Intelligence brief

German Energy Asset Change Intelligence — 2026-10-06

A curated, source-traceable view of registered MaStR asset updates.

Coverage: 05 Oct → 06 Oct 2026Latest MaStR snapshot: 6 Oct 2026Snapshots compared: 2

Covers one snapshot-to-snapshot transition. Do not compare its counts with weekly or multi-day reports.

Source coverageLatest MaStR snapshot: 6 Oct 2026Brief generated: 6 Oct 2026
8Top opportunities shown
The diversified selection shown in the Top section. 53 grouped events score above the investigation threshold in total. A registry signal only: it does not establish procurement activity or buyer intent.
48New development signals
2Major schedule shifts
1Operator changes
6Commissioning events
1 GWNewly planned capacity

59 grouped events (units merged into likely site groups; not confirmed projects). Unit-level records: 169 registry changes across 168 registrations, 1.14 GW registered capacity.

Start here

  1. 75New planned wind development signal — 7 units / 50.4 MW · Nidda, Hessen
  2. 74New planned wind units — 9 units / 64.8 MW · Friesoythe, Niedersachsen
  3. 74New planned wind development signal — 6 units / 43.2 MW · Bad Driburg, Nordrhein-Westfalen
  4. 74New planned wind development signal — 6 units / 43.2 MW · Sundern (Sauerland), Nordrhein-Westfalen
  5. 70Commissioning delayed by up to 91 days — 7 units / 42 MW · Brakel, Nordrhein-Westfalen

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

Top opportunities to investigate (8)

Selected from the highest-scoring investigation signals, with category diversification to avoid repetitive results. Cards are ordered by opportunity score; a higher-scoring signal of an already well-represented type may appear in a section below. Scores are deterministic and are not probabilities. Everything here is a starting point for verification, not evidence of demand.

New planned asset
75Lead relevance · Very high

Why this ranks high. Large 50.4 MW multi-unit signal, 7 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance75

  • Project scale (MW)20
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence7

Signal materiality47

  • Event type20
  • MW affected15
  • Units affected12

New planned wind development signal — 7 units / 50.4 MW

Nidda, Hessen · Operator: Windpark Nidda-Höllberg GmbH

7 planned units · 50.4 MW · First observed 06 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Jun 2029

7 new planned wind units totalling 50.4 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
7
Total registered capacity
50.4 MW
Capacity per unit
7.2 MW each
First observed in MaStR snapshot
06 Oct 2026
Planned commissioning
01 Jun 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 7 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE914776350484, SEE946713377261, SEE982917696340, SEE993477730283, SEE994767542616, SEE952283869853, SEE965082911234
Commercial signals (7): cmuw9e33b2c8kwtd43cw2ozfe, cmuw9e33d2ca8wtd4c6n3dv78, cmuw9e33f2cbswtd4xw5uxv7i, cmuw9e33g2cc6wtd4apm8uq68, cmuw9e33g2cc8wtd4g58nffre, cmuw9e33e2caiwtd41gouj2ij, cmuw9e33e2cb5wtd4cnrua9om

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
74Lead relevance · High

Why this ranks high. Large 64.8 MW multi-unit signal, 9 registrations moving together, freshly registered planned asset and the registered operator is known. The grouping evidence is limited.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance74

  • Project scale (MW)21
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5

Signal materiality50

  • Event type20
  • MW affected16
  • Units affected14

New planned wind units — 9 units / 64.8 MW

Friesoythe, Niedersachsen · Operator: PNE AG

9 planned units · 64.8 MW · First observed 06 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Oct 2028 – 28 Sept 2029

9 new planned wind units totalling 64.8 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
9
Total registered capacity
64.8 MW
Capacity per unit
7.2 MW each
First observed in MaStR snapshot
06 Oct 2026
Planned commissioning between
30 Oct 2028 – 28 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Conservative group — Identical registered capacity
Presentation group: 9 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE905179719800, SEE916489646274, SEE924426594397, SEE934299302753, SEE935922213545, SEE940192247176, SEE958603523771, SEE972672275430, SEE979953823304
Commercial signals (9): cmuw9e33a2c86wtd42qwigw65, cmuw9e33b2c8nwtd4a84zpown, cmuw9e33b2c8wwtd4y95fetyu, cmuw9e33c2c9gwtd4v3q8lm7q, cmuw9e33c2c9mwtd4dcz6k65d, cmuw9e33d2c9vwtd48skm1u89, cmuw9e33e2catwtd4fd186xsu, cmuw9e33f2cbiwtd4t1a9u8ew, cmuw9e33f2cbpwtd4fjjj0c97

