Schedule change67Lead relevance · High
Why this ranks high. Mid-sized 36 MW signal, unusually large schedule shift (184 days) and the registered operator is known. The grouping evidence is limited; it may still reflect a registry correction rather than a new commercial need.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance67
- Project scale (MW)18
- Event type12
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence4
- Size of change5
Signal materiality60
- Event type16
- Size of change18
- MW affected14
- Units affected12
Commissioning rescheduled — 6 units / 36 MW
Brakel, Nordrhein-Westfalen · Operator: Windpark Brakel Modexen GmbH & Co. KG
6 units · 36 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 30 Jun 2026 – 02 Oct 2028
What changed
6 wind units registered a changed planned commissioning date (-106 days to +184 days).
Why it may matter
A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 6
- Planned commissioning before
- 30 Jun 2026 – 02 Oct 2028
- Planned commissioning now
- 31 Dec 2026 – 18 Jun 2028
- Shift per unit
- -106 to +184 days
- Direction
- 1 later, 5 earlier
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Conservative group — Identical registered capacity
Presentation group: 6 registered MaStR units
Snapshot transition: 6 Oct 2026 → 15 Oct 2026
MaStR unit IDs: SEE935124201180, SEE966882375998, SEE950375424249, SEE955913444895, SEE912988239399, SEE906898020611
Commercial signals (6): cmvb9v0kt139wwtdw69h93wdb, cmvb9v0kv13bpwtdwao6egq5e, cmvb9v0ku13aowtdwntoovb92, cmvb9v0ku13axwtdwyacg3a4b, cmvb9v0kr138rwtdw6g11nl9c, cmvb9v0kq138ewtdwlmrwqpon
Grouping basisConservative group
Supporting registry evidence: Identical registered capacity
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Underlying registrations (6)
Schedule change64Lead relevance · High
Why this ranks high. Mid-sized 13.5 MW signal, 3 registrations moving together, unusually large schedule shift (385 days) and the registered operator is known. It may still reflect a registry correction rather than a new commercial need.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance64
- Project scale (MW)13
- Event type12
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence5
- Size of change6
Signal materiality55
- Event type16
- Size of change22
- MW affected9
- Units affected8
Commissioning delayed by up to 385 days — 3 units / 13.5 MW
Frechen, Nordrhein-Westfalen · Operator: Energiepark Frechen WP GmbH & Co. KG
3 units · 13.5 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: Jun 2026 → Jul 2027 (+385 days)
What changed
3 wind units registered a later planned commissioning date (+385 days).
Why it may matter
A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 3
- Planned commissioning (same for every unit)
- Jun 2026 → Jul 2027 (+385 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 3 registered MaStR units
Snapshot transition: 6 Oct 2026 → 15 Oct 2026
MaStR unit IDs: SEE995094827391, SEE911014313560, SEE929582252976
Commercial signals (3): cmvb9v0ky13d2wtdwt1ylakee, cmvb9v0kr138nwtdwhvzv8ent, cmvb9v0ks139lwtdw2krvfdk2
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (3)
Schedule change61Lead relevance · High
Why this ranks high. Mid-sized 27.2 MW signal, 4 registrations moving together and the registered operator is known.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance61
- Project scale (MW)16
- Event type8
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence6
- Size of change3
Signal materiality49
- Event type16
- Size of change11
- MW affected12
- Units affected10
Commissioning delayed by up to 52 days — 4 units / 27.2 MW
Meyenburg, Brandenburg · Operator: KWE Windpark Meyenburg Zwei GmbH & Co. KG
4 units · 27.2 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 24 Sept – 02 Dec 2026
What changed
4 wind units registered a later planned commissioning date (+9 days to +52 days).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 4
- Planned commissioning before
- 24 Sept – 02 Dec 2026
- Planned commissioning now
- 15 Oct – 31 Dec 2026
- Shift per unit
- +9 to +52 days
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Planned/commissioning dates within 77 days of each other
