69Lead relevance · High
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance69
- Project scale (MW)13
- Event type20
- Lifecycle stage10
- Recency7
- Operator identified10
- Multi-unit evidence3
- External verification6
Signal materiality34
- Event type20
- MW affected9
- Units affected5
New planned wind development signal — 2 units / 13.6 MW
Ostrach, Baden-Württemberg · Operator: Uhl Windkraft Projektierung GmbH & Co. KG
2 planned units · 13.6 MW · First observed 22 Oct 2026
- MaStR evidence: HIGH
- Externally corroborated · 4 independent sources
What changed
2 new planned wind units totalling 13.6 MW were first observed in this MaStR snapshot.
Why this ranks high. Mid-sized 13.6 MW signal, freshly registered planned asset, the registered operator is known and external evidence identifies the project company and corroborates the development, increasing actionability.
What we found
External verification: Corroborated
External sources corroborate a planned wind development in Ostrach associated with Uhl Windkraft Projektierung GmbH & Co. KG. A public source also matches the registered project scale. At least one source refers to planning or permitting. Public project evidence found as early as 7 Mar 2025; GridGraph first observed the MaStR registration on 22 Oct 2026. No public procurement evidence was found in this verification run.
- Project company
- Uhl Windkraft Projektierung GmbH & Co. KG
- Developer
- Not identified
- Project evidence
- Strong
- Commercial evidence
- None found
- Bekanntgabe der Genehmigung des Windparks Ostrach der Firma Uhl Windkraft Projektierung GmbH & Co. KG in Ostrach | Landratsamt Sigmaringen
- Bevölkerung verunsichert: Gemeinde hat bald 32 Windräder um sich
- Windpark Ostrach West | Perigus Energy
- WP Ostrach - UHL WINDKRAFT - Windkraftanlage
- B E S C H E I D :
- UHL WINDKRAFT - Projektentwicklung von Windenergie
- Uhl Windkraft Projektierung GmbH & Co. KG WID - Windindustrie in Deutschland
No public procurement evidence was found in this verification run.
4 independent external sources.
Registry lead relevance: 63 → After external verification: 69 (+6)
Why it may matter
Possible relevance
Investigation hypotheses only. They are not evidence that any of these needs currently exist.
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
Verify next
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Change summary
- Planned units first observed
- 2
- Total registered capacity
- 13.6 MW
- Capacity per unit
- 6.8 MW each
- First observed in MaStR snapshot
- 22 Oct 2026
- Planned commissioning
- 01 Sept 2029
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (2)
SEE924771060363View official MaStR record ↗SEE947421967683View official MaStR record ↗
Grouping basis
Supporting registry evidence: Shared unit-name pattern (“ostrach…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
MaStR technical details
- Asset type (MaStR)
- Horizontalläufer
- Energy carrier (MaStR)
- Wind
- Operating status (MaStR)
- In Planung
Evidence confidence
MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: corroborated; 4 independent external sources at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.
Snapshot transition
First tracked snapshot → 22 Oct 2026