Grouping basisConservative group
Supporting registry evidence: Identical registered capacity
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
New planned asset
74Lead relevance · High

Why this ranks high. Mid-sized 43.2 MW signal, 6 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance74

  • Project scale (MW)19
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence7

Signal materiality46

  • Event type20
  • MW affected14
  • Units affected12

New planned wind development signal — 6 units / 43.2 MW

Bad Driburg, Nordrhein-Westfalen · Operator: Energiekontor AG

6 planned units · 43.2 MW · First observed 06 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Jul 2029

6 new planned wind units totalling 43.2 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
6
Total registered capacity
43.2 MW
Capacity per unit
7.2 MW each
First observed in MaStR snapshot
06 Oct 2026
Planned commissioning
31 Jul 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 6 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE926979499808, SEE933844768662, SEE988384393652, SEE999642051382, SEE960784741035, SEE965840750099
Commercial signals (6): cmuw9e33c2c93wtd4gyb3whty, cmuw9e33c2c9ewtd4uu3t438g, cmuw9e33f2cbywtd4l6b4xrm0, cmuw9e33a2c7twtd40o6yhi7z, cmuw9e33e2cazwtd4b6w9265l, cmuw9e33e2cb8wtd4kxxse9tm

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
74Lead relevance · High

Why this ranks high. Mid-sized 43.2 MW signal, 6 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance74

  • Project scale (MW)19
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence7

Signal materiality46

  • Event type20
  • MW affected14
  • Units affected12

New planned wind development signal — 6 units / 43.2 MW

Sundern (Sauerland), Nordrhein-Westfalen · Operator: ENERTRAG SE

6 planned units · 43.2 MW · First observed 06 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 26 Jul 2029

6 new planned wind units totalling 43.2 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
6
Total registered capacity
43.2 MW
Capacity per unit
7.2 MW each
First observed in MaStR snapshot
06 Oct 2026
Planned commissioning
26 Jul 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wa waldbach…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 6 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE904069166274, SEE945300167100, SEE900080019858, SEE990765985875, SEE993387043138, SEE979477286425
Commercial signals (6): cmuw9e33a2c83wtd474kpcpnw, cmuw9e33d2ca5wtd4mkyuvqay, cmuw9e33a2c7uwtd4pz1l5y71, cmuw9e33g2cc2wtd40fqplmco, cmuw9e33g2cc5wtd4wvl7js2j, cmuw9e33f2cbnwtd4g57mkun5

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wa waldbach…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
70Lead relevance · High

Why this ranks high. Mid-sized 42 MW signal, 7 registrations moving together and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance70

  • Project scale (MW)19
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence7
  • Size of change4

Signal materiality56

  • Event type16
  • Size of change14
  • MW affected14
  • Units affected12

Commissioning delayed by up to 91 days — 7 units / 42 MW

Brakel, Nordrhein-Westfalen · Operator: Windpark Hegge GmbH & Co. KG

7 units · 42 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: Jul 2028 → Oct 2028 (+91 days)

7 wind units registered a later planned commissioning date (+91 days).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Units with a new planned date
7
Planned commissioning (same for every unit)
Jul 2028 → Oct 2028 (+91 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 7 registered MaStR units
Snapshot transition: 5 Oct 2026 → 6 Oct 2026
MaStR unit IDs: SEE951119444769, SEE938739096585, SEE992147317496, SEE965159542712, SEE956785656720, SEE948583618437, SEE905138117319
Commercial signals (7): cmuw9e33d2cafwtd4nh5w7fly, cmuw9e33d2c9swtd44vo2pudc, cmuw9e33g2cc3wtd4t9q2s1d5, cmuw9e33e2cb6wtd4pos43qon, cmuw9e33e2caqwtd4s22d7jiw, cmuw9e33d2cacwtd41hj1agu0, cmuw9e33a2c85wtd4fjd1mq9i

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Capacity change
67Lead relevance · High

Why this ranks high. Mid-sized 21 MW signal, 3 registrations moving together and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance67

  • Project scale (MW)15
  • Event type14
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5
  • Size of change5

Signal materiality57

  • Event type18
  • Size of change20
  • MW affected11
  • Units affected8

Registered wind capacity increased (+8.4 MW) — 3 units / 21 MW

Lübz, Mecklenburg-Vorpommern · Operator: Erneuerbare Energie Mecklenburg GmbH & Co. KG

3 units · 21 MW

Wind · Wind turbine (horizontal-axis)

3 wind units registered a capacity change; combined registered capacity moved from 12.6 MW to 21 MW (+8.4 MW).

