
- Event type16
- Size of change17
- MW affected12
- Units affected10
Commissioning delayed by up to 161 days — 4 units / 27.2 MW
Twistetal, Hessen · Operator: UGE Matzenhöhe GmbH & Co. KG Umweltgerechte Energie
4 units · 27.2 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 05 Oct – 03 Dec 2026
What changed
4 wind units registered a later planned commissioning date (+148 days to +161 days).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 4
- Planned commissioning before
- 05 Oct – 03 Dec 2026
- Planned commissioning now
- 15 Mar – 30 Apr 2027
- Shift per unit
- +148 to +161 days
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“matzenhöhe…”); Identical registered capacity; Planned/commissioning dates within 46 days of each other
Presentation group: 4 registered MaStR units
Snapshot transition: 28 Oct 2026 → 3 Nov 2026
MaStR unit IDs: SEE933007843762, SEE938640213439, SEE969837388845, SEE995601388452
Commercial signals (4): cmw0azqhl13frwtvotjmhyvt2, cmw0azqhl13ftwtvoilglksiu, cmw0azqhn13gqwtvohmuz6egk, cmw0azqhp13hwwtvopzq87g4e
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“matzenhöhe…”); Identical registered capacity; Planned/commissioning dates within 46 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (4)
Schedule change64Lead relevance · High
Why this ranks high. Mid-sized 30 MW signal and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance64
- Project scale (MW)17
- Event type12
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence3
- Size of change4
Signal materiality48
- Event type16
- Size of change14
- MW affected13
- Units affected5
Commissioning delayed by up to 91 days — 2 units / 30 MW
Ausschließliche Wirtschaftszone · Operator: EnBW He Dreiht GmbH & Co. KG
2 units · 30 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: Oct 2026 → Dec 2026 (+91 days)
What changed
2 wind units registered a later planned commissioning date (+91 days).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 2
- Planned commissioning (same for every unit)
- Oct 2026 → Dec 2026 (+91 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 28 Oct 2026 → 3 Nov 2026
MaStR unit IDs: SEE983599520046, SEE998812552131
Commercial signals (2): cmw0azqho13h8wtvo12nlzeq2, cmw0azqhp13hywtvodzj4up9r
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (2)
Schedule change62Lead relevance · High
Why this ranks high. Mid-sized 14.4 MW signal, 3 registrations moving together and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance62
- Project scale (MW)13
- Event type12
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence5
- Size of change4
Signal materiality48
- Event type16
- Size of change14
- MW affected10
- Units affected8
Commissioning delayed by up to 91 days — 3 units / 14.4 MW
Schnaudertal, Sachsen-Anhalt · Operator: EE Schnaudertal GmbH & Co. KG
3 units · 14.4 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 14 Oct – 30 Oct 2026
What changed
3 wind units registered a later planned commissioning date (+87 days to +91 days).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 3
- Planned commissioning before
- 14 Oct – 30 Oct 2026
- Planned commissioning now
- 11 Jan – 29 Jan 2027
- Shift per unit
- +87 to +91 days
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Planned/commissioning dates within 18 days of each other
Presentation group: 3 registered MaStR units
Snapshot transition: 28 Oct 2026 → 3 Nov 2026
MaStR unit IDs: SEE919923544457, SEE956212762963, SEE980980753830
Commercial signals (3): cmw0azqhk13f3wtvohg2lbj32, cmw0azqhm13g8wtvo32675o0i, cmw0azqhn13h4wtvosggk5x8i
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Planned/commissioning dates within 18 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (3)
Schedule change61Lead relevance · High
Why this ranks high. Mid-sized 24.8 MW signal, 4 registrations moving together and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance61
- Project scale (MW)16
- Event type8
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence6
- Size of change3
Signal materiality51
- Event type16
- Size of change13
- MW affected12
- Units affected10
Commissioning delayed by up to 77 days — 4 units / 24.8 MW
Willebadessen, Nordrhein-Westfalen · Operator: ENGIE Windpark Peckelsheim GmbH
4 units · 24.8 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 15 Oct – 01 Nov 2026
What changed
4 wind units registered a later planned commissioning date (+60 days to +77 days).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 4
- Planned commissioning before
- 15 Oct – 01 Nov 2026
- Planned commissioning now
- 31 Dec 2026
- Shift per unit
- +60 to +77 days
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 4 registered MaStR units
