Commissioned asset
34Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance34

  • Project scale (MW)8
  • Event type6
  • Lifecycle stage3
  • Recency7
  • Operator identified10

Signal materiality19

  • Event type12
  • MW affected7

Wind unit commissioned — 6 MW

Kirchhundem, Nordrhein-Westfalen · Operator: Windpark Kirchhundem GmbH

1 unit · 6 MW

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorWindpark Kirchhundem GmbH

1 wind unit (6 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 20 Oct 2026.

Why this ranks here. The registered operator is known. It affects only one 6 MW unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.
O&MAsset transactionsMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Registered capacity
6 MW
Commissioning date
20 Oct 2026
Lifecycle change
Planned → commissioned

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisSingle unit
Stable MaStR location ID: SEL970727006190
A single MaStR registration.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Betrieb

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

21 Oct 2026 → 22 Oct 2026

← Back to the brief · 2026-10-23