52Lead relevance · Moderate
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance52
- Project scale (MW)8
- Event type14
- Lifecycle stage10
- Recency8
- Operator identified10
- Size of change2
Signal materiality34
- Event type18
- Size of change9
- MW affected7
Registered wind capacity reduced (-1 MW) — 6 MW
Arnsberg, Nordrhein-Westfalen · Operator: VERBUND Green Power Deutschland GmbH
1 unit · 6 MW
- MaStR evidence: HIGH
- Registry only · external search not performed
What changed
Registered capacity changed from 7 MW to 6 MW (-1 MW, -14%).
Why this ranks here. The registered operator is known. It affects only one 6 MW unit; no external evidence yet.
Why it may matter
Possible relevance
Investigation hypotheses only. They are not evidence that any of these needs currently exist.
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
Verify next
- Check whether the change reflects a design or turbine-model change
- Compare with permit and grid-connection documents
- Look for recent developer announcements
Change summary
- Registered capacity
- 7 MW → 6 MW (-1 MW / -14%)
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (1)
SEE910489791477View official MaStR record ↗
Grouping basis
A single MaStR registration.
MaStR technical details
- Asset type (MaStR)
- Horizontalläufer
- Energy carrier (MaStR)
- Wind
- Operating status (MaStR)
- In Planung
Evidence confidence
MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.
Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.
Snapshot transition
28 Oct 2026 → 3 Nov 2026