Snapshot transition: 28 Oct 2026 → 3 Nov 2026
MaStR unit IDs: SEE919408612350, SEE971204353172, SEE972294789810, SEE996134566553
Commercial signals (4): cmw0azqhk13f1wtvo1t7bh9ku, cmw0azqhn13grwtvo3c8vodtk, cmw0azqhn13gvwtvomoqz7hl5, cmw0azqhp13hxwtvoug1d3mrw
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (4)
Schedule change58Lead relevance · Moderate
Why this ranks here. Mid-sized 14.4 MW signal, 4 registrations moving together and the registered operator is known. No external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance58
- Project scale (MW)13
- Event type8
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence6
- Size of change3
Signal materiality49
- Event type16
- Size of change13
- MW affected10
- Units affected10
Commissioning delayed by up to 76 days — 4 units / 14.4 MW
Erftstadt, Nordrhein-Westfalen · Operator: Energiepark Erftstadt-Erp I GmbH & Co. KG
4 units · 14.4 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: Oct 2026 → Dec 2026 (+76 days)
What changed
4 wind units registered a later planned commissioning date (+76 days).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 4
- Planned commissioning (same for every unit)
- Oct 2026 → Dec 2026 (+76 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 4 registered MaStR units
Snapshot transition: 28 Oct 2026 → 3 Nov 2026
MaStR unit IDs: SEE907462005508, SEE916200538826, SEE917123022393, SEE921980270941
Commercial signals (4): cmw0azqhj13enwtvo00j7afuc, cmw0azqhk13ewwtvoshrfkoml, cmw0azqhk13exwtvo6eu8ui8r, cmw0azqhk13fbwtvo96mqtlrb
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (4)
Schedule change58Lead relevance · Moderate
Why this ranks here. Mid-sized 16.68 MW signal, 3 registrations moving together and the registered operator is known. No external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance58
- Project scale (MW)14
- Event type8
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence5
- Size of change3
Signal materiality47
- Event type16
- Size of change13
- MW affected10
- Units affected8
Commissioning delayed by up to 78 days — 3 units / 16.68 MW
Mehring, Rheinland-Pfalz · Operator: Windpark Mehringer Höhe GmbH & Co. KG
3 units · 16.68 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 25 Sept – 05 Nov 2026
What changed
3 wind units registered a later planned commissioning date (+70 days to +78 days).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 3
- Planned commissioning before
- 25 Sept – 05 Nov 2026
- Planned commissioning now
- 04 Dec 2026 – 22 Jan 2027
- Shift per unit
- +70 to +78 days
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Planned/commissioning dates within 49 days of each other
Presentation group: 3 registered MaStR units
Snapshot transition: 28 Oct 2026 → 3 Nov 2026
MaStR unit IDs: SEE923892472925, SEE947496605527, SEE957483549192
Commercial signals (3): cmw0azqhl13fiwtvoe1ij1xt3, cmw0azqhl13fwwtvof94x8woy, cmw0azqhm13g9wtvobhhm5ypq
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Planned/commissioning dates within 49 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (3)
Schedule change57Lead relevance · Moderate
Why this ranks here. Mid-sized 16.68 MW signal, 3 registrations moving together and the registered operator is known. No external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance57
- Project scale (MW)14
- Event type8
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence5
- Size of change2
Signal materiality42
- Event type16
- Size of change8
- MW affected10
- Units affected8
Commissioning delayed by up to 31 days — 3 units / 16.68 MW
Wittgert, Rheinland-Pfalz · Operator: Windpark Haiderbachhöhe GmbH & Co. KG
3 units · 16.68 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 14 Oct 2026 → 14 Nov 2026 (+31 days)
What changed
3 wind units registered a later planned commissioning date (+31 days).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 3
- Planned commissioning (same for every unit)
- 14 Oct 2026 → 14 Nov 2026 (+31 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: 28 Oct 2026 → 3 Nov 2026
MaStR unit IDs: SEE920422933673, SEE984272177441, SEE986742691730
Commercial signals (3): cmw0azqhk13f7wtvo8y7nd3bu, cmw0azqho13hawtvo593qmm4r, cmw0azqho13hcwtvoti8xi7jh
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (3)
Schedule change56Lead relevance · Moderate
Why this ranks here. 3 registrations moving together and the registered operator is known. Small combined capacity (12.78 MW); no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance56
- Project scale (MW)12
- Event type8
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence5
- Size of change3
Signal materiality45