A larger registered capacity may indicate a changed project design, turbine or equipment choice, or grid-connection scope, and could affect engineering and equipment requirements.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Design / technologyGrid connectionEngineeringEquipment sizing
Design change?Permit & grid documentsDeveloper updates
Facts, hypotheses and how to verify
Per-unit change
3 units changed from 4.2 MW to 7 MW each
Combined registered capacity now
21 MW
Combined change
+8.4 MW (+67%)
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Check whether the change reflects a design or turbine-model change
  • Compare with permit and grid-connection documents
  • Look for recent developer announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“gischow…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: 5 Oct 2026 → 6 Oct 2026
MaStR unit IDs: SEE997750194281, SEE993303818567, SEE999982645333
Commercial signals (3): cmuw9e33g2ccewtd4598fpbbq, cmuw9e33g2cc4wtd4n1ktprkr, cmuw9e33g2ccgwtd41h8v2msu

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“gischow…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Capacity change
65Lead relevance · High

Why this ranks high. Mid-sized 21 MW signal, 3 registrations moving together and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance65

  • Project scale (MW)15
  • Event type14
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5
  • Size of change3

Signal materiality47

  • Event type18
  • Size of change10
  • MW affected11
  • Units affected8

Registered wind capacity increased (+3 MW) — 3 units / 21 MW

Braunshorn, Rheinland-Pfalz · Operator: Höhenwind-Park GmbH

3 units · 21 MW

Wind · Wind turbine (horizontal-axis)

3 wind units registered a capacity change; combined registered capacity moved from 18 MW to 21 MW (+3 MW).

A larger registered capacity may indicate a changed project design, turbine or equipment choice, or grid-connection scope, and could affect engineering and equipment requirements.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Design / technologyGrid connectionEngineeringEquipment sizing
Design change?Permit & grid documentsDeveloper updates
Facts, hypotheses and how to verify
Per-unit change
3 units changed from 6 MW to 7 MW each
Combined registered capacity now
21 MW
Combined change
+3 MW (+17%)
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Check whether the change reflects a design or turbine-model change
  • Compare with permit and grid-connection documents
  • Look for recent developer announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“ebschied…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: 5 Oct 2026 → 6 Oct 2026
MaStR unit IDs: SEE948479714571, SEE915766142553, SEE962345116023
Commercial signals (3): cmuw9e33d2cabwtd4b2i5urm1, cmuw9e33b2c8lwtd4ffg1ttd9, cmuw9e33e2cb0wtd4pz8xrtgc

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“ebschied…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Schedule change
47Lead relevance · Moderate

Why this ranks here. The registered operator is known. It affects only one 5.6 MW unit; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance47

  • Project scale (MW)8
  • Event type8
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Size of change3

Signal materiality33

  • Event type16
  • Size of change10
  • MW affected7

Commissioning delayed by 42 days — 5.6 MW

Mühlen Eichsen, Mecklenburg-Vorpommern · Operator: wpd Windpark Mühlen Eichsen GmbH & Co. KG

1 unit · 5.6 MW

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 08 Sept 2026 → 20 Oct 2026 (+42 days)

The registered planned commissioning date moved by +42 days (08 Sept 2026 → 20 Oct 2026).

