62Lead relevance · High
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance62
- Project scale (MW)12
- Event type20
- Lifecycle stage10
- Recency7
- Operator identified10
- Multi-unit evidence3
Signal materiality33
- Event type20
- MW affected8
- Units affected5
New planned wind development signal — 2 units / 11.12 MW
Northeim, Niedersachsen · Operator: Energiekontor AG
2 planned units · 11.12 MW · First observed 22 Oct 2026
- MaStR evidence: HIGH
- Registry only · external search performed; no project corroboration
What changed
2 new planned wind units totalling 11.12 MW were first observed in this MaStR snapshot.
Why this ranks high. Freshly registered planned asset and the registered operator is known. Small combined capacity (11.12 MW); a targeted external search found no reliable corroborating source yet, which is not proof that the project does not exist.
What we found
External verification: Searched, no reliable evidence found
A targeted search (4 queries) found no sufficiently reliable external source for this wind development in Northeim. This does not show that the project does not exist. No public procurement evidence was found in this verification run.
- Project company
- Energiekontor AG (registered in MaStR; not confirmed externally)
- Developer
- Not identified
- Project evidence
- None
- Commercial evidence
- None found
We searched and found no reliable external evidence yet. This is not proof that the project does not exist.
- News | Energiekontor AG
- Energiekontor – Umdenken lohnt sich | Energiekontor AG
- Energiekontor: Neue Windparks genehmigt | Energiekontor AG
No public procurement evidence was found in this verification run.
No independent external sources.
Registry lead relevance: 62 (unchanged by external verification)
Why it may matter
Possible relevance
Investigation hypotheses only. They are not evidence that any of these needs currently exist.
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
Verify next
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Change summary
- Planned units first observed
- 2
- Total registered capacity
- 11.12 MW
- Capacity per unit
- 5.56 MW each
- First observed in MaStR snapshot
- 22 Oct 2026
- Planned commissioning
- 01 Oct 2029
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (2)
SEE905677490874View official MaStR record ↗SEE923977784455View official MaStR record ↗
Grouping basis
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
MaStR technical details
- Asset type (MaStR)
- Horizontalläufer
- Energy carrier (MaStR)
- Wind
- Operating status (MaStR)
- In Planung
Evidence confidence
MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: searched, no reliable evidence found; a targeted search found no sufficiently reliable external source, which is not proof that the project does not exist. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.
Snapshot transition
First tracked snapshot → 22 Oct 2026