Selected from the highest-scoring investigation signals, with category diversification to avoid repetitive results. Cards are ordered by opportunity score; a higher-scoring signal of an already well-represented type may appear in a section below. Scores are deterministic and are not probabilities. Everything here is a starting point for verification, not evidence of demand.
New planned asset73Lead relevance · High
Why this ranks high. Mid-sized 39.3 MW signal, 8 registrations moving together, the registered operator is known and external evidence identifies the project company and corroborates the development, increasing actionability.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance73
- Project scale (MW)19
- Event type20
- Lifecycle stage10
- Recency1
- Operator identified10
- Multi-unit evidence7
- External verification6
Signal materiality47
- Event type20
- MW affected14
- Units affected13
New planned wind development signal — 8 units / 39.3 MW
Horstmar, Nordrhein-Westfalen · Operator: Windpark Schöppinger Berg GmbH & Co. KG
8 planned units · 39.3 MW · First observed 29 Sept 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 01 Jan 2029
What changed
8 new planned wind units totalling 39.3 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Externally corroborated · 4 independent sources
Project corroboration does not establish procurement activity.
External evidence predates registry detection; newly observed does not necessarily mean a new project.
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 8
- Total registered capacity
- 39.3 MW
- Capacity per unit
- 4.26–6 MW per unit
- First observed in MaStR snapshot
- 29 Sept 2026
- Planned commissioning
- 01 Jan 2029
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
External evidence details
What we found
External verification: Corroborated
External sources corroborate a planned wind development in Horstmar associated with Windpark Schöppinger Berg GmbH & Co. KG. A public source also matches the registered project scale. At least one source refers to planning or permitting. Public project evidence found as early as 17 Jul 2025; GridGraph first observed the MaStR registration on 29 Sept 2026. No public procurement evidence was found in this verification run.
- Project company
- Windpark Schöppinger Berg GmbH & Co. KG
- Developer
- Not identified
- Project evidence
- Strong
- Commercial evidence
- None found
- Antrag gem. § 16b BImSchG der Windpark Schöppinger Berg GmbH & Co.KG für die Errichtung und den Betrieb von 8 Windenergieanlagen in 48612 Horstmar und den Rückbau von 11 Bestandsanlagen | UVP - UmweltverträglichkeitsprüfungenMunicipal planning document · uvp-verbund.de · Published 24 Sept 2026 · high confidenceSupports: project exists, company identity, location, unit count, project stageVerified from page text
- Kreis Steinfurt -Immissionsschutz- Az.: 67/3-566.0012/25/1.6Permit document · uvp-verbund.de · Publication date unknown · medium confidenceSupports: project exists, company identity, location, project stagePDF discovered · could not be read; judged from search excerpt only
- Windpark Schöppinger Berg GmbH & Co. KG, HorstmarCompany record · firmeneintrag.creditreform.de · Publication date unknown · medium confidenceSupports: company identity, locationJudged from search excerpt only4 copies of the same source counted once.
- Windpark Schöppinger Berg Standort Horstmar | Maps | proplanta.deCompany record · proplanta.de · Published 27 Oct 2026 · medium confidenceSupports: company identity, locationVerified from page text
- Öffentlichkeitsbeteiligung Repowering Windpark Schöppinger Berg GmbH & Co.KG | Gemeinde SchöppingenWeb page · schoeppingen.de · Published 17 Jul 2025 · medium confidenceSupports: project exists, company identity, location, unit count, project stageVerified from page text
- Bekanntmachung gemäß § 21a der 9. Verordnung zur Durchführung ...Permit document · kreis-borken.de · Published 30 Jun 2026 · low confidenceSupports: company identityVerified from PDF text · page 1“… ng mit § 10 Abs. 8 des Bundes-Immissionsschutzgesetzes Der Kreis Borken hat der Windpark Schöppinger Berg GmbH & Co. KG mit Sitz in 48629 Metelen, Naendorf 1 mit Datum vom 30.06.2026 eine Genehmigung nach §§ 16b und 6 Bundes-Immissionsschutzgesetz (BImSchG) für die Errichtung und den Betrieb von drei Windenergieanlagen des Typs Enercon (R …”
- Immissionsschutzrechtlicher GenehmigungsbescheidPermit document · kreis-borken.de · Publication date unknown · low confidenceSupports: company identityPDF discovered · could not be read; judged from search excerpt only
- Kreis Steinfurt Umweltamt -Immissionsschutz-Permit document · kreis-steinfurt.de · Publication date unknown · low confidenceSupports: company identityPDF discovered · could not be read; judged from search excerpt only
No public procurement evidence was found in this verification run.