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Project schedulingEngineeringConstruction timingSupplier timing
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
Planned commissioning
08 Sept 2026 → 20 Oct 2026 (+42 days)
  • Project development or development-management services
  • Engineering and environmental services
  • Verify whether the date change reflects real rescheduling or a registry correction
  • Check permitting and construction status
  • Look for recent developer updates
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 5 Oct 2026 → 6 Oct 2026
MaStR unit IDs: SEE937290127776
Commercial signals (1): cmuw9e33d2c9rwtd4wn98g5i1

Grouping basisSingle unit
A single MaStR registration.
↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

New developments (12)

New planned asset
74Lead relevance · High

Why this ranks high. Mid-sized 40.7 MW signal, 6 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance74

  • Project scale (MW)19
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence7

Signal materiality46

  • Event type20
  • MW affected14
  • Units affected12

New planned wind development signal — 6 units / 40.7 MW

Wittmund, Niedersachsen · Operator: Windpark “Vorm Wind” GmbH & Co. KG

6 planned units · 40.7 MW · First observed 06 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Feb 2029

6 new planned wind units totalling 40.7 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
6
Total registered capacity
40.7 MW
Capacity per unit
5.7–7 MW per unit
First observed in MaStR snapshot
06 Oct 2026
Planned commissioning
01 Feb 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“groß charlottengroden repowering wea…”); Same planned/commissioning date on every unit
Presentation group: 6 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE912992804941, SEE927549104658, SEE928352334423, SEE900735994707, SEE957732211061, SEE981970681713
Commercial signals (6): cmuw9e33b2c8hwtd4pmsdjhyn, cmuw9e33c2c94wtd48pegjtz4, cmuw9e33c2c97wtd478z3xb8h, cmuw9e33a2c7wwtd4iqo0x0zd, cmuw9e33e2caswtd4c068cmdz, cmuw9e33f2cbrwtd4b74ic0vn

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“groß charlottengroden repowering wea…”); Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
72Lead relevance · High

Why this ranks high. Mid-sized 36 MW signal, 5 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance72

  • Project scale (MW)18
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality45

  • Event type20
  • MW affected14
  • Units affected11

New planned wind development signal — 5 units / 36 MW

Krackow, Mecklenburg-Vorpommern · Operator: WP Schwennenz GmbH & Co. KG

5 planned units · 36 MW · First observed 06 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Jun – 30 Sept 2029

5 new planned wind units totalling 36 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
5
Total registered capacity
36 MW
Capacity per unit
7.2 MW each
First observed in MaStR snapshot
06 Oct 2026
Planned commissioning between
30 Jun – 30 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Planned/commissioning dates within 92 days of each other
Presentation group: 5 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE929234382112, SEE929739123951, SEE934737319534, SEE999256302566, SEE903914336299
Commercial signals (5): cmuw9e33c2c98wtd4a6fsop8h, cmuw9e33c2c99wtd45ae0axei, cmuw9e33c2c9iwtd4ed0s0w51, cmuw9e33g2cchwtd474c4pr44, cmuw9e33a2c82wtd472294bkd

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Planned/commissioning dates within 92 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
72Lead relevance · High

Why this ranks high. Mid-sized 36 MW signal, 5 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance72

  • Project scale (MW)18
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality45

  • Event type20
  • MW affected14
  • Units affected11

New planned wind development signal — 5 units / 36 MW

Nenndorf, Niedersachsen · Operator: enercity Erneuerbare Projekte GmbH & Co. KG

5 planned units · 36 MW · First observed 06 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Mar 2029

5 new planned wind units totalling 36 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
5
Total registered capacity
36 MW
Capacity per unit
7.2 MW each
First observed in MaStR snapshot
06 Oct 2026
Planned commissioning
01 Mar 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“nln v enercity windpark holtriem…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 5 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE906412172963, SEE921771972399, SEE985406625470, SEE988949731691, SEE967249650499
Commercial signals (5): cmuw9e33a2c87wtd4qk1ty9z0, cmuw9e33b2c8twtd4tftsg74a, cmuw9e33f2cbwwtd4wjf2hejo, cmuw9e33f2cbzwtd4ycfome91, cmuw9e33f2cbbwtd4pvwvvi5c

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“nln v enercity windpark holtriem…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
72Lead relevance · High

Why this ranks high. Mid-sized 35 MW signal, 5 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance72

  • Project scale (MW)18
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality44

  • Event type20
  • MW affected13
  • Units affected11

New planned wind development signal — 5 units / 35 MW

Betzendorf, Niedersachsen · Operator: BayWa r.e. Energieprojekte GmbH

5 planned units · 35 MW · First observed 06 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Sept 2029

