New planned asset74Lead relevance · High
Why this ranks high. Mid-sized 40.7 MW signal, 6 registrations moving together, freshly registered planned asset and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance74
- Project scale (MW)19
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence7
Signal materiality46
- Event type20
- MW affected14
- Units affected12
New planned wind development signal — 6 units / 40.7 MW
Wittmund, Niedersachsen · Operator: Windpark “Vorm Wind” GmbH & Co. KG
6 planned units · 40.7 MW · First observed 06 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 01 Feb 2029
What changed
6 new planned wind units totalling 40.7 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 6
- Total registered capacity
- 40.7 MW
- Capacity per unit
- 5.7–7 MW per unit
- First observed in MaStR snapshot
- 06 Oct 2026
- Planned commissioning
- 01 Feb 2029
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“groß charlottengroden repowering wea…”); Same planned/commissioning date on every unit
Presentation group: 6 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE912992804941, SEE927549104658, SEE928352334423, SEE900735994707, SEE957732211061, SEE981970681713
Commercial signals (6): cmuw9e33b2c8hwtd4pmsdjhyn, cmuw9e33c2c94wtd48pegjtz4, cmuw9e33c2c97wtd478z3xb8h, cmuw9e33a2c7wwtd4iqo0x0zd, cmuw9e33e2caswtd4c068cmdz, cmuw9e33f2cbrwtd4b74ic0vn
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“groß charlottengroden repowering wea…”); Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (6)
New planned asset72Lead relevance · High
Why this ranks high. Mid-sized 36 MW signal, 5 registrations moving together, freshly registered planned asset and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance72
- Project scale (MW)18
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence6
Signal materiality45
- Event type20
- MW affected14
- Units affected11
New planned wind development signal — 5 units / 36 MW
Krackow, Mecklenburg-Vorpommern · Operator: WP Schwennenz GmbH & Co. KG
5 planned units · 36 MW · First observed 06 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 30 Jun – 30 Sept 2029
What changed
5 new planned wind units totalling 36 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 5
- Total registered capacity
- 36 MW
- Capacity per unit
- 7.2 MW each
- First observed in MaStR snapshot
- 06 Oct 2026
- Planned commissioning between
- 30 Jun – 30 Sept 2029
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Planned/commissioning dates within 92 days of each other
Presentation group: 5 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE929234382112, SEE929739123951, SEE934737319534, SEE999256302566, SEE903914336299
Commercial signals (5): cmuw9e33c2c98wtd4a6fsop8h, cmuw9e33c2c99wtd45ae0axei, cmuw9e33c2c9iwtd4ed0s0w51, cmuw9e33g2cchwtd474c4pr44, cmuw9e33a2c82wtd472294bkd
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Planned/commissioning dates within 92 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (5)
New planned asset72Lead relevance · High
Why this ranks high. Mid-sized 36 MW signal, 5 registrations moving together, freshly registered planned asset and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance72
- Project scale (MW)18
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence6
Signal materiality45
- Event type20
- MW affected14
- Units affected11
New planned wind development signal — 5 units / 36 MW
Nenndorf, Niedersachsen · Operator: enercity Erneuerbare Projekte GmbH & Co. KG
5 planned units · 36 MW · First observed 06 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 01 Mar 2029
What changed
5 new planned wind units totalling 36 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 5
- Total registered capacity
- 36 MW
- Capacity per unit
- 7.2 MW each
- First observed in MaStR snapshot
- 06 Oct 2026
- Planned commissioning
- 01 Mar 2029
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“nln v enercity windpark holtriem…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 5 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE906412172963, SEE921771972399, SEE985406625470, SEE988949731691, SEE967249650499
Commercial signals (5): cmuw9e33a2c87wtd4qk1ty9z0, cmuw9e33b2c8twtd4tftsg74a, cmuw9e33f2cbwwtd4wjf2hejo, cmuw9e33f2cbzwtd4ycfome91, cmuw9e33f2cbbwtd4pvwvvi5c
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“nln v enercity windpark holtriem…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (5)
New planned asset72Lead relevance · High
Why this ranks high. Mid-sized 35 MW signal, 5 registrations moving together, freshly registered planned asset and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance72
- Project scale (MW)18
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence6
Signal materiality44
- Event type20
- MW affected13
- Units affected11
New planned wind development signal — 5 units / 35 MW
Betzendorf, Niedersachsen · Operator: BayWa r.e. Energieprojekte GmbH
5 planned units · 35 MW · First observed 06 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 30 Sept 2029
What changed
5 new planned wind units totalling 35 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 5
- Total registered capacity
- 35 MW
- Capacity per unit
- 7 MW each
- First observed in MaStR snapshot
- 06 Oct 2026
- Planned commissioning
- 30 Sept 2029
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 5 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE908760012878, SEE909169028828, SEE920740173966, SEE967986476475, SEE970563699129