4 independent external sources.
Registry lead relevance: 67 → After external verification: 73 (+6) +6: project corroborated and developer / project company identified by an external source.
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Corroborated — 4 independent external sources at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Grouping: Likely site group — Shared unit-name pattern (“repowering…”); Same planned/commissioning date on every unit
Presentation group: 8 registered MaStR units
Snapshot transition: First tracked snapshot → 29 Sept 2026
MaStR unit IDs: SEE905789814834, SEE959108034366, SEE981950209173, SEE996479529213, SEE999627549163, SEE955260246258, SEE942627960520, SEE940961906839
Commercial signals (8): cmum4wg3n3mh7wtus1t57a5pj, cmum4wg3o3mhzwtus19d9e8fq, cmum4wg3o3mi4wtusniy1amk8, cmum4wg3p3milwtusnk0anzps, cmum4wg3p3miowtuswn8xx87c, cmum4wg3p3mirwtusjdz6m1zu, cmum4wg3q3mj1wtusn3k0biv0, cmum4wg3q3mj7wtus7ljaup4v
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“repowering…”); Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (8)
New planned asset70Lead relevance · High
Why this ranks high. Mid-sized 21.6 MW signal, 3 registrations moving together, freshly registered planned asset and the registered operator is known. External corroboration is only partial.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance70
- Project scale (MW)15
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence5
- External verification2
Signal materiality39
- Event type20
- MW affected11
- Units affected8
New planned wind development signal — 3 units / 21.6 MW
Feuchtwangen, Bayern · Operator: nahKRAFT GmbH & Co. KG
3 planned units · 21.6 MW · First observed 27 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 01 Mar 2028
What changed
3 new planned wind units totalling 21.6 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Partially corroborated externally · 2 independent sources
Project corroboration does not establish procurement activity.
External evidence predates registry detection; newly observed does not necessarily mean a new project.
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 3
- Total registered capacity
- 21.6 MW
- Capacity per unit
- 7.2 MW each
- First observed in MaStR snapshot
- 27 Oct 2026
- Planned commissioning
- 01 Mar 2028
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
External evidence details
What we found
External verification: Partially corroborated
Some external sources mention a wind development in Feuchtwangen associated with nahKRAFT GmbH & Co. KG, but the match to the registered project is incomplete. Public project evidence found as early as 22 Nov 2024; GridGraph first observed the MaStR registration on 27 Oct 2026. No public procurement evidence was found in this verification run.
- Project company
- nahKRAFT GmbH & Co. KG (registered in MaStR; not confirmed externally)
- Developer
- nahKRAFT GmbH & Co. KG
- Project evidence
- Partial
- Commercial evidence
- None found
No public procurement evidence was found in this verification run.
2 independent external sources.
Registry lead relevance: 68 → After external verification: 70 (+2) +2: identity or project only partially corroborated.
