63Lead relevance · High
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance63
- Project scale (MW)13
- Event type14
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence3
- Size of change5
Signal materiality52
- Event type18
- Size of change20
- MW affected9
- Units affected5
Registered wind capacity reduced (-14 MW) — 2 units / 14 MW
Gutow, Mecklenburg-Vorpommern · Operator: Projekt Windmüller Drgala GmbH
2 units · 14 MW
- MaStR evidence: HIGH
- Registry only · external search not performed
What changed
2 wind units registered a capacity change; combined registered capacity moved from 28 MW to 14 MW (-14 MW).
Why this ranks high. Mid-sized 14 MW signal and the registered operator is known.
Why it may matter
Possible relevance
Investigation hypotheses only. They are not evidence that any of these needs currently exist.
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
Verify next
- Check whether the change reflects a design or turbine-model change
- Compare with permit and grid-connection documents
- Look for recent developer announcements
Change summary
- Per-unit change
- 2 units changed from 14 MW to 7 MW each
- Combined registered capacity now
- 14 MW
- Combined change
- -14 MW (-50%)
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (2)
SEE954682631222View official MaStR record ↗SEE965850479850View official MaStR record ↗
Grouping basis
Supporting registry evidence: Shared unit-name pattern (“bülow e…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
MaStR technical details
- Asset type (MaStR)
- Horizontalläufer
- Energy carrier (MaStR)
- Wind
- Operating status (MaStR)
- In Planung
Evidence confidence
MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.
Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.
Snapshot transition
6 Oct 2026 → 15 Oct 2026