Intelligence brief

German Energy Asset Change Intelligence — 2026-09-29

A curated, source-traceable view of registered MaStR asset updates.

Coverage: 28 Sept → 29 Sept 2026Latest MaStR snapshot: 29 Sept 2026Snapshots compared: 2

Covers one snapshot-to-snapshot transition. Do not compare its counts with weekly or multi-day reports.

Source coverageLatest MaStR snapshot: 29 Sept 2026Changes compared with: 28 Sept 2026Brief generated: 29 Sept 2026
8Top opportunities shown
The diversified selection shown in the Top section. 36 grouped events score above the investigation threshold in total. A registry signal only: it does not establish procurement activity or buyer intent.
23New development signals
9Major schedule shifts
4Operator changes
4Commissioning events
351.59 MWNewly planned capacity

39 grouped events (units merged into likely site groups; not confirmed projects). Unit-level records: 92 registry changes across 88 registrations, 550.91 MW registered capacity.

Start here

  1. 76New planned wind development signal — 8 units / 57.6 MW · Sundern (Sauerland), Nordrhein-Westfalen
  2. 74New planned wind development signal — 8 units / 39.3 MW · Horstmar, Nordrhein-Westfalen
  3. 74New planned wind development signal — 6 units / 42 MW · Marburg, Hessen
  4. 70New planned wind development signal — 4 units / 27.2 MW · Brand-Erbisdorf, Sachsen
  5. 65Commissioning delayed by up to 365 days — 3 units / 18 MW · Horath, Rheinland-Pfalz

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

Top opportunities to investigate (8)

Selected from the highest-scoring investigation signals, with category diversification to avoid repetitive results. Cards are ordered by opportunity score; a higher-scoring signal of an already well-represented type may appear in a section below. Scores are deterministic and are not probabilities. Everything here is a starting point for verification, not evidence of demand.

New planned asset
76Lead relevance · Very high

Why this ranks high. Large 57.6 MW multi-unit signal, 8 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance76

  • Project scale (MW)21
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence7

Signal materiality49

  • Event type20
  • MW affected16
  • Units affected13

New planned wind development signal — 8 units / 57.6 MW

Sundern (Sauerland), Nordrhein-Westfalen · Operator: VERBUND Green Power Deutschland GmbH

8 planned units · 57.6 MW · First observed 29 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Dec – 31 Dec 2028

8 new planned wind units totalling 57.6 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
8
Total registered capacity
57.6 MW
Capacity per unit
7.2 MW each
First observed in MaStR snapshot
29 Sept 2026
Planned commissioning between
30 Dec – 31 Dec 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“eslohe…”); Identical registered capacity; Planned/commissioning dates within 1 days of each other
Presentation group: 8 registered MaStR units
Snapshot transition: First tracked snapshot → 29 Sept 2026
MaStR unit IDs: SEE984384994745, SEE903864499457, SEE965208914835, SEE962329654343, SEE999257405532, SEE949531422854, SEE947163200260, SEE946462260548
Commercial signals (8): cmum4wg3o3mi5wtusnbjgzb2o, cmum4wg3n3mh5wtusldfrfr2m, cmum4wg3o3mhqwtusm2gkscdk, cmum4wg3o3mhwwtuspzxbl027, cmum4wg3p3minwtusbuwaurjn, cmum4wg3q3mixwtus8zf9ujlh, cmum4wg3q3mizwtusybwy5xm0, cmum4wg3q3mj0wtusm50ryx5s

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“eslohe…”); Identical registered capacity; Planned/commissioning dates within 1 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
74Lead relevance · High

Why this ranks high. Mid-sized 39.3 MW signal, 8 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance74

  • Project scale (MW)19
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence7

Signal materiality47

  • Event type20
  • MW affected14
  • Units affected13

New planned wind development signal — 8 units / 39.3 MW

Horstmar, Nordrhein-Westfalen · Operator: Windpark Schöppinger Berg GmbH & Co. KG

8 planned units · 39.3 MW · First observed 29 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Jan 2029

8 new planned wind units totalling 39.3 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
8
Total registered capacity
39.3 MW
Capacity per unit
4.26–6 MW per unit
First observed in MaStR snapshot
29 Sept 2026
Planned commissioning
01 Jan 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“repowering…”); Same planned/commissioning date on every unit
Presentation group: 8 registered MaStR units
Snapshot transition: First tracked snapshot → 29 Sept 2026
MaStR unit IDs: SEE959108034366, SEE905789814834, SEE955260246258, SEE942627960520, SEE996479529213, SEE981950209173, SEE940961906839, SEE999627549163
Commercial signals (8): cmum4wg3o3mhzwtus19d9e8fq, cmum4wg3n3mh7wtus1t57a5pj, cmum4wg3p3mirwtusjdz6m1zu, cmum4wg3q3mj1wtusn3k0biv0, cmum4wg3p3milwtusnk0anzps, cmum4wg3o3mi4wtusniy1amk8, cmum4wg3q3mj7wtus7ljaup4v, cmum4wg3p3miowtuswn8xx87c

