65Lead relevance · High
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance65
- Project scale (MW)12
- Event type20
- Lifecycle stage10
- Recency8
- Operator identified10
- Multi-unit evidence3
- External verification2
Signal materiality34
- Event type20
- MW affected9
- Units affected5
New planned wind development signal — 2 units / 12 MW
Borgentreich, Nordrhein-Westfalen · Operator: Bürgerwindpark Borgentreich GmbH & Co. KG
2 planned units · 12 MW · First observed 22 Sept 2026
- MaStR evidence: HIGH
- Partially corroborated externally · 5 independent sources
What changed
2 new planned wind units totalling 12 MW were first observed in this MaStR snapshot.
Why this ranks high. Freshly registered planned asset and the registered operator is known. Small combined capacity (12 MW); external corroboration is only partial.
What we found
External verification: Partially corroborated
Some external sources mention a wind development in Borgentreich associated with Bürgerwindpark Borgentreich GmbH & Co. KG, but the match to the registered project is incomplete. Public project evidence found as early as 5 Apr 2024; GridGraph first observed the MaStR registration on 22 Sept 2026. No public procurement evidence was found in this verification run.
- Project company
- Bürgerwindpark Borgentreich GmbH & Co. KG
- Developer
- Not identified
- Project evidence
- Partial
- Commercial evidence
- None found
- Der Landrat
- Bürgerwindpark Borgentreich will 21 Anlagen bauen | nw.de
- Borgentreich: Rat gibt 15 Windrädern grünes Licht
- Für Mensch und Natur – Gegenwind Heimat Hoher Berg e.V. – Bürgerinitiative für bewussten Umgang mit Windkraft
- Bürgerwindpark Borgentreich | DZ BANK AG
- Bürgerwindpark Borgentreich GmbH & Co. KG
- Bürgerwindpark Borgentreich GmbH & Co. KG - Betreiber von Windkraftanlagen | wind-turbine.com
- #windenergie #energiewende #windpark #windenergy #erneuerbareenergien #windparkborgentreich #energiewende #renewableenergy #greenenergy #windpower | ENERCON
- Bürgerwindpark Borgentreich GmbH & Co. KG, Borgentreich, Amtsgericht Paderborn HRA 8053: Netzwerk, Wirtschaftsinfos
- Rotorblatttransport einer Enercon E-175 EP5 | Bürgerwindpark Borgentreich - YouTube
- Borgentreich Community Wind Farm under construction & Peckelsheim-Eisser Höhe Wind Farm on 07/12/...
- Aufstellung des Teilflächennutzungsplans zur Ausweisung ...“Orgelstadt Borgentreich Aufstellung des Teilflächennutzungsplans zur Ausweisung von Bereichen für die Windenergie der Orgelstadt Borgentreich - Umweltbericht -”
- orgelstadt borgentreich“… esktop\Stellungnahme_Windkraft_1.2.docx Der Bürgermeister Am Rathaus 13 34434 Borgentreich An die Mitglieder des Ausschusses für Wirtschaft, Energie und Landesplanung Ortsnetzkennzahl Vermittlung Telefax 0 56 43 809 0 809 90 Orgelstadt Borgentreich online www.borgentreich.de E-Mail: info@borgentreich.de Es schreibt Ihnen: Bürgermeister …”
- SPD will "Wildwuchs" bei Windrädern in Borgentreich ...
No public procurement evidence was found in this verification run.
5 independent external sources.
Registry lead relevance: 63 → After external verification: 65 (+2)
Why it may matter
Possible relevance
Investigation hypotheses only. They are not evidence that any of these needs currently exist.
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
Verify next
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Change summary
- Planned units first observed
- 2
- Total registered capacity
- 12 MW
- Capacity per unit
- 6 MW each
- First observed in MaStR snapshot
- 22 Sept 2026
- Planned commissioning
- 21 Sept 2028
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (2)
SEE944389181168View official MaStR record ↗SEE961418176049View official MaStR record ↗
Grouping basis
Supporting registry evidence: Shared unit-name pattern (“bürgerwindpark borgentreich…”); Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
MaStR technical details
- Asset type (MaStR)
- Horizontalläufer
- Energy carrier (MaStR)
- Wind
- Operating status (MaStR)
- In Planung
Evidence confidence
MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: partially corroborated; 5 independent external sources at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.
Snapshot transition
First tracked snapshot → 22 Sept 2026