Operator change
35Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Registered operator changed across 13 registered wind units in Fehrbellin, Brandenburg

Fehrbellin, Brandenburg · Operator: WP Manker-Protzen GmbH & Co.KG

13 units · 88.4 MW

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorWP Manker-Protzen GmbH & Co.KG

A registered operator change may warrant investigation of the registered asset's current commercial context.

A registered operator change may warrant investigation of the registered asset's current commercial context.
Registered units
13
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Fehrbellin, Brandenburg
Operating status
In Planung
Registered operator
InVentus Energie GmbH → WP Manker-Protzen GmbH & Co.KG

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.

1 Jul 2026 → 11 Sept 2026

← Back to the brief · 2026-09-13