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“repowering…”); Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
74Lead relevance · High

Why this ranks high. Mid-sized 42 MW signal, 6 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance74

  • Project scale (MW)19
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence7

Signal materiality46

  • Event type20
  • MW affected14
  • Units affected12

New planned wind development signal — 6 units / 42 MW

Marburg, Hessen · Operator: INNEXIS Marburg GmbH

6 planned units · 42 MW · First observed 29 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 18 Sept 2029

6 new planned wind units totalling 42 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
6
Total registered capacity
42 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
29 Sept 2026
Planned commissioning
18 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 6 registered MaStR units
Snapshot transition: First tracked snapshot → 29 Sept 2026
MaStR unit IDs: SEE965306346835, SEE911402623516, SEE959836534169, SEE951336104873, SEE950553465736, SEE936588452781
Commercial signals (6): cmum4wg3n3mhpwtus02rm2brr, cmum4wg3n3mhbwtuscoepz2ee, cmum4wg3o3mhywtus90i9puum, cmum4wg3p3miuwtust3v0fgm1, cmum4wg3p3mivwtuszmt7oy9r, cmum4wg3q3mjawtusow4kqgy2

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
70Lead relevance · High

Why this ranks high. Mid-sized 27.2 MW signal, 4 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance70

  • Project scale (MW)16
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality42

  • Event type20
  • MW affected12
  • Units affected10

New planned wind development signal — 4 units / 27.2 MW

Brand-Erbisdorf, Sachsen · Operator: UKA Umweltgerechte Kraftanlagen GmbH & Co. KG

4 planned units · 27.2 MW · First observed 29 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 02 May – 15 Jun 2029

4 new planned wind units totalling 27.2 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
4
Total registered capacity
27.2 MW
Capacity per unit
6.8 MW each
First observed in MaStR snapshot
29 Sept 2026
Planned commissioning between
02 May – 15 Jun 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“brand erbisdorf…”); Identical registered capacity; Planned/commissioning dates within 44 days of each other
Presentation group: 4 registered MaStR units
Snapshot transition: First tracked snapshot → 29 Sept 2026
MaStR unit IDs: SEE976091880879, SEE995228512858, SEE918921435668, SEE928198348714
Commercial signals (4): cmum4wg3n3mhkwtusb92aewin, cmum4wg3p3miiwtus7bfw2s7c, cmum4wg3q3mjgwtusfgoyby0j, cmum4wg3r3mjkwtusb5u55qn4

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“brand erbisdorf…”); Identical registered capacity; Planned/commissioning dates within 44 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
65Lead relevance · High

Why this ranks high. Mid-sized 18 MW signal, 3 registrations moving together, unusually large schedule shift (365 days) and the registered operator is known. It may still reflect a registry correction rather than a new commercial need.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance65

  • Project scale (MW)14
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5
  • Size of change6

Signal materiality57

  • Event type16
  • Size of change22
  • MW affected11
  • Units affected8

Commissioning delayed by up to 365 days — 3 units / 18 MW

Horath, Rheinland-Pfalz · Operator: Agrowea GmbH & Co. KG

3 units · 18 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Sept 2026 → Sept 2027 (+365 days)

3 wind units registered a later planned commissioning date (+365 days).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
3
Planned commissioning (same for every unit)
Sept 2026 → Sept 2027 (+365 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: 28 Sept 2026 → 29 Sept 2026
MaStR unit IDs: SEE935068545265, SEE937484966266, SEE908520748511
Commercial signals (3): cmum4wg3q3mjcwtus68n1qn2m, cmum4wg3q3mj8wtus9b49jzxc, cmum4wg3n3mh9wtusvvtirwru

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
65Lead relevance · High

Why this ranks high. Mid-sized 21 MW signal, 3 registrations moving together, unusually large schedule shift (228 days) and the registered operator is known. It may still reflect a registry correction rather than a new commercial need.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance65

  • Project scale (MW)15
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5
  • Size of change5

Signal materiality54

  • Event type16
  • Size of change19
  • MW affected11
  • Units affected8

Commissioning delayed by up to 228 days — 3 units / 21 MW

Sien, Rheinland-Pfalz · Operator: Windpark Sien II GmbH & Co. KG

3 units · 21 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Oct 2027 → Jun 2028 (+228 days)