Commercial signals (5): cmuw9e33a2c88wtd4ccydg0hp, cmuw9e33a2c89wtd44ypvc0rl, cmuw9e33b2c8swtd4s1wtrcgg, cmuw9e33f2cbcwtd4l924fmfk, cmuw9e33f2cbfwtd48adhs3er
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (5)
New planned asset72Lead relevance · High
Why this ranks high. Mid-sized 34 MW signal, 5 registrations moving together, freshly registered planned asset and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance72
- Project scale (MW)18
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence6
Signal materiality44
- Event type20
- MW affected13
- Units affected11
New planned wind development signal — 5 units / 34 MW
Rietz-Neuendorf, Brandenburg · Operator: UKA Umweltgerechte Kraftanlagen GmbH & Co. KG
5 planned units · 34 MW · First observed 06 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 05 Oct 2029
What changed
5 new planned wind units totalling 34 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 5
- Total registered capacity
- 34 MW
- Capacity per unit
- 6.8 MW each
- First observed in MaStR snapshot
- 06 Oct 2026
- Planned commissioning
- 05 Oct 2029
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“görzig süd erweiterung…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 5 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE934944641558, SEE939841457677, SEE943271084129, SEE997622038941, SEE965661392515
Commercial signals (5): cmuw9e33c2c9jwtd4tq3o1fbq, cmuw9e33d2c9uwtd40jp03wtk, cmuw9e33d2ca4wtd4anb8vx9v, cmuw9e33g2ccdwtd4obj9yy14, cmuw9e33e2cb7wtd46pv4j733
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“görzig süd erweiterung…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (5)
New planned asset72Lead relevance · High
Why this ranks high. Mid-sized 34 MW signal, 5 registrations moving together, freshly registered planned asset and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance72
- Project scale (MW)18
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence6
Signal materiality44
- Event type20
- MW affected13
- Units affected11
New planned wind development signal — 5 units / 34 MW
Schmallenberg, Nordrhein-Westfalen · Operator: NATURWERK Windenergie GmbH
5 planned units · 34 MW · First observed 06 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 30 Aug – 26 Oct 2028
What changed
5 new planned wind units totalling 34 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 5
- Total registered capacity
- 34 MW
- Capacity per unit
- 6.8 MW each
- First observed in MaStR snapshot
- 06 Oct 2026
- Planned commissioning between
- 30 Aug – 26 Oct 2028
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Planned/commissioning dates within 57 days of each other
Presentation group: 5 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE903121451242, SEE955232270366, SEE959460359213, SEE974251703945, SEE978355620788
Commercial signals (5): cmuw9e33a2c80wtd4pzok1mbz, cmuw9e33e2canwtd4c6rsiocs, cmuw9e33e2cavwtd4bbr8h1q9, cmuw9e33f2cbkwtd4onqgal7c, cmuw9e33f2cbmwtd4i4pwenog
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Planned/commissioning dates within 57 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (5)
New planned asset71Lead relevance · High
Why this ranks high. Mid-sized 28 MW signal, 4 registrations moving together, freshly registered planned asset and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance71
- Project scale (MW)17
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence6
Signal materiality42
- Event type20
- MW affected12
- Units affected10
New planned wind development signal — 4 units / 28 MW
Lübbow, Niedersachsen · Operator: NxW Lübbow Bösel GmbH
4 planned units · 28 MW · First observed 06 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 01 Nov 2028
What changed
4 new planned wind units totalling 28 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 4
- Total registered capacity
- 28 MW
- Capacity per unit
- 7 MW each
- First observed in MaStR snapshot
- 06 Oct 2026
- Planned commissioning
- 01 Nov 2028
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wea lbb i…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 4 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE933050288503, SEE999970723135, SEE966574471410, SEE980082348279
Commercial signals (4): cmuw9e33c2c9cwtd448tqimp3, cmuw9e33d2c9wwtd4zt8h8i93, cmuw9e33f2cbawtd437gejl2i, cmuw9e33f2cbqwtd496z7x4a5
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wea lbb i…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (4)
New planned asset71Lead relevance · High
Why this ranks high. Mid-sized 28 MW signal, 4 registrations moving together, freshly registered planned asset and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance71
- Project scale (MW)17
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence6
Signal materiality42
- Event type20
- MW affected12
- Units affected10
New planned wind development signal — 4 units / 28 MW
Marlow, Mecklenburg-Vorpommern · Operator: QE Kuhlrade GmbH
4 planned units · 28 MW · First observed 06 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 31 Dec 2028
What changed
4 new planned wind units totalling 28 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 4
- Total registered capacity
- 28 MW
- Capacity per unit
- 7 MW each
- First observed in MaStR snapshot
- 06 Oct 2026
- Planned commissioning
- 31 Dec 2028
