Composite change
Low priority40
This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.
What this score is built from
- Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
- Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
- Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.
Major asset update in Veldenz, Rheinland-Pfalz
Veldenz, Rheinland-Pfalz
Asset typeHorizontalläufer
Energy carrierWind
Registered operatorJUWI GmbH
Commercial interpretation
Multiple material registration changes occurred in the same source transition and may warrant investigation.
Change summary
- Commissioning
- Mar 2028 → Sept 2028 (+182 days)
- Registered capacity
- 5.56 MW → 7 MW (+1.44 MW / 26%)
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (2)
SEE992111188688View official MaStR record ↗SEE927871590198View official MaStR record ↗
Grouping basis
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Snapshot transition
22 Sept 2026 → 23 Sept 2026