3 wind units registered a later planned commissioning date (+228 days).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
3
Planned commissioning (same for every unit)
Oct 2027 → Jun 2028 (+228 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: 28 Sept 2026 → 29 Sept 2026
MaStR unit IDs: SEE967686694414, SEE936438285750, SEE911740317993
Commercial signals (3): cmum4wg3n3mhnwtusie2vct6a, cmum4wg3q3mjbwtusqt886agh, cmum4wg3n3mhcwtus3u5jkl26

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Operator change
64Lead relevance · High

Why this ranks high. Mid-sized 27.8 MW signal, 5 registrations moving together and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance64

  • Project scale (MW)17
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality37

  • Event type14
  • MW affected12
  • Units affected11

Registered operator changed on 5 wind units — 5 units / 27.8 MW

Heemsen, Niedersachsen · Operator: Qualitas Energy Projekt GmbH

5 units · 27.8 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 5 wind units.

A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligence
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Units with an operator change
5
Previous registered operator
Qualitas Energy IV DevCo GmbH
New registered operator
Qualitas Energy Projekt GmbH
  • Project development or development-management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 5 registered MaStR units
Snapshot transition: 28 Sept 2026 → 29 Sept 2026
MaStR unit IDs: SEE950381370721, SEE987710894634, SEE989730811752, SEE912973654107, SEE979676959090
Commercial signals (5): cmum4wg3q3miwwtus9ctp8yxt, cmum4wg3o3mi9wtuskn668qoq, cmum4wg3p3midwtusrl73eb0e, cmum4wg3n3mhdwtusgbcwp6q2, cmum4wg3o3mhrwtus2tgnhei0

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Multiple changes
61Lead relevance · High

Why this ranks high. Capacity and schedule changes recorded together on the same units and the registered operator is known. It affects only one 7 MW unit.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance61

  • Project scale (MW)9
  • Event type14
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Several changes together5
  • Size of change5

Signal materiality51

  • Event type18
  • Size of change20
  • MW affected7
  • Several changes together6

Multiple registry changes (capacity + schedule) — 7 MW

Katzenelnbogen, Rheinland-Pfalz · Operator: K&S regenerative Energie GmbH & Co.KG

1 unit · 7 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Jan 2029 → May 2029 (+150 days)

Registered capacity changed from 4.26 MW to 7 MW (+2.74 MW, +64%). The registered planned commissioning date moved by +150 days (Jan 2029 → May 2029).

Several registry changes were recorded together on the same units. That may indicate a substantive update to the project rather than a routine correction, and is worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Design / technologyGrid connectionEngineeringEquipment sizingProject schedulingConstruction timing
Design change?Permit & grid documentsDeveloper updatesRegistry correction?
Facts, hypotheses and how to verify
Registered capacity
4.26 MW → 7 MW (+2.74 MW / +64%)
Planned commissioning
Jan 2029 → May 2029 (+150 days)
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Check whether the change reflects a design or turbine-model change
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Compare with permit and grid-connection documents
  • Check permitting and construction status
  • Look for recent developer announcements
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 28 Sept 2026 → 29 Sept 2026
MaStR unit IDs: SEE941512617907
Commercial signals (2): cmum4wg3q3mj6wtushyv01c74, cmum4wg3q3mj5wtusaftuw5e5

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

New developments (12)

New planned asset
68Lead relevance · High

Why this ranks high. Mid-sized 21 MW signal, 3 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance68

  • Project scale (MW)15
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind development signal — 3 units / 21 MW

Titz, Nordrhein-Westfalen · Operator: Windenergie Jansen GmbH

3 planned units · 21 MW · First observed 29 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Nov 2030

3 new planned wind units totalling 21 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
21 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
29 Sept 2026
Planned commissioning
30 Nov 2030
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Related registry activity
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 29 Sept 2026
MaStR unit IDs: SEE962795032096, SEE933702283047, SEE933239484757
Commercial signals (3): cmum4wg3o3mhuwtusvmoixppw, cmum4wg3q3mjdwtusxjtjjg4d, cmum4wg3q3mjfwtuswyuka77i

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
67Lead relevance · High

Why this ranks high. Mid-sized 18.12 MW signal, 3 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance67

  • Project scale (MW)14
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind development signal — 3 units / 18.12 MW

Wesel, Nordrhein-Westfalen · Operator: SL Windenergie GmbH

3 planned units · 18.12 MW · First observed 29 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 24 Sept 2030

