New planned asset
65Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance65

  • Project scale (MW)17
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence6

Signal materiality43

  • Event type20
  • MW affected13
  • Units affected10

New planned wind development signal — 4 units / 28.8 MW

Beverungen, Nordrhein-Westfalen · Operator: Operator ID ABR907249431964 (name not resolved)

4 planned units · 28.8 MW · First observed 03 Nov 2026

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorOperator ID ABR907249431964 (name not resolved)

4 new planned wind units totalling 28.8 MW were first observed in this MaStR snapshot.

Why this ranks high. Mid-sized 28.8 MW signal, 4 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability.

External verification: Search or evidence retrieval incomplete

External search or evidence retrieval could not be completed. This opportunity needs another verification attempt.

Project company
Not resolved
Developer
Not identified
Project evidence
None
Commercial evidence
None found
  • - 1 - Stellungnahme Stadt Beverungen zur 2. Änderung des ...Municipal planning document · landesplanung.nrw.de · Published 22 Jun 2023 · low confidenceSupports: locationVerified from PDF text · page 3“• Stellungnahme der Stadt Beverungen zur 2. Änderung des LEP NRW • Ratsbeschluss vom 22.06.2023 • - 3 - Auf dem Gebiet der Stadt Beverungen sind bereits jetzt 37 Anlagen mit einer Leistung von 52,6 MW installiert. Das entspricht 21,02 % der Anlagen und 19,75 % der Leistung der Anlagen im Kreis Höxter mit seinen 10 Kommunen. Auch der aktue …”Older source: weighed lower unless it clearly describes the same ongoing project.
  • FREIFLÄCHEN-PHOTOVOLTAIKANLAGE AM ...Municipal planning document · beverungen.de · Published 25 Sept 2025 · low confidenceSupports: locationVerified from PDF text · page 9“FF-PVA am Twerberg 57. Änderung des Flächennutzungsplans der Stadt Beverungen Begründung mit Umweltbericht – Offenlegungsexemplar Stand: 24.09.2025 4 mit PV-Modulen bestückt (vgl. 5.2). Diese werden somit nur auf der östlichen Teilfläche A16 installiert. Die Teilflächen A26 und A3 werden komplett beplant (vgl. BIOPLAN 2025). Die Erweiteru …”
  • Aktuelle Verfahren (FNP und BP) – Stadt BeverungenMunicipal planning document · beverungen.de · Publication date unknown · low confidenceSupports: locationVerified from page text

No public procurement evidence was found in this verification run.

No independent external sources.

Registry lead relevance: 65 (unchanged by external verification) External search or evidence retrieval was incomplete; registry score unchanged.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Developer servicesGrid & electricalEngineeringCivil / BOPMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Planned units first observed
4
Total registered capacity
28.8 MW
Capacity per unit
7.2 MW each
First observed in MaStR snapshot
03 Nov 2026
Planned commissioning
31 Oct 2028

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: search or evidence retrieval incomplete; Search or evidence retrieval incomplete

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

First tracked snapshot → 3 Nov 2026