- Event type16
- Size of change12
- MW affected9
- Units affected8
Commissioning delayed by up to 61 days — 3 units / 12.78 MW
Hasenmoor, Schleswig-Holstein · Operator: Windpark GmbH & Co. Hasenmoor KG
3 units · 12.78 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: Oct 2026 → Dec 2026 (+61 days)
What changed
3 wind units registered a later planned commissioning date (+61 days).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 3
- Planned commissioning (same for every unit)
- Oct 2026 → Dec 2026 (+61 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“hasenmoor e wea…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: 28 Oct 2026 → 3 Nov 2026
MaStR unit IDs: SEE920016952578, SEE950764073393, SEE976443544732
Commercial signals (3): cmw0azqhk13f5wtvoudyipcvn, cmw0azqhm13g2wtvo2sfvcer6, cmw0azqhn13gzwtvou0mmov2n
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“hasenmoor e wea…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (3)
Schedule change56Lead relevance · Moderate
Why this ranks here. 3 registrations moving together and the registered operator is known. Small combined capacity (12.78 MW); no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance56
- Project scale (MW)12
- Event type8
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence5
- Size of change3
Signal materiality45
- Event type16
- Size of change12
- MW affected9
- Units affected8
Commissioning delayed by up to 61 days — 3 units / 12.78 MW
Struvenhütten, Schleswig-Holstein · Operator: Windpark GmbH & Co. Hasenmoor KG
3 units · 12.78 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: Oct 2026 → Dec 2026 (+61 days)
What changed
3 wind units registered a later planned commissioning date (+61 days).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 3
- Planned commissioning (same for every unit)
- Oct 2026 → Dec 2026 (+61 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“struvenhütten e wea…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: 28 Oct 2026 → 3 Nov 2026
MaStR unit IDs: SEE929232817296, SEE952115711718, SEE958398584360
Commercial signals (3): cmw0azqhl13fmwtvoauh6yttf, cmw0azqhm13g5wtvo8jjmr3uz, cmw0azqhm13gewtvo98nuzy6d
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“struvenhütten e wea…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (3)
Schedule change55Lead relevance · Moderate
Why this ranks here. Unusually large schedule shift (365 days) and the registered operator is known. It affects only one 7.2 MW unit; it may still reflect a registry correction rather than a new commercial need; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance55
- Project scale (MW)9
- Event type12
- Lifecycle stage10
- Recency8
- Operator identified10
- Size of change6
Signal materiality45
- Event type16
- Size of change22
- MW affected7
Commissioning delayed by 365 days — 7.2 MW
Melbeck, Niedersachsen · Operator: Bürgerwindpark Häcklingen-Melbeck Betriebsgesellschaft mbH & Co. KG
1 unit · 7.2 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: Oct 2026 → Oct 2027 (+365 days)
What changed
The registered planned commissioning date moved by +365 days (Oct 2026 → Oct 2027).
Why it may matter
A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Planned commissioning
- Oct 2026 → Oct 2027 (+365 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 28 Oct 2026 → 3 Nov 2026
MaStR unit IDs: SEE987670223895
Commercial signals (1): cmw0azqho13hfwtvoyzuypdcj
Grouping basisSingle unit
A single MaStR registration.
Underlying registrations (1)
Schedule change55Lead relevance · Moderate
Why this ranks here. Unusually large schedule shift (391 days) and the registered operator is known. It affects only one 6.8 MW unit; it may still reflect a registry correction rather than a new commercial need; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance55
- Project scale (MW)9
- Event type12
- Lifecycle stage10
- Recency8
- Operator identified10
- Size of change6
Signal materiality45
- Event type16
- Size of change22
- MW affected7
Commissioning delayed by 391 days — 6.8 MW
Brakel, Nordrhein-Westfalen · Operator: Windpark Möncheberg GmbH & Co. KG
1 unit · 6.8 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: Jun 2027 → Jul 2028 (+391 days)
What changed
The registered planned commissioning date moved by +391 days (Jun 2027 → Jul 2028).
Why it may matter
A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Planned commissioning
- Jun 2027 → Jul 2028 (+391 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 28 Oct 2026 → 3 Nov 2026
MaStR unit IDs: SEE978362246452
Commercial signals (1): cmw0azqhn13h3wtvoa9rdzk7h
Grouping basisSingle unit
A single MaStR registration.
Underlying registrations (1)