3 new planned wind units totalling 18.12 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
18.12 MW
Capacity per unit
5.56–7 MW per unit
First observed in MaStR snapshot
29 Sept 2026
Planned commissioning
24 Sept 2030
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wesel perrich…”); Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 29 Sept 2026
MaStR unit IDs: SEE913860717936, SEE978792722465, SEE932022742005
Commercial signals (3): cmum4wg3n3mhewtusj34nod0w, cmum4wg3n3mhiwtusnhg07mmh, cmum4wg3n3mh3wtusng1bq8g8

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wesel perrich…”); Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
64Lead relevance · High

Why this ranks high. Mid-sized 14.4 MW signal, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance64

  • Project scale (MW)13
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3

Signal materiality35

  • Event type20
  • MW affected10
  • Units affected5

New planned wind development signal — 2 units / 14.4 MW

Ragow-Merz, Brandenburg · Operator: PNE AG

2 planned units · 14.4 MW · First observed 29 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 May 2029

2 new planned wind units totalling 14.4 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
14.4 MW
Capacity per unit
7.2 MW each
First observed in MaStR snapshot
29 Sept 2026
Planned commissioning
30 May 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wp merz m…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 29 Sept 2026
MaStR unit IDs: SEE904334388295, SEE918950283483
Commercial signals (2): cmum4wg3n3mh6wtus05kj19t5, cmum4wg3q3mjhwtuspefp6kj4

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp merz m…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
64Lead relevance · High

Why this ranks high. Mid-sized 14.4 MW signal, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance64

  • Project scale (MW)13
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3

Signal materiality35

  • Event type20
  • MW affected10
  • Units affected5

New planned wind development signal — 2 units / 14.4 MW

Rossau, Sachsen · Operator: Energieanlagen Frank Bündig GmbH

2 planned units · 14.4 MW · First observed 29 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 21 Sept – 30 Sept 2029

2 new planned wind units totalling 14.4 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
14.4 MW
Capacity per unit
7.2 MW each
First observed in MaStR snapshot
29 Sept 2026
Planned commissioning between
21 Sept – 30 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Planned/commissioning dates within 9 days of each other
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 29 Sept 2026
MaStR unit IDs: SEE995088862834, SEE928617639836
Commercial signals (2): cmum4wg3p3mihwtusdx5mhceo, cmum4wg3r3mjlwtus219mgvn0

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Planned/commissioning dates within 9 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
64Lead relevance · High

Why this ranks high. Mid-sized 14 MW signal, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance64

  • Project scale (MW)13
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3

Signal materiality34

  • Event type20
  • MW affected9
  • Units affected5

New planned wind development signal — 2 units / 14 MW

Alpen, Nordrhein-Westfalen · Operator: ABO Energy Windpark 13 GmbH & Co. KG

2 planned units · 14 MW · First observed 29 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 08 Aug 2029

2 new planned wind units totalling 14 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
14 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
29 Sept 2026
Planned commissioning
08 Aug 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“abo energy wp alpen winnethal…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 29 Sept 2026
MaStR unit IDs: SEE986802289020, SEE921614584529
Commercial signals (2): cmum4wg3o3mi7wtusf0e6iecp, cmum4wg3q3mjiwtus0hw1wwe8

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“abo energy wp alpen winnethal…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
57Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; small combined capacity (12 MW); no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance57

  • Project scale (MW)12
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence3

Signal materiality34

  • Event type20
  • MW affected9
  • Units affected5

New planned wind development signal — 2 units / 12 MW

Homberg (Ohm), Hessen · Operator: Registered operator name not resolved

2 planned units · 12 MW · First observed 29 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Dec 2028

2 new planned wind units totalling 12 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
12 MW
Capacity per unit
6 MW each
First observed in MaStR snapshot
29 Sept 2026
Planned commissioning
31 Dec 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“bleidenrod e…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 29 Sept 2026
MaStR unit IDs: SEE999687784498, SEE933686315895
Commercial signals (2): cmum4wg3p3mipwtusapdfa438, cmum4wg3q3mjewtusb5mrgud7

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“bleidenrod e…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
57Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; small combined capacity (11.12 MW); no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance57

  • Project scale (MW)12
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence3

Signal materiality33

  • Event type20
  • MW affected8
  • Units affected5

New planned wind development signal — 2 units / 11.12 MW

Eschenburg, Hessen · Operator: Registered operator name not resolved

2 planned units · 11.12 MW · First observed 29 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 03 Sept 2029