5 new planned wind units totalling 35 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
5
Total registered capacity
35 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
06 Oct 2026
Planned commissioning
30 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 5 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE908760012878, SEE909169028828, SEE920740173966, SEE967986476475, SEE970563699129
Commercial signals (5): cmuw9e33a2c88wtd4ccydg0hp, cmuw9e33a2c89wtd44ypvc0rl, cmuw9e33b2c8swtd4s1wtrcgg, cmuw9e33f2cbcwtd4l924fmfk, cmuw9e33f2cbfwtd48adhs3er

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
72Lead relevance · High

Why this ranks high. Mid-sized 34 MW signal, 5 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance72

  • Project scale (MW)18
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality44

  • Event type20
  • MW affected13
  • Units affected11

New planned wind development signal — 5 units / 34 MW

Rietz-Neuendorf, Brandenburg · Operator: UKA Umweltgerechte Kraftanlagen GmbH & Co. KG

5 planned units · 34 MW · First observed 06 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 05 Oct 2029

5 new planned wind units totalling 34 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
5
Total registered capacity
34 MW
Capacity per unit
6.8 MW each
First observed in MaStR snapshot
06 Oct 2026
Planned commissioning
05 Oct 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“görzig süd erweiterung…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 5 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE934944641558, SEE939841457677, SEE943271084129, SEE997622038941, SEE965661392515
Commercial signals (5): cmuw9e33c2c9jwtd4tq3o1fbq, cmuw9e33d2c9uwtd40jp03wtk, cmuw9e33d2ca4wtd4anb8vx9v, cmuw9e33g2ccdwtd4obj9yy14, cmuw9e33e2cb7wtd46pv4j733

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“görzig süd erweiterung…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
72Lead relevance · High

Why this ranks high. Mid-sized 34 MW signal, 5 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance72

  • Project scale (MW)18
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality44

  • Event type20
  • MW affected13
  • Units affected11

New planned wind development signal — 5 units / 34 MW

Schmallenberg, Nordrhein-Westfalen · Operator: NATURWERK Windenergie GmbH

5 planned units · 34 MW · First observed 06 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Aug – 26 Oct 2028

5 new planned wind units totalling 34 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
5
Total registered capacity
34 MW
Capacity per unit
6.8 MW each
First observed in MaStR snapshot
06 Oct 2026
Planned commissioning between
30 Aug – 26 Oct 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Planned/commissioning dates within 57 days of each other
Presentation group: 5 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE903121451242, SEE955232270366, SEE959460359213, SEE974251703945, SEE978355620788
Commercial signals (5): cmuw9e33a2c80wtd4pzok1mbz, cmuw9e33e2canwtd4c6rsiocs, cmuw9e33e2cavwtd4bbr8h1q9, cmuw9e33f2cbkwtd4onqgal7c, cmuw9e33f2cbmwtd4i4pwenog

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Planned/commissioning dates within 57 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
71Lead relevance · High

Why this ranks high. Mid-sized 28 MW signal, 4 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance71

  • Project scale (MW)17
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality42

  • Event type20
  • MW affected12
  • Units affected10

New planned wind development signal — 4 units / 28 MW

Lübbow, Niedersachsen · Operator: NxW Lübbow Bösel GmbH

4 planned units · 28 MW · First observed 06 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 01 Nov 2028

4 new planned wind units totalling 28 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
4
Total registered capacity
28 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
06 Oct 2026
Planned commissioning
01 Nov 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wea lbb i…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 4 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE933050288503, SEE999970723135, SEE966574471410, SEE980082348279
Commercial signals (4): cmuw9e33c2c9cwtd448tqimp3, cmuw9e33d2c9wwtd4zt8h8i93, cmuw9e33f2cbawtd437gejl2i, cmuw9e33f2cbqwtd496z7x4a5

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wea lbb i…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
71Lead relevance · High

Why this ranks high. Mid-sized 28 MW signal, 4 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance71

  • Project scale (MW)17
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6

Signal materiality42

  • Event type20
  • MW affected12
  • Units affected10

New planned wind development signal — 4 units / 28 MW

Marlow, Mecklenburg-Vorpommern · Operator: QE Kuhlrade GmbH

4 planned units · 28 MW · First observed 06 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 31 Dec 2028

4 new planned wind units totalling 28 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
4
Total registered capacity
28 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
06 Oct 2026
Planned commissioning
31 Dec 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wea kuh i…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 4 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE918137459663, SEE952540919253, SEE959230656610, SEE960142133298
Commercial signals (4): cmuw9e33b2c8pwtd4v5mkdo9r, cmuw9e33e2cajwtd4w8zz09k4, cmuw9e33e2cauwtd43kdx3ktx, cmuw9e33e2caxwtd4vxaj1s78

