Commissioned asset
27Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

What this score is built from

  • Project scale (0-25 pts): total registered MW of the grouped units, on a diminishing-returns scale.
  • Event type (0-20 pts): a new planned asset, capacity change, operator change or schedule change each carry a fixed weight.
  • Lifecycle stage (0-10 pts): planning-stage assets score higher than already-commissioned ones.
  • Recency (0-8 pts): how recent the registry snapshot is.
  • Operator identified (0-10 pts): whether the registered operator name is known.
  • Multi-unit evidence (0-10 pts): number of units, discounted when grouping evidence is weaker.
  • Several changes together (0-8 pts) and size of change (0-7 pts, magnitude of a date or capacity change on a capped, logarithmic scale).

Asset commissioned: 2.67 MW Verbrennungsmotor Reken, Nordrhein-Westfalen

Reken, Nordrhein-Westfalen · Operator: Benning Agrar-Energie GmbH

1 unit · 2.67 MW

Asset typeVerbrennungsmotor
Energy carrierBiomasse
Registered operatorBenning Agrar-Energie GmbH

The registered asset moved from a planned MaStR operating status to a non-planned status.

The registered asset moved from a planned MaStR operating status to a non-planned status.
Asset type
Verbrennungsmotor
Energy carrier
Biomasse
Location
Reken, Nordrhein-Westfalen
Registered operator
Benning Agrar-Energie GmbH
Operating status
In Betrieb
Lifecycle change
Planned → commissioned
Commissioning date
2026-07-01

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisStable MaStR location ID — SEL930098932269

1 Jul 2026 → 11 Sept 2026

← Back to the brief · 2026-09-13