New planned asset
65Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance65

  • Project scale (MW)12
  • Event type20
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3
  • External verification2

Signal materiality34

  • Event type20
  • MW affected9
  • Units affected5

New planned wind development signal — 2 units / 12 MW

Borgentreich, Nordrhein-Westfalen · Operator: Bürgerwindpark Borgentreich GmbH & Co. KG

2 planned units · 12 MW · First observed 22 Sept 2026

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorBürgerwindpark Borgentreich GmbH & Co. KG

2 new planned wind units totalling 12 MW were first observed in this MaStR snapshot.

Why this ranks high. Freshly registered planned asset and the registered operator is known. Small combined capacity (12 MW); external corroboration is only partial.

External verification: Partially corroborated

Some external sources mention a wind development in Borgentreich associated with Bürgerwindpark Borgentreich GmbH & Co. KG, but the match to the registered project is incomplete. Public project evidence found as early as 5 Apr 2024; GridGraph first observed the MaStR registration on 22 Sept 2026. No public procurement evidence was found in this verification run.

Project company
Bürgerwindpark Borgentreich GmbH & Co. KG
Developer
Not identified
Project evidence
Partial
Commercial evidence
None found

No public procurement evidence was found in this verification run.

5 independent external sources.

Registry lead relevance: 63 → After external verification: 65 (+2) +2: identity or project only partially corroborated.

A newly registered planned asset may be an early sign of a development worth a quick look.
Developer servicesGrid & electricalEngineeringCivil / BOPMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Planned units first observed
2
Total registered capacity
12 MW
Capacity per unit
6 MW each
First observed in MaStR snapshot
22 Sept 2026
Planned commissioning
21 Sept 2028

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“bürgerwindpark borgentreich…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: partially corroborated; 5 independent external sources at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

First tracked snapshot → 22 Sept 2026