Multiple changes
61Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance61

  • Project scale (MW)9
  • Event type14
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Several changes together5
  • Size of change5

Signal materiality51

  • Event type18
  • Size of change20
  • MW affected7
  • Several changes together6

Multiple registry changes (capacity + schedule) — 7 MW

Klingelbach, Rheinland-Pfalz · Operator: K&S regenerative Energie GmbH & Co.KG

1 unit · 7 MW

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorK&S regenerative Energie GmbH & Co.KG

Registered capacity changed from 4.26 MW to 7 MW (+2.74 MW, +64%). The registered planned commissioning date moved by +150 days (Jan 2029 → May 2029).

Why this ranks high. Capacity and schedule changes recorded together on the same units and the registered operator is known. It affects only one 7 MW unit.

Several registry changes were recorded together on the same units. That may indicate a substantive update to the project rather than a routine correction, and is worth investigating.
Developer servicesGrid & electricalEngineeringMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Registered capacity
4.26 MW → 7 MW (+2.74 MW / +64%)
Planned commissioning
Jan 2029 → May 2029 (+150 days)

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisSingle unit
A single MaStR registration.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

28 Sept 2026 → 29 Sept 2026

← Back to the brief · 2026-09-29