Timing change
Medium priority49
This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.
What this score is built from
- Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
- Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
- Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.
Commissioning delayed for 2 registered wind units in Erkelenz, Nordrhein-Westfalen
Erkelenz, Nordrhein-Westfalen
Asset typeHorizontalläufer
Energy carrierWind
Registered operatorMLK Windpark Holzweiler Nr. 100 GmbH & Co. KG
Commercial interpretation
A later registered planned commissioning date may indicate asset delay or rescheduling.
Change summary
- Registered units
- 2
- Asset type
- Horizontalläufer
- Energy carrier
- Wind
- Location
- Erkelenz, Nordrhein-Westfalen
- Registered operator
- MLK Windpark Holzweiler Nr. 100 GmbH & Co. KG
- Operating status
- In Planung
- Planned commissioning
- Sept 2026 → Oct 2026
- Change
- +35 days
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (2)
SEE950340927294View official MaStR record ↗SEE960303446205View official MaStR record ↗
Grouping basis
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Snapshot transition
22 Sept 2026 → 23 Sept 2026