65Lead relevance · High
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance65
- Project scale (MW)15
- Event type14
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence5
- Size of change3
Signal materiality47
- Event type18
- Size of change10
- MW affected11
- Units affected8
Registered wind capacity increased (+3 MW) — 3 units / 21 MW
Braunshorn, Rheinland-Pfalz · Operator: Höhenwind-Park GmbH
3 units · 21 MW
- MaStR evidence: HIGH
- Registry only · external search not performed
What changed
3 wind units registered a capacity change; combined registered capacity moved from 18 MW to 21 MW (+3 MW).
Why this ranks high. Mid-sized 21 MW signal, 3 registrations moving together and the registered operator is known.
Why it may matter
Possible relevance
Investigation hypotheses only. They are not evidence that any of these needs currently exist.
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
Verify next
- Check whether the change reflects a design or turbine-model change
- Compare with permit and grid-connection documents
- Look for recent developer announcements
Change summary
- Per-unit change
- 3 units changed from 6 MW to 7 MW each
- Combined registered capacity now
- 21 MW
- Combined change
- +3 MW (+17%)
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (3)
SEE948479714571View official MaStR record ↗SEE915766142553View official MaStR record ↗SEE962345116023View official MaStR record ↗
Grouping basis
Supporting registry evidence: Shared unit-name pattern (“ebschied…”); Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
MaStR technical details
- Asset type (MaStR)
- Horizontalläufer
- Energy carrier (MaStR)
- Wind
- Operating status (MaStR)
- In Planung
Evidence confidence
MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.
Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.
Snapshot transition
5 Oct 2026 → 6 Oct 2026