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Partially corroborated — 2 independent external sources at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Grouping: Likely site group — Shared unit-name pattern (“untere haid…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 27 Oct 2026
MaStR unit IDs: SEE912947807218, SEE930434695384, SEE958978753001
Commercial signals (3): cmvqb31pi2towwt9c2ntacmbz, cmvqb31pj2tp6wt9c08ga1fqq, cmvqb31pj2tpewt9clrhs1frx
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“untere haid…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (3)
New planned asset69Lead relevance · High
Why this ranks high. Mid-sized 42 MW signal, 6 registrations moving together and the registered operator is known. External corroboration is only partial.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance69
- Project scale (MW)19
- Event type20
- Lifecycle stage10
- Recency1
- Operator identified10
- Multi-unit evidence7
- External verification2
Signal materiality46
- Event type20
- MW affected14
- Units affected12
New planned wind development signal — 6 units / 42 MW
Marburg, Hessen · Operator: INNEXIS Marburg GmbH
6 planned units · 42 MW · First observed 29 Sept 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 18 Sept 2029
What changed
6 new planned wind units totalling 42 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Partially corroborated externally · 1 independent source
Project corroboration does not establish procurement activity.
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 6
- Total registered capacity
- 42 MW
- Capacity per unit
- 7 MW each
- First observed in MaStR snapshot
- 29 Sept 2026
- Planned commissioning
- 18 Sept 2029
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
External evidence details
What we found
External verification: Partially corroborated
Some external sources mention a wind development in Marburg associated with INNEXIS Marburg GmbH, but the match to the registered project is incomplete. No public procurement evidence was found in this verification run.
- Project company
- INNEXIS Marburg GmbH
- Developer
- Not identified
- Project evidence
- Partial
- Commercial evidence
- None found
No public procurement evidence was found in this verification run.
1 independent external source.
Registry lead relevance: 67 → After external verification: 69 (+2) +2: identity or project only partially corroborated.
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Partially corroborated — 1 independent external source at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Grouping: Likely site group — Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 6 registered MaStR units
Snapshot transition: First tracked snapshot → 29 Sept 2026
MaStR unit IDs: SEE911402623516, SEE965306346835, SEE959836534169, SEE951336104873, SEE950553465736, SEE936588452781
Commercial signals (6): cmum4wg3n3mhbwtuscoepz2ee, cmum4wg3n3mhpwtus02rm2brr, cmum4wg3o3mhywtus90i9puum, cmum4wg3p3miuwtust3v0fgm1, cmum4wg3p3mivwtuszmt7oy9r, cmum4wg3q3mjawtusow4kqgy2
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (6)
Schedule change66Lead relevance · High
Why this ranks high. Large 50.04 MW multi-unit signal, 9 registrations moving together and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance66
- Project scale (MW)20
- Event type8
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence8
- Size of change2
Signal materiality54
- Event type16
- Size of change9
- MW affected15
- Units affected14
Commissioning delayed by up to 35 days — 9 units / 50.04 MW
Sundern (Sauerland), Nordrhein-Westfalen · Operator: Trianel Windpark Sundern GmbH & Co. KG
9 units · 50.04 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 12 Oct 2026 → 16 Nov 2026 (+35 days)
What changed
9 wind units registered a later planned commissioning date (+35 days).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 9
- Planned commissioning (same for every unit)
- 12 Oct 2026 → 16 Nov 2026 (+35 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“trianel windpark sundern…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 9 registered MaStR units
Snapshot transition: 26 Oct 2026 → 27 Oct 2026
MaStR unit IDs: SEE909559522608, SEE911161854077, SEE922361799297, SEE935467325901, SEE937358720741, SEE940584278870, SEE983517101128, SEE996159119062, SEE999312791471
Commercial signals (9): cmvqb31pi2topwt9clo55bno0, cmvqb31pi2toqwt9ctzl05ido, cmvqb31pi2tp1wt9cymudy19l, cmvqb31pj2tp7wt9ce6to4icu, cmvqb31pj2tp9wt9cfrn6h9ti, cmvqb31pj2tpawt9c3oa8de8i, cmvqb31pj2tprwt9cqz5lu0a7, cmvqb31pk2tpuwt9ccq54s29m, cmvqb31pk2tpwwt9cl8vsa0xt
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“trianel windpark sundern…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (9)
New planned asset66Lead relevance · High
Why this ranks high. Mid-sized 21.6 MW signal, 3 registrations moving together, freshly registered planned asset and external evidence corroborates the development, increasing actionability. Operator identity is unresolved, which reduces immediate actionability.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance66
- Project scale (MW)15
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified4
- Multi-unit evidence5
- External verification4
Signal materiality39
- Event type20
- MW affected11
- Units affected8
New planned wind development signal — 3 units / 21.6 MW
Wolfegg, Baden-Württemberg · Operator: Registered operator name not resolved
3 planned units · 21.6 MW · First observed 27 Oct 2026
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 31 Dec 2028
What changed
3 new planned wind units totalling 21.6 MW were first observed in this MaStR snapshot.
