New planned asset
62Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance62

  • Project scale (MW)12
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence2

Signal materiality34

  • Event type20
  • MW affected9
  • Units affected5

New planned wind units — 2 units / 13.2 MW

Greußen, Thüringen · Operator: BOREAS Energie GmbH

2 planned units · 13.2 MW · First observed 28 Sept 2026

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorBOREAS Energie GmbH

2 new planned wind units totalling 13.2 MW were first observed in this MaStR snapshot.

Why this ranks high. Freshly registered planned asset and the registered operator is known. Small combined capacity (13.2 MW); the grouping evidence is limited.

A newly registered planned asset may be an early sign of a development worth a quick look.
Developer servicesGrid & electricalEngineeringCivil / BOPMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Planned units first observed
2
Total registered capacity
13.2 MW
Capacity per unit
6–7.2 MW per unit
First observed in MaStR snapshot
28 Sept 2026
Planned commissioning
31 Dec 2028

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisConservative group
Supporting registry evidence: Same planned/commissioning date on every unit
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

First tracked snapshot → 28 Sept 2026

← Back to the brief · 2026-09-28