Schedule change
51Lead relevance · Moderate

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance51

  • Project scale (MW)10
  • Event type8
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3
  • Size of change2

Signal materiality36

  • Event type16
  • Size of change8
  • MW affected7
  • Units affected5

Commissioning delayed by up to 31 days — 2 units / 8.07 MW

Frankfurt am Main, Hessen · Operator: Mainova AG

2 units · 8.07 MW

Asset typeSonstige
Energy carrierErdgas
Registered operatorMainova AG

2 gas-generation units registered a later planned commissioning date (+31 days).

Why this ranks here. The registered operator is known. Small combined capacity (8.07 MW); no external evidence yet.

A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Developer servicesEngineeringMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Units with a new planned date
2
Planned commissioning (same for every unit)
23 Oct 2026 → 23 Nov 2026 (+31 days)

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“hkw west…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Asset type (MaStR)
Sonstige
Energy carrier (MaStR)
Erdgas
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

26 Oct 2026 → 27 Oct 2026

← Back to the brief · 2026-10-27