Presentation group: 4 registered MaStR units
Snapshot transition: 6 Oct 2026 → 15 Oct 2026
MaStR unit IDs: SEE907165464749, SEE944425963253, SEE993341144499, SEE990837459846
Commercial signals (4): cmvb9v0kq138fwtdwefpp6dkg, cmvb9v0kt13adwtdwo7hkk9em, cmvb9v0kx13cxwtdwf0ha49pj, cmvb9v0kx13cuwtdwjq57j62d
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Planned/commissioning dates within 77 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (4)
Schedule change59Lead relevance · Moderate
Why this ranks here. The registered operator is known. Small combined capacity (12.4 MW); no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance59
- Project scale (MW)12
- Event type12
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence3
- Size of change4
Signal materiality46
- Event type16
- Size of change16
- MW affected9
- Units affected5
Commissioning delayed by up to 124 days — 2 units / 12.4 MW
Richtenberg, Mecklenburg-Vorpommern · Operator: Windpark Grünkordshagen-Zandershagen GmbH & Co. KG
2 units · 12.4 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: Sept 2026 → Jan 2027 (+124 days)
What changed
2 wind units registered a later planned commissioning date (+124 days).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 2
- Planned commissioning (same for every unit)
- Sept 2026 → Jan 2027 (+124 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“grüza…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 6 Oct 2026 → 15 Oct 2026
MaStR unit IDs: SEE960733787619, SEE980443028888
Commercial signals (2): cmvb9v0kv13bawtdwxqcy8egp, cmvb9v0kx13cnwtdwfx9qhpzf
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“grüza…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (2)
Schedule change59Lead relevance · Moderate
Why this ranks here. The registered operator is known. Small combined capacity (11.12 MW); no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance59
- Project scale (MW)12
- Event type12
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence3
- Size of change4
Signal materiality43
- Event type16
- Size of change14
- MW affected8
- Units affected5
Commissioning delayed by up to 91 days — 2 units / 11.12 MW
Nideggen, Nordrhein-Westfalen · Operator: Energiepark Nideggen WP Wollersheim-Süd GmbH & Co. KG
2 units · 11.12 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: Jul 2027 → Sept 2027 (+91 days)
What changed
2 wind units registered a later planned commissioning date (+91 days).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 2
- Planned commissioning (same for every unit)
- Jul 2027 → Sept 2027 (+91 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
Presentation group: 2 registered MaStR units
Snapshot transition: 6 Oct 2026 → 15 Oct 2026
MaStR unit IDs: SEE974879084358, SEE969693002466
Commercial signals (2): cmvb9v0kw13c8wtdwqzbmcll9, cmvb9v0kw13bwwtdwmhmpujlh
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (2)
Schedule change58Lead relevance · Moderate
Why this ranks here. Mid-sized 20.4 MW signal, 3 registrations moving together and the registered operator is known. No external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance58
- Project scale (MW)15
- Event type8
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence5
- Size of change2
Signal materiality44
- Event type16
- Size of change9
- MW affected11
- Units affected8
Commissioning delayed by up to 37 days — 3 units / 20.4 MW
Gehlsbach, Mecklenburg-Vorpommern · Operator: UGE Klein Dammerow Eins GmbH & Co. KG Umweltgerechte Energie
3 units · 20.4 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 24 Sept – 19 Nov 2026
What changed
3 wind units registered a later planned commissioning date (+26 days to +37 days).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 3
- Planned commissioning before
- 24 Sept – 19 Nov 2026
- Planned commissioning now
- 31 Oct – 15 Dec 2026
- Shift per unit
- +26 to +37 days
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“klein dammerow…”); Identical registered capacity; Planned/commissioning dates within 45 days of each other
Presentation group: 3 registered MaStR units
Snapshot transition: 6 Oct 2026 → 15 Oct 2026
MaStR unit IDs: SEE930932231916, SEE900378116900, SEE953797850870