2 new planned wind units totalling 11.12 MW were first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
11.12 MW
Capacity per unit
5.56 MW each
First observed in MaStR snapshot
29 Sept 2026
Planned commissioning
03 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“windpark galgenberg…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 29 Sept 2026
MaStR unit IDs: SEE971425641300, SEE991867852416
Commercial signals (2): cmum4wg3n3mhlwtus4f9zx4ji, cmum4wg3p3mifwtus6s9fuit8

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“windpark galgenberg…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
57Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset and the registered operator is known. It affects only one 7 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance57

  • Project scale (MW)9
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality27

  • Event type20
  • MW affected7

New planned wind unit — 7 MW

Bramsche, Niedersachsen · Operator: AW Windenergie Bramsche GmbH & Co. KG

1 planned unit · 7 MW · First observed 29 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Jan 2029

A new planned wind unit of 7 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
7 MW
First observed in MaStR snapshot
29 Sept 2026
Planned commissioning
31 Jan 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 29 Sept 2026
MaStR unit IDs: SEE971145494033
Commercial signals (1): cmum4wg3n3mhmwtusk64cg98p

Grouping basisSingle unit
A single MaStR registration.
New planned asset
57Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset and the registered operator is known. It affects only one 7 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance57

  • Project scale (MW)9
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality27

  • Event type20
  • MW affected7

New planned wind unit — 7 MW — MaStR SEE915343899177

Winterberg, Nordrhein-Westfalen · Operator: VERBUND Green Power Deutschland GmbH

1 planned unit · 7 MW · First observed 29 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Dec 2028

A new planned wind unit of 7 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
7 MW
First observed in MaStR snapshot
29 Sept 2026
Planned commissioning
30 Dec 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 29 Sept 2026
MaStR unit IDs: SEE915343899177
Commercial signals (1): cmum4wg3n3mhgwtusum0ytawr

Grouping basisSingle unit
A single MaStR registration.
New planned asset
57Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset and the registered operator is known. It affects only one 7 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance57

  • Project scale (MW)9
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality27

  • Event type20
  • MW affected7

New planned wind unit — 7 MW — MaStR SEE941784559707

Winterberg, Nordrhein-Westfalen · Operator: VERBUND Green Power Deutschland GmbH

1 planned unit · 7 MW · First observed 29 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Dec 2028

A new planned wind unit of 7 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
7 MW
First observed in MaStR snapshot
29 Sept 2026
Planned commissioning
30 Dec 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 29 Sept 2026
MaStR unit IDs: SEE941784559707
Commercial signals (1): cmum4wg3q3mj4wtus2ao9pod8

Grouping basisSingle unit
A single MaStR registration.
New planned asset
57Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset and the registered operator is known. It affects only one 7 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance57

  • Project scale (MW)9
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality27

  • Event type20
  • MW affected7

New planned wind unit — 7 MW — MaStR SEE947429995534

Winterberg, Nordrhein-Westfalen · Operator: VERBUND Green Power Deutschland GmbH

1 planned unit · 7 MW · First observed 29 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Dec 2028

A new planned wind unit of 7 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
7 MW
First observed in MaStR snapshot
29 Sept 2026
Planned commissioning
30 Dec 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 29 Sept 2026
MaStR unit IDs: SEE947429995534
Commercial signals (1): cmum4wg3q3miywtuszliketum

Grouping basisSingle unit
A single MaStR registration.
New planned asset
57Lead relevance · Moderate

Why this ranks here. Freshly registered planned asset and the registered operator is known. It affects only one 7 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance57

  • Project scale (MW)9
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10

Signal materiality27

  • Event type20
  • MW affected7

New planned wind unit — 7 MW — MaStR SEE965044431794

Winterberg, Nordrhein-Westfalen · Operator: VERBUND Green Power Deutschland GmbH

1 planned unit · 7 MW · First observed 29 Sept 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Dec 2026

A new planned wind unit of 7 MW was first observed in this MaStR snapshot.

A newly registered planned asset may be an early sign of a development worth a quick look.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Registered capacity
7 MW
First observed in MaStR snapshot
29 Sept 2026
Planned commissioning
30 Dec 2026
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 29 Sept 2026
MaStR unit IDs: SEE965044431794
Commercial signals (1): cmum4wg3o3mhswtusfwn14arw

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Major schedule changes (5)

Schedule change
64Lead relevance · High

Why this ranks high. Mid-sized 20.4 MW signal, 3 registrations moving together and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance64

  • Project scale (MW)15
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5
  • Size of change4

Signal materiality49

  • Event type16
  • Size of change14
  • MW affected11
  • Units affected8

Commissioning delayed by up to 98 days — 3 units / 20.4 MW

Wiefelstede, Niedersachsen · Operator: Prowind GmbH

3 units · 20.4 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Sept 2026 → Dec 2026 (+98 days)

