New planned asset
70Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance70

  • Project scale (MW)15
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5
  • External verification2

Signal materiality40

  • Event type20
  • MW affected12
  • Units affected8

New planned hydro development signal — 3 units / 22.8 MW

Forbach, Baden-Württemberg · Operator: EnBW Energie Baden-Württemberg AG

3 planned units · 22.8 MW · First observed 03 Nov 2026

Energy carrierWasser
Registered operatorEnBW Energie Baden-Württemberg AG

3 new planned hydro units totalling 22.8 MW were first observed in this MaStR snapshot.

Why this ranks high. Mid-sized 22.8 MW signal, 3 registrations moving together, freshly registered planned asset and the registered operator is known. External corroboration is only partial.

External verification: Partially corroborated

Some external sources mention a energy development in Forbach associated with EnBW Energie Baden-Württemberg AG, but the match to the registered project is incomplete. Public project evidence found as early as 16 May 2023; GridGraph first observed the MaStR registration on 3 Nov 2026. No public procurement evidence was found in this verification run.

Project company
EnBW Energie Baden-Württemberg AG
Developer
EnBW Energie Baden-Württemberg AG
Project evidence
Partial
Commercial evidence
None found

No public procurement evidence was found in this verification run.

6 independent external sources.

Registry lead relevance: 68 → After external verification: 70 (+2) +2: identity or project only partially corroborated.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Developer servicesGrid & electricalEngineeringCivil / BOPMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Planned units first observed
3
Total registered capacity
22.8 MW
Capacity per unit
3.1–13 MW per unit
First observed in MaStR snapshot
03 Nov 2026
Planned commissioning
31 Dec 2027

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“psw forbach murgwerk m…”); Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Energy carrier (MaStR)
Wasser
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: partially corroborated; 6 independent external sources at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

First tracked snapshot → 3 Nov 2026