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wea kuh i…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
69Lead relevance · High

Why this ranks high. Large 49 MW multi-unit signal, 7 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance69

  • Project scale (MW)20
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence7

Signal materiality47

  • Event type20
  • MW affected15
  • Units affected12

New planned wind development signal — 7 units / 49 MW

Dingen, Schleswig-Holstein · Operator: Registered operator name not resolved

7 planned units · 49 MW · First observed 06 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 15 Sept 2029

7 new planned wind units totalling 49 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
7
Total registered capacity
49 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
06 Oct 2026
Planned commissioning
15 Sept 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 7 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE904298079505, SEE910082951520, SEE919632148311, SEE941296844322, SEE954063038633, SEE955400323283, SEE957274560832
Commercial signals (7): cmuw9e33a2c84wtd4s0id5sqx, cmuw9e33a2c8cwtd4sw6bzi3g, cmuw9e33b2c8rwtd4oog6jz1e, cmuw9e33d2c9xwtd4z55ohy25, cmuw9e33e2calwtd45nkeii2b, cmuw9e33e2caowtd4ntbjv5wz, cmuw9e33e2carwtd4qruwbyhs

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
68Lead relevance · High

Why this ranks high. Mid-sized 28 MW signal, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance68

  • Project scale (MW)17
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3

Signal materiality37

  • Event type20
  • MW affected12
  • Units affected5

New planned wind development signal — 2 units / 28 MW

Gutow, Mecklenburg-Vorpommern · Operator: Projekt Windmüller Drgala GmbH

2 planned units · 28 MW · First observed 06 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Sept 2028

2 new planned wind units totalling 28 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
2
Total registered capacity
28 MW
Capacity per unit
14 MW each
First observed in MaStR snapshot
06 Oct 2026
Planned commissioning
30 Sept 2028
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“bülow e…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE954682631222, SEE965850479850
Commercial signals (2): cmuw9e33e2camwtd442k5l5yz, cmuw9e33f2cb9wtd4vds13u7r

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“bülow e…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
67Lead relevance · High

Why this ranks high. Mid-sized 16.5 MW signal, 3 registrations moving together, freshly registered planned asset and the registered operator is known.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance67

  • Project scale (MW)14
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5

Signal materiality38

  • Event type20
  • MW affected10
  • Units affected8

New planned wind development signal — 3 units / 16.5 MW

Casekow, Brandenburg · Operator: ENERTRAG SE

3 planned units · 16.5 MW · First observed 06 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 30 Apr 2029

3 new planned wind units totalling 16.5 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
16.5 MW
Capacity per unit
5.5 MW each
First observed in MaStR snapshot
06 Oct 2026
Planned commissioning
30 Apr 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE903804825483, SEE987827116025, SEE964910081149
Commercial signals (3): cmuw9e33a2c81wtd4ft34pse7, cmuw9e33f2cbxwtd4rsj4vft6, cmuw9e33e2cb4wtd4kemzsnsa

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
New planned asset
66Lead relevance · High

Why this ranks high. Mid-sized 20.4 MW signal, freshly registered planned asset and the registered operator is known. The grouping evidence is limited.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance66

  • Project scale (MW)15
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind units — 3 units / 20.4 MW

Plattenburg, Brandenburg · Operator: NOTUS energy Opera GmbH & Co.KG

3 planned units · 20.4 MW · First observed 06 Oct 2026

Wind · Wind turbine (horizontal-axis)

Planned commissioning: 05 Oct 2028 – 05 Oct 2029

3 new planned wind units totalling 20.4 MW were first observed in this MaStR snapshot.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
Planned units first observed
3
Total registered capacity
20.4 MW
Capacity per unit
6.8 MW each
First observed in MaStR snapshot
06 Oct 2026
Planned commissioning between
05 Oct 2028 – 05 Oct 2029
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Civil works and balance-of-plant
  • Turbine-related services (supply, transport, installation, service)
  • Identify the developer or project company
  • Check planning and permitting status
  • Search municipal planning documents
  • Search recent company announcements
  • Search tenders and procurement notices
  • Verify whether construction or supplier selection has started
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Conservative group — Identical registered capacity
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 6 Oct 2026
MaStR unit IDs: SEE942075968871, SEE948197408233, SEE999167328396
Commercial signals (3): cmuw9e33d2ca2wtd4e2b4ur3q, cmuw9e33d2caawtd45kpn2vwx, cmuw9e33g2ccfwtd4xlndijpv

Grouping basisConservative group
Supporting registry evidence: Identical registered capacity
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
↑ Back to top

Capacity changes (1)

Multiple changes
64Lead relevance · High

Why this ranks high. Capacity and operator changes recorded together on the same units and the registered operator is known. Small combined capacity (12.4 MW).

