Multiple changes
66Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance66

  • Project scale (MW)15
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified4
  • Multi-unit evidence6
  • Several changes together5
  • Size of change5

Signal materiality64

  • Event type16
  • Size of change21
  • MW affected11
  • Units affected10
  • Several changes together6

Multiple registry changes (schedule + operator) — 4 units / 22.24 MW

Sömmerda, Thüringen · Operator: Operator ID ABR905693656667 (name not resolved)

4 units · 22.24 MW

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorOperator ID ABR905693656667 (name not resolved)

4 wind units registered a later planned commissioning date (+238 days to +320 days). The registered operator changed on 4 wind units.

Why this ranks high. Mid-sized 22.24 MW signal, 4 registrations moving together, schedule and operator changes recorded together on the same units and unusually large schedule shift (320 days). Operator identity is unresolved, which reduces immediate actionability; it may still reflect a registry correction rather than a new commercial need.

Several registry changes were recorded together on the same units. That may indicate a substantive update to the project rather than a routine correction, and is worth investigating.
Developer servicesEngineeringAsset transactionsFinancingMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Units with a new planned date
4
Planned commissioning before
01 Apr 2026
Planned commissioning now
25 Nov 2026 – 15 Feb 2027
Shift per unit
+238 to +320 days
Units with an operator change
4
Previous registered operator
Energiequelle GmbH
New registered operator
Operator ID ABR905693656667 (name not resolved)

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

  • SEE924401845049WP Sömmerda WEA 01 · 5.56 MW · 2027-01-11 · Apr 2026 → Jan 2027 (+285 days); operator → ID ABR905693656667View official MaStR record ↗
  • SEE964769476066WP Sömmerda WEA 02 · 5.56 MW · 2026-12-16 · Apr 2026 → Dec 2026 (+259 days); operator → ID ABR905693656667View official MaStR record ↗
  • SEE926090628903WP Sömmerda WEA 03 · 5.56 MW · 2026-11-25 · Apr 2026 → Nov 2026 (+238 days); operator → ID ABR905693656667View official MaStR record ↗
  • SEE953783680832WP Sömmerda WEA 04 · 5.56 MW · 2027-02-15 · Apr 2026 → Feb 2027 (+320 days); operator → ID ABR905693656667View official MaStR record ↗
Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wp sömmerda…”); Identical registered capacity; Planned/commissioning dates within 82 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

30 Sept 2026 → 1 Oct 2026