65Lead relevance · High
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance65
- Project scale (MW)17
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified4
- Multi-unit evidence6
Signal materiality43
- Event type20
- MW affected13
- Units affected10
New planned wind development signal — 4 units / 28.8 MW
Beverungen, Nordrhein-Westfalen · Operator: Operator ID ABR907249431964 (name not resolved)
4 planned units · 28.8 MW · First observed 03 Nov 2026
- MaStR evidence: HIGH
- Search or evidence retrieval incomplete
What changed
4 new planned wind units totalling 28.8 MW were first observed in this MaStR snapshot.
Why this ranks high. Mid-sized 28.8 MW signal, 4 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.
What we found
External verification: Search or evidence retrieval incomplete
External search or evidence retrieval could not be completed. This opportunity needs another verification attempt.
- Project company
- Not resolved
- Developer
- Not identified
- Project evidence
- None
- Commercial evidence
- None found
- - 1 - Stellungnahme Stadt Beverungen zur 2. Änderung des ...“• Stellungnahme der Stadt Beverungen zur 2. Änderung des LEP NRW • Ratsbeschluss vom 22.06.2023 • - 3 - Auf dem Gebiet der Stadt Beverungen sind bereits jetzt 37 Anlagen mit einer Leistung von 52,6 MW installiert. Das entspricht 21,02 % der Anlagen und 19,75 % der Leistung der Anlagen im Kreis Höxter mit seinen 10 Kommunen. Auch der aktue …”
- FREIFLÄCHEN-PHOTOVOLTAIKANLAGE AM ...“FF-PVA am Twerberg 57. Änderung des Flächennutzungsplans der Stadt Beverungen Begründung mit Umweltbericht – Offenlegungsexemplar Stand: 24.09.2025 4 mit PV-Modulen bestückt (vgl. 5.2). Diese werden somit nur auf der östlichen Teilfläche A16 installiert. Die Teilflächen A26 und A3 werden komplett beplant (vgl. BIOPLAN 2025). Die Erweiteru …”
- Aktuelle Verfahren (FNP und BP) – Stadt Beverungen
No public procurement evidence was found in this verification run.
No independent external sources.
Registry lead relevance: 65 (unchanged by external verification)
Why it may matter
Possible relevance
Investigation hypotheses only. They are not evidence that any of these needs currently exist.
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
Verify next
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Change summary
- Planned units first observed
- 4
- Total registered capacity
- 28.8 MW
- Capacity per unit
- 7.2 MW each
- First observed in MaStR snapshot
- 03 Nov 2026
- Planned commissioning
- 31 Oct 2028
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (4)
SEE909046211848View official MaStR record ↗SEE948606419560View official MaStR record ↗SEE968517821634View official MaStR record ↗SEE988879588693View official MaStR record ↗
Grouping basis
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
MaStR technical details
- Asset type (MaStR)
- Horizontalläufer
- Energy carrier (MaStR)
- Wind
- Operating status (MaStR)
- In Planung
Evidence confidence
MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: search or evidence retrieval incomplete; Search or evidence retrieval incomplete
Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.
Snapshot transition
First tracked snapshot → 3 Nov 2026