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance64

  • Project scale (MW)12
  • Event type14
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3
  • Several changes together5
  • Size of change2

Signal materiality47

  • Event type18
  • Size of change9
  • MW affected9
  • Units affected5
  • Several changes together6

Multiple registry changes (capacity + operator) — 2 units / 12.4 MW

Schladen-Werla, Niedersachsen · Operator: Bürgerwindpark Beuchte Planungsgesellschaft mbH & Co. KG

2 units · 12.4 MW

Wind · Wind turbine (horizontal-axis)

2 wind units registered a capacity change; combined registered capacity moved from 14.4 MW to 12.4 MW (-2 MW). The registered operator changed on 1 wind unit.

Several registry changes were recorded together on the same units. That may indicate a substantive update to the project rather than a routine correction, and is worth investigating.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
Design / technologyGrid connectionEngineeringEquipment sizingAsset transactionsFinancing
Design change?Permit & grid documentsDeveloper updatesCompany register
Facts, hypotheses and how to verify
Per-unit change
2 units changed from 7.2 MW to 6.2 MW each
Combined registered capacity now
12.4 MW
Combined change
-2 MW (-14%)
Previous registered operator
Bürgerwind Beuchte WEA 11 powered by Ebert GmbH & Co. KG
New registered operator
Bürgerwindpark Beuchte Planungsgesellschaft mbH & Co. KG
  • Project development or development-management services
  • Grid-connection / interconnection and electrical infrastructure services
  • Engineering and environmental services
  • Asset or company transaction advisory and technical due diligence
  • Financing or refinancing discussions
  • Check whether the change reflects a design or turbine-model change
  • Look up the new registered operator in the commercial register (Handelsregister)
  • Compare with permit and grid-connection documents
  • Check whether the previous and new operators are related entities
  • Look for recent developer announcements
  • Search for announcements of a sale, financing or restructuring
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Identical registered change on every unit; Planned/commissioning dates within 31 days of each other
Presentation group: 2 registered MaStR units
Snapshot transition: 5 Oct 2026 → 6 Oct 2026
MaStR unit IDs: SEE968764666774, SEE996187172190
Commercial signals (3): cmuw9e33f2cbdwtd4cf63xht3, cmuw9e33g2ccawtd4ce9mf7k7, cmuw9e33g2ccbwtd4hj7jsdy0

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Planned/commissioning dates within 31 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
↑ Back to top

Recently commissioned assets (6)

Commissioned asset
42Lead relevance · Low

Why this ranks here. The registered operator is known. Small combined capacity (12.4 MW); already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance42

  • Project scale (MW)12
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10
  • Multi-unit evidence3

Signal materiality26

  • Event type12
  • MW affected9
  • Units affected5

2 wind units commissioned — 2 units / 12.4 MW

Neukieritzsch, Sachsen · Operator: Windpark Breunsdorf I GmbH

2 units · 12.4 MW

Wind · Wind turbine (horizontal-axis)

2 wind units (12.4 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 30 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Units commissioned
2
Total registered capacity
12.4 MW
Commissioning date
30 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“wp breunsdorf i…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 5 Oct 2026 → 6 Oct 2026
MaStR unit IDs: SEE910495494881, SEE936411533144
Commercial signals (2): cmuw9e33a2c8dwtd4l5fkys48, cmuw9e33d2c9pwtd4z3ib86v3

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp breunsdorf i…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Commissioned asset
35Lead relevance · Low

Why this ranks here. The registered operator is known. It affects only one 6 MW unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance35

  • Project scale (MW)8
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality19

  • Event type12
  • MW affected7

Wind unit commissioned — 6 MW

Borgentreich, Nordrhein-Westfalen · Operator: Bürgerwindpark Borgentreich GmbH & Co. KG