Why it may matter
A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Evidence
- MaStR evidence: HIGH
- Externally corroborated · 5 independent sources
Project corroboration does not establish procurement activity.
External evidence predates registry detection; newly observed does not necessarily mean a new project.
Possible relevance
Turbine supplyGrid connectionElectrical BOPCivil / foundationsEngineering
Verify next
PermitsDeveloper newsProcurement / tenders
Facts, hypotheses and how to verify
- Planned units first observed
- 3
- Total registered capacity
- 21.6 MW
- Capacity per unit
- 7.2 MW each
- First observed in MaStR snapshot
- 27 Oct 2026
- Planned commissioning
- 31 Dec 2028
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
How to verify
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
External evidence details
What we found
External verification: Corroborated
External sources corroborate a planned wind development in Wolfegg. A public source also matches the registered project scale. At least one source refers to planning or permitting. Public project evidence found as early as 22 Nov 2023; GridGraph first observed the MaStR registration on 27 Oct 2026. No public procurement evidence was found in this verification run.
- Project company
- Not resolved
- Developer
- Not identified
- Project evidence
- Strong
- Commercial evidence
- None found
- Windpark im Alttanner Wald wieder möglich | Schwäbische.deNews / press report · schwaebische.de · Published 28 Nov 2023 · high confidenceSupports: project exists, location, unit count, project stageVerified from page text
- Windpark Alttann fällt aus Teilregionalplan EnergieNews / press report · schwaebische.de · Published 22 Nov 2023 · high confidenceSupports: project exists, location, unit count, project stageVerified from page text
- Windpark Alttann – WikipediaWeb page · de.wikipedia.org · Published 19 Oct 2025 · medium confidenceSupports: project exists, location, capacity, unit count, project stage, commissioning timelineVerified from page text
- Wolfegg - Rund um Alttann - AllgäuWeb page · allgaeu.de · Publication date unknown · medium confidenceSupports: project exists, location, unit count, project stageVerified from page text
- Windpark Alttann | EnergiequelleWeb page · energiequelle.de · Publication date unknown · medium confidenceSupports: project exists, location, unit count, project stageVerified from page text
- Laufende Bauleitplanverfahren: Gemeinde WolfeggMunicipal planning document · wolfegg.de · Publication date unknown · low confidenceSupports: locationVerified from page text
- Suche: Gemeinde WolfeggMunicipal planning document · wolfegg.de · Publication date unknown · low confidenceSupports: locationJudged from search excerpt only
- Wolfegg und Vogt sagen Ja zu WindkraftNews / press report · schwaebische.de · Publication date unknown · low confidenceSupports: locationJudged from search excerpt only
No public procurement evidence was found in this verification run.
5 independent external sources.
Registry lead relevance: 62 → After external verification: 66 (+4) +4: project corroborated by a strong external source.
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Corroborated — 5 independent external sources at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Grouping: Likely site group — Shared unit-name pattern (“wp alttann…”); Identical registered capacity; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 27 Oct 2026
MaStR unit IDs: SEE912245775653, SEE947468591759, SEE950832667028
Commercial signals (3): cmvqb31pi2touwt9cfrkou3so, cmvqb31pj2tpcwt9cfdaxwaxw, cmvqb31pj2tpdwt9cosobx5k6
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp alttann…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (3)
Schedule change59Lead relevance · Moderate
Why this ranks here. Large 120 MW multi-unit signal and the registered operator is known. Short date shifts are common registry maintenance; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance59
- Project scale (MW)23
- Event type4
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence3
- Size of change1
Signal materiality43
- Event type16
- Size of change4
- MW affected18
- Units affected5
Commissioning delayed by up to 14 days — 2 units / 120 MW
Hessen · Operator: Mainova AG
2 units · 120 MW
Gas generation · Gasturbinen mit Abhitzekessel
Planned commissioning: 09 Nov 2026 → 23 Nov 2026 (+14 days)
What changed
2 gas-generation units registered a later planned commissioning date (+14 days).