3 wind units registered a later planned commissioning date (+98 days).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
3
Planned commissioning (same for every unit)
Sept 2026 → Dec 2026 (+98 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“dingsfelde…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: 28 Sept 2026 → 29 Sept 2026
MaStR unit IDs: SEE930952608606, SEE957641340050, SEE908144396952
Commercial signals (3): cmum4wg3r3mjmwtustnnmsq78, cmum4wg3o3mi3wtust61e0mur, cmum4wg3n3mh8wtusp94o2ua6

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“dingsfelde…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
61Lead relevance · High

Why this ranks high. Mid-sized 24 MW signal, 4 registrations moving together and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance61

  • Project scale (MW)16
  • Event type8
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6
  • Size of change3

Signal materiality51

  • Event type16
  • Size of change13
  • MW affected12
  • Units affected10

Commissioning delayed by up to 70 days — 4 units / 24 MW

Wilnsdorf, Nordrhein-Westfalen · Operator: MVV Windenergie GmbH

4 units · 24 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 14 Sept 2026

4 wind units registered a later planned commissioning date (+36 days to +70 days).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
4
Planned commissioning before
14 Sept 2026
Planned commissioning now
20 Oct – 23 Nov 2026
Shift per unit
+36 to +70 days
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wilnsdorf…”); Identical registered capacity; Planned/commissioning dates within 34 days of each other
Presentation group: 4 registered MaStR units
Snapshot transition: 28 Sept 2026 → 29 Sept 2026
MaStR unit IDs: SEE951974077065, SEE962411722073, SEE936790549538, SEE901491653662
Commercial signals (4): cmum4wg3p3mitwtuspecf6yuh, cmum4wg3o3mhvwtus7qntoky8, cmum4wg3q3mj9wtusht1c2u3g, cmum4wg3n3mh4wtus50levit5

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wilnsdorf…”); Identical registered capacity; Planned/commissioning dates within 34 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
55Lead relevance · Moderate

Why this ranks here. Unusually large schedule shift (730 days) and the registered operator is known. It affects only one 7 MW unit; it may still reflect a registry correction rather than a new commercial need; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance55

  • Project scale (MW)9
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change6

Signal materiality48

  • Event type16
  • Size of change25
  • MW affected7

Commissioning delayed by 730 days — 7 MW

Titz, Nordrhein-Westfalen · Operator: Windenergie Jansen GmbH

1 unit · 7 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Nov 2028 → Nov 2030 (+730 days)

The registered planned commissioning date moved by +730 days (Nov 2028 → Nov 2030).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Planned commissioning
Nov 2028 → Nov 2030 (+730 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Related registry activity
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 28 Sept 2026 → 29 Sept 2026
MaStR unit IDs: SEE923614214895
Commercial signals (1): cmum4wg3q3mjjwtusmvpkaazr

Grouping basisSingle unit
A single MaStR registration.
Schedule change
54Lead relevance · Moderate

Why this ranks here. Unusually large schedule shift (736 days) and the registered operator is known. It affects only one 6.2 MW unit; it may still reflect a registry correction rather than a new commercial need; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance54

  • Project scale (MW)8
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change6

Signal materiality48

  • Event type16
  • Size of change25
  • MW affected7

Commissioning delayed by 736 days — 6.2 MW

Kalletal, Nordrhein-Westfalen · Operator: JUWI GmbH

1 unit · 6.2 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Aug 2027 → Sept 2029 (+736 days)

The registered planned commissioning date moved by +736 days (Aug 2027 → Sept 2029).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Planned commissioning
Aug 2027 → Sept 2029 (+736 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 28 Sept 2026 → 29 Sept 2026
MaStR unit IDs: SEE915336140217
Commercial signals (1): cmum4wg3n3mhfwtus0w8db6tk

Grouping basisSingle unit
A single MaStR registration.
Schedule change
53Lead relevance · Moderate

Why this ranks here. Unusually large schedule shift (365 days) and the registered operator is known. It affects only one 4.26 MW unit; it may still reflect a registry correction rather than a new commercial need; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance53

  • Project scale (MW)7
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change6

Signal materiality44

  • Event type16
  • Size of change22
  • MW affected6

Commissioning delayed by 365 days — 4.26 MW

Ralingen, Rheinland-Pfalz · Operator: Windenergie Ralingen Planungsgesellschaft mbH

1 unit · 4.26 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Sept 2026 → Sept 2027 (+365 days)

The registered planned commissioning date moved by +365 days (Sept 2026 → Sept 2027).

