New planned asset
67Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance67

  • Project scale (MW)14
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind development signal — 3 units / 18.12 MW

Wesel, Nordrhein-Westfalen · Operator: SL Windenergie GmbH

3 planned units · 18.12 MW · First observed 29 Sept 2026

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorSL Windenergie GmbH

3 new planned wind units totalling 18.12 MW were first observed in this MaStR snapshot.

Why this ranks high. Mid-sized 18.12 MW signal, 3 registrations moving together, freshly registered planned asset and the registered operator is known.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Developer servicesGrid & electricalEngineeringCivil / BOPMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Planned units first observed
3
Total registered capacity
18.12 MW
Capacity per unit
5.56–7 MW per unit
First observed in MaStR snapshot
29 Sept 2026
Planned commissioning
24 Sept 2030

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wesel perrich…”); Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

First tracked snapshot → 29 Sept 2026

← Back to the brief · 2026-09-29