Why it may matter
A short date shift is common and may be routine registry maintenance. Worth attention mainly if it is part of a wider pattern.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 2
- Planned commissioning (same for every unit)
- 09 Nov 2026 → 23 Nov 2026 (+14 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“hkw west block…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 26 Oct 2026 → 27 Oct 2026
MaStR unit IDs: SEE900931819460, SEE918810715130
Commercial signals (2): cmvqb31pi2toowt9c5s4ybffk, cmvqb31pi2toywt9c66aaefu6
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“hkw west block…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (2)
Capacity change54Lead relevance · Moderate
Why this ranks here. The registered operator is known. It affects only one 7 MW unit; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance54
- Project scale (MW)9
- Event type14
- Lifecycle stage10
- Recency8
- Operator identified10
- Size of change3
Signal materiality37
- Event type18
- Size of change12
- MW affected7
Registered wind capacity increased (+1.3 MW) — 7 MW — MaStR SEE977417351004
Hedwigenkoog, Schleswig-Holstein · Operator: Deichwind GmbH & Co. KG
1 unit · 7 MW
Wind · Wind turbine (horizontal-axis)
What changed
Registered capacity changed from 5.7 MW to 7 MW (+1.3 MW, +23%).
Why it may matter
A larger registered capacity may indicate a changed project design, turbine or equipment choice, or grid-connection scope, and could affect engineering and equipment requirements.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Design / technologyGrid connectionEngineeringEquipment sizing
Verify next
Design change?Permit & grid documentsDeveloper updates
Facts, hypotheses and how to verify
- Registered capacity
- 5.7 MW → 7 MW (+1.3 MW / +23%)
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
How to verify
- Check whether the change reflects a design or turbine-model change
- Compare with permit and grid-connection documents
- Look for recent developer announcements
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 26 Oct 2026 → 27 Oct 2026
MaStR unit IDs: SEE977417351004
Commercial signals (1): cmvqb31pj2tpkwt9c2mlxv644
Grouping basisSingle unit
A single MaStR registration.
Underlying registrations (1)
Capacity change54Lead relevance · Moderate
Why this ranks here. The registered operator is known. It affects only one 7 MW unit; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance54
- Project scale (MW)9
- Event type14
- Lifecycle stage10
- Recency8
- Operator identified10
- Size of change3
Signal materiality37
- Event type18
- Size of change12
- MW affected7
Registered wind capacity increased (+1.3 MW) — 7 MW — MaStR SEE923452877641
Hedwigenkoog, Schleswig-Holstein · Operator: Windpark von Hemm GmbH & Co. KG
1 unit · 7 MW
Wind · Wind turbine (horizontal-axis)
What changed
Registered capacity changed from 5.7 MW to 7 MW (+1.3 MW, +23%).
Why it may matter
A larger registered capacity may indicate a changed project design, turbine or equipment choice, or grid-connection scope, and could affect engineering and equipment requirements.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Design / technologyGrid connectionEngineeringEquipment sizing
Verify next
Design change?Permit & grid documentsDeveloper updates
Facts, hypotheses and how to verify
- Registered capacity
- 5.7 MW → 7 MW (+1.3 MW / +23%)
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
How to verify
- Check whether the change reflects a design or turbine-model change
- Compare with permit and grid-connection documents
- Look for recent developer announcements
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 26 Oct 2026 → 27 Oct 2026
MaStR unit IDs: SEE923452877641
Commercial signals (1): cmvqb31pi2tp2wt9cyfuft848
Grouping basisSingle unit
A single MaStR registration.
Underlying registrations (1)