New planned asset
63Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance63

  • Project scale (MW)12
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3

Signal materiality34

  • Event type20
  • MW affected9
  • Units affected5

New planned wind development signal — 2 units / 12 MW

Rehna, Mecklenburg-Vorpommern · Operator: KNE Windpark Nr. 17 GmbH & Co. KG

2 planned units · 12 MW · First observed 02 Oct 2026

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorKNE Windpark Nr. 17 GmbH & Co. KG

2 new planned wind units totalling 12 MW were first observed in this MaStR snapshot.

Why this ranks high. Freshly registered planned asset and the registered operator is known. Small combined capacity (12 MW).

A newly registered planned asset may be an early sign of a development worth a quick look.
Developer servicesGrid & electricalEngineeringCivil / BOPMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Planned units first observed
2
Total registered capacity
12 MW
Capacity per unit
6 MW each
First observed in MaStR snapshot
02 Oct 2026
Planned commissioning
01 Oct 2029

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

First tracked snapshot → 2 Oct 2026

← Back to the brief · 2026-10-02