59Lead relevance · Moderate
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance59
- Project scale (MW)9
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- External verification2
Signal materiality27
- Event type20
- MW affected7
New planned wind unit — 7.2 MW
Velburg, Bayern · Operator: Max Bögl Wind AG
1 planned unit · 7.2 MW · First observed 23 Sept 2026
- MaStR evidence: HIGH
- Partially corroborated externally · 1 independent source
What changed
A new planned wind unit of 7.2 MW was first observed in this MaStR snapshot.
Why this ranks here. Freshly registered planned asset and the registered operator is known. It affects only one 7.2 MW unit; external corroboration is only partial.
What we found
External verification: Partially corroborated
Some external sources mention a wind development in Velburg associated with Max Bögl Wind AG, but the match to the registered project is incomplete. Public project evidence found as early as 22 May 2026; GridGraph first observed the MaStR registration on 23 Sept 2026. No public procurement evidence was found in this verification run.
- Project company
- Max Bögl Wind AG
- Developer
- Not identified
- Project evidence
- Partial
- Commercial evidence
- None found
- Velburg: Weltrekord-Windrad für Windpark Zieger – Zugeständnisse an die Bürger
- News
- Weltrekord für die Energiewende | windmesse.de
- Ausgerechnet das EEG-Gesetz könnte weitere Windräder in Mantlach verhindern
No public procurement evidence was found in this verification run.
1 independent external source.
Registry lead relevance: 57 → After external verification: 59 (+2)
Why it may matter
Possible relevance
Investigation hypotheses only. They are not evidence that any of these needs currently exist.
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
Verify next
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Change summary
- Registered capacity
- 7.2 MW
- First observed in MaStR snapshot
- 23 Sept 2026
- Planned commissioning
- 05 Nov 2027
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (1)
SEE934425208430View official MaStR record ↗
Grouping basis
A single MaStR registration.
MaStR technical details
- Asset type (MaStR)
- Horizontalläufer
- Energy carrier (MaStR)
- Wind
- Operating status (MaStR)
- In Planung
Evidence confidence
MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: partially corroborated; 1 independent external source at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.
Snapshot transition
First tracked snapshot → 23 Sept 2026