Commercial signals (3): cmvb9v0ks139rwtdwqpmr6rq1, cmvb9v0kq1382wtdw2sc51hqf, cmvb9v0ku13atwtdw4egvfd6h
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“klein dammerow…”); Identical registered capacity; Planned/commissioning dates within 45 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (3)
Schedule change55Lead relevance · Moderate
Why this ranks here. Mid-sized 13.6 MW signal and the registered operator is known. No external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance55
- Project scale (MW)13
- Event type8
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence3
- Size of change3
Signal materiality41
- Event type16
- Size of change11
- MW affected9
- Units affected5
Commissioning delayed by up to 49 days — 2 units / 13.6 MW
Ganzlin, Mecklenburg-Vorpommern · Operator: UGE Klein Dammerow Eins GmbH & Co. KG Umweltgerechte Energie
2 units · 13.6 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 22 Oct – 12 Nov 2026
What changed
2 wind units registered a later planned commissioning date (+9 days to +49 days).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Units with a new planned date
- 2
- Planned commissioning before
- 22 Oct – 12 Nov 2026
- Planned commissioning now
- 31 Oct – 31 Dec 2026
- Shift per unit
- +9 to +49 days
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Likely site group — Shared unit-name pattern (“klein dammerow…”); Identical registered capacity; Planned/commissioning dates within 61 days of each other
Presentation group: 2 registered MaStR units
Snapshot transition: 6 Oct 2026 → 15 Oct 2026
MaStR unit IDs: SEE909275630182, SEE920335417680
Commercial signals (2): cmvb9v0kr138iwtdwhsbhquj3, cmvb9v0ks1396wtdwjvdd81ur
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“klein dammerow…”); Identical registered capacity; Planned/commissioning dates within 61 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Underlying registrations (2)
Schedule change51Lead relevance · Moderate
Why this ranks here. The registered operator is known. It affects only one 4.5 MW unit; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance51
- Project scale (MW)7
- Event type12
- Lifecycle stage10
- Recency8
- Operator identified10
- Size of change4
Signal materiality37
- Event type16
- Size of change15
- MW affected6
Commissioning delayed by 99 days — 4.5 MW
Welterod, Rheinland-Pfalz · Operator: ABO Wind WP Welterod GmbH & Co. KG
1 unit · 4.5 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: Sept 2026 → Dec 2026 (+99 days)
What changed
The registered planned commissioning date moved by +99 days (Sept 2026 → Dec 2026).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Planned commissioning
- Sept 2026 → Dec 2026 (+99 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 6 Oct 2026 → 15 Oct 2026
MaStR unit IDs: SEE933607589978
Commercial signals (1): cmvb9v0kt139uwtdw9kkyechx
Grouping basisSingle unit
A single MaStR registration.
Underlying registrations (1)
Schedule change49Lead relevance · Moderate
Why this ranks here. Unusually large schedule shift (377 days) and the registered operator is known. It affects only one 1.03 MW unit; it may still reflect a registry correction rather than a new commercial need; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance49
- Project scale (MW)3
- Event type12
- Lifecycle stage10
- Recency8
- Operator identified10
- Size of change6
Signal materiality41
- Event type16
- Size of change22
- MW affected3
Commissioning delayed by 377 days — 1.03 MW
Bad Salzuflen, Nordrhein-Westfalen · Operator: Stadtwerke Bad Salzuflen GmbH
1 unit · 1.03 MW
Gas generation · Verbrennungsmotor
Planned commissioning: Nov 2025 → Nov 2026 (+377 days)
What changed
The registered planned commissioning date moved by +377 days (Nov 2025 → Nov 2026).
Why it may matter
A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Planned commissioning
- Nov 2025 → Nov 2026 (+377 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Related registry activity
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 6 Oct 2026 → 15 Oct 2026
MaStR unit IDs: SEE902842417537
Commercial signals (1): cmvb9v0kq1386wtdw3b19ytsh
Grouping basisSingle unit
A single MaStR registration.