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Planned commissioning
Sept 2026 → Sept 2027 (+365 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 28 Sept 2026 → 29 Sept 2026
MaStR unit IDs: SEE953722266127
Commercial signals (1): cmum4wg3p3miswtusmwtdfc1k

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Capacity changes (1)

Multiple changes
61Lead relevance · High

Why this ranks high. Capacity and schedule changes recorded together on the same units and the registered operator is known. It affects only one 7 MW unit.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance61

  • Project scale (MW)9
  • Event type14
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Several changes together5
  • Size of change5

Signal materiality51

  • Event type18
  • Size of change20
  • MW affected7
  • Several changes together6

Multiple registry changes (capacity + schedule) — 7 MW

Klingelbach, Rheinland-Pfalz · Operator: K&S regenerative Energie GmbH & Co.KG

1 unit · 7 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Jan 2029 → May 2029 (+150 days)

Registered capacity changed from 4.26 MW to 7 MW (+2.74 MW, +64%). The registered planned commissioning date moved by +150 days (Jan 2029 → May 2029).

Several registry changes were recorded together on the same units. That may indicate a substantive update to the project rather than a routine correction, and is worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Design / technologyGrid connectionEngineeringEquipment sizingProject schedulingConstruction timing
Design change?Permit & grid documentsDeveloper updatesRegistry correction?
Facts, hypotheses and how to verify
Registered capacity
4.26 MW → 7 MW (+2.74 MW / +64%)
Planned commissioning
Jan 2029 → May 2029 (+150 days)
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Check whether the change reflects a design or turbine-model change
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Compare with permit and grid-connection documents
  • Check permitting and construction status
  • Look for recent developer announcements
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 28 Sept 2026 → 29 Sept 2026
MaStR unit IDs: SEE988753004912
Commercial signals (2): cmum4wg3p3miawtusys3e2jk4, cmum4wg3p3mibwtusqdgltkxj

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Operator / company changes (3)

Operator change
56Lead relevance · Moderate

Why this ranks here. The registered operator is known. Small combined capacity (11.12 MW); no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance56

  • Project scale (MW)12
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3

Signal materiality27

  • Event type14
  • MW affected8
  • Units affected5

Registered operator changed on 2 wind units — 2 units / 11.12 MW

Haßbergen, Niedersachsen · Operator: Qualitas Energy Projekt GmbH

2 units · 11.12 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 2 wind units.

A registered operator change can be a useful trigger for investigating ownership, project restructuring, or a change in the commercial entity responsible for the asset. It does not by itself establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligence
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Units with an operator change
2
Previous registered operator
Qualitas Energy IV DevCo GmbH
New registered operator
Qualitas Energy Projekt GmbH
  • Project development or development-management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 28 Sept 2026 → 29 Sept 2026
MaStR unit IDs: SEE932228403663, SEE964131198305
Commercial signals (2): cmum4wg3p3mijwtusspis6c60, cmum4wg3o3mhtwtuss4r27jb4

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Operator change
49Lead relevance · Moderate

Why this ranks here. Mid-sized 17.04 MW signal and 4 registrations moving together. Operator identity is unresolved, which reduces immediate actionability; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance49

  • Project scale (MW)14
  • Event type13
  • Lifecycle stage4
  • Recency8
  • Operator identified4
  • Multi-unit evidence6

Signal materiality34

  • Event type14
  • MW affected10
  • Units affected10

Registered operator changed on 4 wind units — 4 units / 17.04 MW

Barver, Niedersachsen · Operator: 3 registered operators (names not resolved)

4 units · 17.04 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 4 wind units, now registered to 3 different operators.

Several units moving from one registered operator to different registered operators may reflect project-company restructuring, for example separate operating entities per unit. That is worth checking against company records; the change alone does not establish an acquisition or ownership transfer.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligenceO&M
Company registerSale / restructuring newsRelated entities?
Facts, hypotheses and how to verify
Units with an operator change
4
Previous registered operator
Landvolk-Dienstleistungsgesellschaft Grafschaft Diepholz mbH
New registered operator
3 different registered operators (names not resolved in MaStR reference data; IDs under per-unit values)
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Check whether the previous and new operators are related entities
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wp barver süd…”); Identical registered capacity
Presentation group: 4 registered MaStR units
Snapshot transition: 28 Sept 2026 → 29 Sept 2026
MaStR unit IDs: SEE998947234865, SEE910750172622, SEE917769117538, SEE993780521998
Commercial signals (4): cmum4wg3p3mimwtus9qlbc0xr, cmum4wg3n3mhawtuso5r7l635, cmum4wg3n3mhhwtus5es7q3uw, cmum4wg3p3migwtusj90vnjn8