1 unit · 6 MW

Wind · Wind turbine (horizontal-axis)

1 wind unit (6 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 29 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
6 MW
Commissioning date
29 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 5 Oct 2026 → 6 Oct 2026
MaStR unit IDs: SEE941834521111
Commercial signals (1): cmuw9e33d2ca1wtd4tx40ox6x

Grouping basisSingle unit
Stable MaStR location ID: SEL902629129882
A single MaStR registration.
Commissioned asset
33Lead relevance · Low

Why this ranks here. The registered operator is known. It affects only one 4.2 MW unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance33

  • Project scale (MW)6
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality18

  • Event type12
  • MW affected6

Wind unit commissioned — 4.2 MW

Heiden, Nordrhein-Westfalen · Operator: Windkraft Heiden II GmbH & Co. KG

1 unit · 4.2 MW

Wind · Wind turbine (horizontal-axis)

1 wind unit (4.2 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 11 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
4.2 MW
Commissioning date
11 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 5 Oct 2026 → 6 Oct 2026
MaStR unit IDs: SEE972061653658
Commercial signals (1): cmuw9e33f2cbhwtd472d2jpkt

Grouping basisSingle unit
Stable MaStR location ID: SEL936641921797
A single MaStR registration.
Commissioned asset
33Lead relevance · Low

Why this ranks here. The registered operator is known. It affects only one 4.2 MW unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance33

  • Project scale (MW)6
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality18

  • Event type12
  • MW affected6

Wind unit commissioned — 4.2 MW

Sollerup, Schleswig-Holstein · Operator: Windpark Sollerup GmbH & Co. KG

1 unit · 4.2 MW

Wind · Wind turbine (horizontal-axis)

1 wind unit (4.2 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 21 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
4.2 MW
Commissioning date
21 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 5 Oct 2026 → 6 Oct 2026
MaStR unit IDs: SEE925964668458
Commercial signals (1): cmuw9e33b2c90wtd4p8j8ruv9

Grouping basisSingle unit
Stable MaStR location ID: SEL938354701253
A single MaStR registration.
Commissioned asset
31Lead relevance · Low

Why this ranks here. The registered operator is known. It affects only one 1.6 MW unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance31

  • Project scale (MW)4
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality16

  • Event type12
  • MW affected4

Energy unit commissioned — 1.6 MW

Seeland, Sachsen-Anhalt · Operator: Novelis Sheet Ingot GmbH

1 unit · 1.6 MW

Energy asset · ORC (Organic Rankine Cycle)-Anlage

1 energy unit (1.6 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 23 Sept 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
1.6 MW
Commissioning date
23 Sept 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 5 Oct 2026 → 6 Oct 2026
MaStR unit IDs: SEE925952681797
Commercial signals (1): cmuw9e33b2c8zwtd43rw2ae30

Grouping basisSingle unit
Stable MaStR location ID: SEL904734184190
A single MaStR registration.
Commissioned asset
31Lead relevance · Low

Why this ranks here. The registered operator is known. It affects only one 1.56 MW unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance31

  • Project scale (MW)4
  • Event type6
  • Lifecycle stage3
  • Recency8
  • Operator identified10

Signal materiality16

  • Event type12
  • MW affected4

Gas-generation unit commissioned — 1.56 MW

Gera, Thüringen · Operator: TWS Thüringer Wärme Service GmbH

1 unit · 1.56 MW

Gas generation · Verbrennungsmotor

1 gas-generation unit (1.56 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 22 Jan 2026.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.

  • MaStR evidence: HIGH
  • Registry only · external search not performed
O&M
MaStR recordOperating companyCommissioning news
Facts, hypotheses and how to verify
Registered capacity
1.56 MW
Commissioning date
22 Jan 2026
Lifecycle change
Planned → commissioned
  • Operations, maintenance and technical management services
  • Asset or company transaction advisory and technical due diligence
  • Confirm operating status and commissioning date in the official MaStR record
  • Identify the operating company and public information on service arrangements
  • Check for commissioning announcements
Evidence and source lineage

MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 5 Oct 2026 → 6 Oct 2026
MaStR unit IDs: SEE994295812809
Commercial signals (1): cmuw9e33g2cc7wtd4cm2s2l11

Grouping basisSingle unit
Stable MaStR location ID: SEL919610382478
A single MaStR registration.
↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.