Schedule change
47Lead relevance · Moderate

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance47

  • Project scale (MW)8
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Size of change5

Signal materiality42

  • Event type16
  • Size of change20
  • MW affected6

Commissioning delayed by 243 days — 5.56 MW

Altenbeken, Nordrhein-Westfalen · Operator: Operator ID ABR967356715876 (name not resolved)

1 unit · 5.56 MW

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorOperator ID ABR967356715876 (name not resolved)

The registered planned commissioning date moved by +243 days (Oct 2026 → Jun 2027).

Why this ranks here. Unusually large schedule shift (243 days). Operator identity is unresolved, which reduces immediate actionability; it affects only one 5.56 MW unit; it may still reflect a registry correction rather than a new commercial need; no external evidence yet.

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.
Developer servicesEngineeringMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Planned commissioning
Oct 2026 → Jun 2027 (+243 days)

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisSingle unit
A single MaStR registration.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

22 Oct 2026 → 23 Oct 2026