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp barver süd…”); Identical registered capacity
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Multiple changes
48Lead relevance · Moderate

Why this ranks here. Operator and commissioning changes recorded together on the same units. Operator identity is unresolved, which reduces immediate actionability; small combined capacity (9.6 MW); no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance48

  • Project scale (MW)11
  • Event type13
  • Lifecycle stage4
  • Recency8
  • Operator identified4
  • Multi-unit evidence3
  • Several changes together5

Signal materiality33

  • Event type14
  • MW affected8
  • Units affected5
  • Several changes together6

Multiple registry changes (operator + commissioning) — 2 units / 9.6 MW

Ottenbüttel, Schleswig-Holstein · Operator: Registered operator name not resolved

2 units · 9.6 MW

Wind · Wind turbine (horizontal-axis)

The registered operator changed on 2 wind units. 2 wind units (9.6 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 16 Sept 2026.

Several registry changes were recorded together on the same units. That may indicate a substantive update to the project rather than a routine correction, and is worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Asset transactionsFinancingDue diligenceDeveloper intelligenceO&M
Company registerSale / restructuring newsRelated entities?MaStR record
Facts, hypotheses and how to verify
Units with an operator change
2
Previous registered operator
Denker & Wulf AG
New registered operator
Operator ID ABR992896784464 (name not resolved)
Units commissioned
2
Total registered capacity
9.6 MW
Commissioning date
16 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Confirm operating status and commissioning date in the official MaStR record
  • Check whether the previous and new operators are related entities
  • Identify the operating company and public information on service arrangements
  • Search for announcements of a sale, financing or restructuring
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 28 Sept 2026 → 29 Sept 2026
MaStR unit IDs: SEE958682771698, SEE942496915546
Commercial signals (4): cmum4wg3o3mi0wtus65ip90jw, cmum4wg3o3mi1wtusdgzpl980, cmum4wg3q3mj2wtusvvxq6ftr, cmum4wg3q3mj3wtusr8arxmvr

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
↑ Back to top

Recently commissioned assets (3)

Commissioned asset
36Lead relevance · Low

Why this ranks here. The registered operator is known. It affects only one 7.2 MW unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance36

  • Project scale (MW)9
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality19

  • Event type12
  • MW affected7

Wind unit commissioned — 7.2 MW

Erkelenz, Nordrhein-Westfalen · Operator: MLK Windpark Holzweiler Nr. 100 GmbH & Co. KG

1 unit · 7.2 MW

Wind · Wind turbine (horizontal-axis)

1 wind unit (7.2 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 26 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
7.2 MW
Commissioning date
26 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 28 Sept 2026 → 29 Sept 2026
MaStR unit IDs: SEE960303446205
Commercial signals (1): cmum4wg3o3mhxwtusjqd8vvoy

Grouping basisSingle unit
Stable MaStR location ID: SEL975742047449
A single MaStR registration.
Commissioned asset
35Lead relevance · Low

Why this ranks here. The registered operator is known. It affects only one 6 MW unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance35

  • Project scale (MW)8
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality19

  • Event type12
  • MW affected7

Wind unit commissioned — 6 MW

Weselberg, Rheinland-Pfalz · Operator: Windfeld Thüringer Becken KH 56.1 GmbH & Co. KG

1 unit · 6 MW

Wind · Wind turbine (horizontal-axis)

1 wind unit (6 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 26 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
6 MW
Commissioning date
26 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 28 Sept 2026 → 29 Sept 2026
MaStR unit IDs: SEE976666829876
Commercial signals (1): cmum4wg3n3mhjwtusebkkidx3

Grouping basisSingle unit
Stable MaStR location ID: SEL932560383418
A single MaStR registration.
Commissioned asset
35Lead relevance · Low

Why this ranks here. The registered operator is known. It affects only one 5.7 MW unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance35

  • Project scale (MW)8
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality19

  • Event type12
  • MW affected7

Wind unit commissioned — 5.7 MW

Elsdorf, Nordrhein-Westfalen · Operator: Energiepark Elsdorf WP Frankeshoven GmbH & Co. KG

1 unit · 5.7 MW

Wind · Wind turbine (horizontal-axis)

1 wind unit (5.7 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 24 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
5.7 MW
Commissioning date
24 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 28 Sept 2026 → 29 Sept 2026
MaStR unit IDs: SEE956879758149
Commercial signals (1): cmum4wg3p3miqwtus3w4j62aq

Grouping basisSingle unit
Stable MaStR location ID: SEL984213390694
A single MaStR registration.
↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.