Underlying registrations (1)
Schedule change48Lead relevance · Moderate
Why this ranks here. The registered operator is known. It affects only one 1.95 MW unit; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance48
- Project scale (MW)4
- Event type12
- Lifecycle stage10
- Recency8
- Operator identified10
- Size of change4
Signal materiality37
- Event type16
- Size of change17
- MW affected4
Commissioning delayed by 153 days — 1.95 MW
Bad Bentheim, Niedersachsen · Operator: B.E.S. GmbH & Co. KG
1 unit · 1.95 MW
Biomass · Verbrennungsmotor
Planned commissioning: Sept 2026 → Feb 2027 (+153 days)
What changed
The registered planned commissioning date moved by +153 days (Sept 2026 → Feb 2027).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Planned commissioning
- Sept 2026 → Feb 2027 (+153 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 6 Oct 2026 → 15 Oct 2026
MaStR unit IDs: SEE957887068664
Commercial signals (1): cmvb9v0ku13b3wtdwid4ftyv3
Grouping basisSingle unit
A single MaStR registration.
Underlying registrations (1)
Schedule change47Lead relevance · Moderate
Why this ranks here. The registered operator is known. It affects only one 6 MW unit; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance47
- Project scale (MW)8
- Event type8
- Lifecycle stage10
- Recency8
- Operator identified10
- Size of change3
Signal materiality35
- Event type16
- Size of change12
- MW affected7
Commissioning delayed by 61 days — 6 MW
Richtenberg, Mecklenburg-Vorpommern · Operator: Energieallianz MV Projekt Nr. 7 GmbH & Co. KG
1 unit · 6 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: Sept 2026 → Nov 2026 (+61 days)
What changed
The registered planned commissioning date moved by +61 days (Sept 2026 → Nov 2026).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Planned commissioning
- Sept 2026 → Nov 2026 (+61 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 6 Oct 2026 → 15 Oct 2026
MaStR unit IDs: SEE994345245526
Commercial signals (1): cmvb9v0kx13czwtdwz36a1tdu
Grouping basisSingle unit
A single MaStR registration.
Underlying registrations (1)
Schedule change47Lead relevance · Moderate
Why this ranks here. The registered operator is known. It affects only one 5.7 MW unit; no external evidence yet.
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance47
- Project scale (MW)8
- Event type8
- Lifecycle stage10
- Recency8
- Operator identified10
- Size of change3
Signal materiality35
- Event type16
- Size of change12
- MW affected7
Commissioning delayed by 58 days — 5.7 MW
Bedburg, Nordrhein-Westfalen · Operator: NHR Windenergie GmbH & Co.KG
1 unit · 5.7 MW
Wind · Wind turbine (horizontal-axis)
Planned commissioning: 30 Sept 2026 → 27 Nov 2026 (+58 days)
What changed
The registered planned commissioning date moved by +58 days (30 Sept 2026 → 27 Nov 2026).
Why it may matter
A registered schedule move of this size may reflect ordinary rescheduling and could shift when supplier or service requirements arise.
Evidence
- MaStR evidence: HIGH
- Registry only · external search not performed
Possible relevance
Project schedulingEngineeringConstruction timingSupplier timing
Verify next
Registry correction?Permit & construction statusDeveloper updates
Facts, hypotheses and how to verify
- Planned commissioning
- 30 Sept 2026 → 27 Nov 2026 (+58 days)
- Project development or development-management services
- Engineering and environmental services
How to verify
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Evidence and source lineage
MaStR evidence confidence: HIGH — strength of the MaStR evidence for the change itself, not of any commercial opportunity.
External verification: Not checked — no sources outside MaStR have been consulted.
Grouping: Single unit
Presentation group: 1 registered MaStR unit
Snapshot transition: 6 Oct 2026 → 15 Oct 2026
MaStR unit IDs: SEE946301031223
Commercial signals (1): cmvb9v0kt13aewtdwdc5poxbz
Grouping basisSingle unit
A single MaStR registration.
Underlying registrations (1)