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wea kuh i…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 4 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE918137459663, SEE952540919253, SEE959230656610, SEE960142133298
Commercial signals (4): cmuw9e33b2c8pwtd4v5mkdo9r, cmuw9e33e2cajwtd4w8zz09k4, cmuw9e33e2cauwtd43kdx3ktx, cmuw9e33e2caxwtd4vxaj1s78
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wea kuh i…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (4)
New planned asset69Lead relevance · High
Why this ranks high. Large 49 MW multi-unit signal, 7 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance69
- Project scale (MW)20
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified4
- Multi-unit evidence7
Signal materiality47
- Event type20
- MW affected15
- Units affected12
New planned wind development signal — 7 units / 49 MW
Dingen, Schleswig-Holstein · Operator: Registered operator name not resolved
7 planned units · 49 MW · First observed 06 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 15 Sept 2029
What changed
7 new planned wind units totalling 49 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 7
- Total registered capacity
- 49 MW
- Capacity per unit
- 7 MW each
- First observed in MaStR snapshot
- 06 Oct 2026
- Planned commissioning
- 15 Sept 2029
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 7 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE904298079505, SEE910082951520, SEE919632148311, SEE941296844322, SEE954063038633, SEE955400323283, SEE957274560832
Commercial signals (7): cmuw9e33a2c84wtd4s0id5sqx, cmuw9e33a2c8cwtd4sw6bzi3g, cmuw9e33b2c8rwtd4oog6jz1e, cmuw9e33d2c9xwtd4z55ohy25, cmuw9e33e2calwtd45nkeii2b, cmuw9e33e2caowtd4ntbjv5wz, cmuw9e33e2carwtd4qruwbyhs
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (7)
New planned asset68Lead relevance · High
Why this ranks high. Mid-sized 28 MW signal, freshly registered planned asset and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance68
- Project scale (MW)17
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence3
Signal materiality37
- Event type20
- MW affected12
- Units affected5
New planned wind development signal — 2 units / 28 MW
Gutow, Mecklenburg-Vorpommern · Operator: Projekt Windmüller Drgala GmbH
2 planned units · 28 MW · First observed 06 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 30 Sept 2028
What changed
2 new planned wind units totalling 28 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 2
- Total registered capacity
- 28 MW
- Capacity per unit
- 14 MW each
- First observed in MaStR snapshot
- 06 Oct 2026
- Planned commissioning
- 30 Sept 2028
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“bülow e…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE954682631222, SEE965850479850
Commercial signals (2): cmuw9e33e2camwtd442k5l5yz, cmuw9e33f2cb9wtd4vds13u7r
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“bülow e…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (2)
New planned asset67Lead relevance · High
Why this ranks high. Mid-sized 16.5 MW signal, 3 registrations moving together, freshly registered planned asset and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance67
- Project scale (MW)14
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence5
Signal materiality38
- Event type20
- MW affected10
- Units affected8
New planned wind development signal — 3 units / 16.5 MW
Casekow, Brandenburg · Operator: ENERTRAG SE
3 planned units · 16.5 MW · First observed 06 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 30 Apr 2029
What changed
3 new planned wind units totalling 16.5 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 3
- Total registered capacity
- 16.5 MW
- Capacity per unit
- 5.5 MW each
- First observed in MaStR snapshot
- 06 Oct 2026
- Planned commissioning
- 30 Apr 2029
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE903804825483, SEE987827116025, SEE964910081149
Commercial signals (3): cmuw9e33a2c81wtd4ft34pse7, cmuw9e33f2cbxwtd4rsj4vft6, cmuw9e33e2cb4wtd4kemzsnsa
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (3)
New planned asset66Lead relevance · High
Why this ranks high. Mid-sized 20.4 MW signal, freshly registered planned asset and the registered operator is known. The grouping evidence is limited.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance66
- Project scale (MW)15
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence3
Signal materiality39
- Event type20
- MW affected11
- Units affected8
New planned wind units — 3 units / 20.4 MW
Plattenburg, Brandenburg · Operator: NOTUS energy Opera GmbH & Co.KG
3 planned units · 20.4 MW · First observed 06 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 05 Oct 2028 – 05 Oct 2029
What changed
3 new planned wind units totalling 20.4 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 3
- Total registered capacity
- 20.4 MW
- Capacity per unit
- 6.8 MW each
- First observed in MaStR snapshot
- 06 Oct 2026
- Planned commissioning between
- 05 Oct 2028 – 05 Oct 2029
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Conservative group — Identical registered capacity
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE942075968871, SEE948197408233, SEE999167328396
Commercial signals (3): cmuw9e33d2ca2wtd4e2b4ur3q, cmuw9e33d2caawtd45kpn2vwx, cmuw9e33g2ccfwtd4xlndijpv
Grouping basisConservative group
Supporting registry evidence: Identical registered capacity
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Underlying registrations (3)